排氣總管 的英文怎麼說

中文拼音 [bèizǒngguǎn]
排氣總管 英文
exhaust collector
  • : 排構詞成分。
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 排氣 : [機械工程] exhaust; aerofluxus; air out; exit gas; ventilate; atmosphere; vent排氣泵 exhaust pump...
  1. Offering both breasts at each feed ( foremilkhindmilk imbalance ) the baby will be irritable, demands frequent feeds in spite of the mother s abundant milk supply, brings back his feeds, & passes explosive watery stools & flatus

    母親乳量充足,嬰兒卻是吃不夠而要求吃奶,並且顯得煩躁不安;出大量稀便和腹(放屁) 。
  2. In the third, this paper makes a survey on components of the exhausted flue gas and waste heat resource, and discusses the possibility and methods of steam generation and air preheating with the waste heat. and then, the analysis on the advantages and disadvantages of heat recovery plants with conventional steel - water heat pipes and inorganic heat - transfer heat pipes is carried out. the paper also gives a valuation about the plan and features of the design of heat recovery

    對余熱源煙的成分和余熱資源量進行標定,討論余熱回收產生蒸汽或加熱燃燒用空的可行性和方法,分析常規余熱回收技術設計、採用普通鋼-水熱和無機傳熱熱等傳熱元件的設計余熱回收裝置的優缺點,並對余熱回收設計方案及其特點進行體評價。
  3. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流量估算方法,為導流洞方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  4. Controlling total quantity of discharging of atmospheric pollutant is one effective and scientific management means, which takes controlled areas as one integrated system and adopts some effective means to reducing atmospheric pollutant discharged into the area to certain limitation, it aims at satisfying the quality requirement of atmospheric environment, it can resolve the problem of atmospheric pollution once and for all

    污染物量控制是將控制區域作為一個完整的系統,採取有效措施將入區域范圍內的大污染物負荷量控制在一定的數量之內,以滿足該區域的大環境質量要求,為大污染控制提供了科學有效理手段,從根本上解決大污染問題。
  5. Trouble shooting for small diesel engine s

    型機車柴油機排氣總管發紅故障分析
  6. Pressure test of through out pigging : inspect pipe deformation and construction quality. exhaust before water pressure test, drainage before manufacture, dryness and medium isolation

    通清試壓:檢測線變形、施工質量。水壓試驗前、生產前水、乾燥、介質隔離。
  7. Abstract : optimum distances between primary nozzle exit and mixing tube inlet, static pressure recovery of the mixing flow in mixing tube 、 total pressure distributions at the exit of mixing tube 、 pumping coefficients and total pressure losses of the exhaust ejector systems with four different types of primary nozzles have been measured in the experiments

    文摘:對4種主噴組成的引射系統的引射系數和壓損失、各主噴出口與混合進口之間的最佳間距、混合流在混合內的靜壓恢復及混合流在混合出口處的壓分佈等進行了測量和對比。
  8. To go beyond what climate specialists call the “ business as usual ” scenario, the u. s. must follow europe and even some of its own state governments in instituting new policies that affix a price on carbon ? whether in the form of a tax on emissions or in a cap - and - trade system ( emission allowances that are capped in aggregate at a certain level and then traded in open markets )

    為了進一步走向候專家所說一切如常的理想狀況,美國必須跟隨歐洲甚至自家州政府的腳步,制訂新的政策,為碳標上售價,不是對放量課稅,或是採取限量制與交易(在某種程度上放量,然後讓這些放量在市場上公開交易) 。
  9. T he land area planned for nanxiang high - tech park is 12000 mu. today, its infrastructure construction has been completed. water, gas and poewer supply, drainage system, and telecommunication network have all been installed. roads have been constructed and opened to traffic. around the park there are 7 banks, 6 supermarkets, 8 colleges and schools

    南翔園區體規劃土地面積約12000畝, 「七通一平」基礎設施一步到位:給水道接通、雨水放疏通、污水納入市政網、煤道聯通、電力系統、電信網路順通、 「四縱四橫」道路平坦暢通。
  10. Like most other bills on climate change, acsa involves a cap - and - trade scheme : the government sets an overall limit on emissions and then sells or gives away an equivalent number of tradeable permits to pollute

    和其他有關候變化的法案一樣, acsa ( 《美國候保護法》 )涉及了「限量?交易」 ( 「制與交易制度」 )機制:政府設定放量的上限,然後將放配額賣給或是贈送給企業。
  11. From august 2005 the epd required operators renewing their specified process licences for power plants to reduce their total emissions. previously, only the pollution concentration in emissions was controlled

    以往,環保署只是制發電廠廢的污染物含量,但在2005年8月,我們要求電力公司減低放量,方會續發指明工序牌照。
分享友人