排水的地基 的英文怎麼說

中文拼音 [bèishuǐdede]
排水的地基 英文
drained ground base
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 4次方是 The fourth power of 2 is direction
  • 排水 : drain off water; drain away water; dewatering
  1. This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation

    應用流體力學理論結合碼頭結構建設,分析了泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速與擋墻方法;運用質量守恆定律和滲流原理,建立了港口碼頭計算數學模型和過程計算公式,並用在了碼頭穩定設計計算中。
  2. With the establishment of the regional headquarter for asia pacific in shanghai in 2003, geberit underlined its commitment to china. esteemed as a pioneer in sanitary and piping systems, geberit is mastering all kind of in - building water flows. the broad product family ranges consist of flushing tanks and mechanisms, electronic sensors, traps, shower toilets, water drainage and water supply systems

    吉博力公司於1996進入中國,於1996年和1997年在浙江岱山和上海建立了兩個生產,主要生產節箱隱蔽式箱配件及各種管道系統,並銷售所有吉博力集團其它產品,如電子感應嘴,電子感應小便沖系統,高密度聚乙烯管道系統hdpe ,以及虹吸式屋面雨放系統等。
  3. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,板,下室,下道,管,氣口,泥和混凝土,等相關結構設備進行每季度,每半年,每年檢查和修理。
  4. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限規定:其中1 、礎工程和主體結構工程,為設計文件規定該工程合理使用年限; 2 、房屋防工程、有防要求衛生間、房間和外墻面防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給管道、設備安裝為2年; 5 、裝修工程為2年。
  5. Naval ships performing campaign task are surface battle ships, they are small tonnage and bat wave - keeping

    在沿海海區遂行作戰任務艦艇主要是我面戰斗艦艇,這些艦艇量小,耐波性差。
  6. Because of the advantages of prefabricated plastic drains over other vertical drains, this technology is widely used in recent soft clay foundation improvement in our country and it has been a main method in drainage consolidation methods

    由於塑料板與其它體相比具有諸多優點,近幾年來在國內軟粘土處理中被廣泛使用,塑料板法成為固結法中最主要方法。
  7. According to the distribution peculiarity of the two characteristic moments, the accessibility of water quality in taizhou source of yangtze river has been analyzed based on the maximal contamination zone of entire tide and the relationship between the length of contamination zone and the pollutant load. simultaneously, every project has been analyzed and compared by using the model in wuli lake water environmental renovation for getting some theoretic gist and technical supports for the engineering

    在此礎上進行泰州江段質數值模擬,建立污混合帶范圍與污量關系曲線,並對泰州江段供質可達性進行了分析;將模型應用於五里湖環境治理工程中,預測各引方案下湖體質狀況並進行各方案分析,從而為工程實施提供一定理論依據和技術支持。
  8. The finite element analysis of 3d seepage field for surrounding rock mass of cavern groups of underground powerhouses was performed based on the nodal virtual flux method for solving the non - pressure seepage field and the improved drainage substructure technique for accurately simulating the complex seepage behaviors of densely distributed drainage holes, with emphasis placed on the seepage properties of the anti - seepage concrete curtain and drainage curtain in the anti - seepage and drainage system

    摘要在求解無壓滲流場結點虛流量法礎上,結合可精細模擬密集孔復雜滲流力行為改進子結構技術,付某下廠房廠區洞室群圍巖區三維滲流場進行了有限元求解分析,著重研究了防滲系統中帷幕和滲流特性。
  9. Discussion on the plastic drain slab in dealing with engineering quality of soft soil groundsill

    塑料板處理軟土工程質量監理措施探討
  10. This article introduces the silt geology platform afterwards uses the powder spurts and the plastics drain off water the board and grille and back pressure protects etc design and the construction control of measure, the construction has the guidance meaning to the construction of the bridge abutment soft base

    摘要介紹了淤泥質臺后採用粉噴樁、塑料板、土工格柵、反壓護道等措施設計與施工控制,對臺后軟處治工程施工有指導意義。
  11. This paper evaluates the underground water resources and its safe levels of miming, and then studies the availability of molepipe drainage, a kind of practical underground water regulation technique. starting with the elevation of underground water resources and a safe level of mining through variable system theory, this paper analyzes the conditions of underground water resources based on the well - studied determination method of determining the two hydrographical coefficients : rainfall infiltration replenishment rate and irrigation replenishment rate. then considering irrigation, rainfall, drainage and other related factors, a mathematical model is set up for the calculation of underground water storage, exploitation on water regulation

    論文從灌區資源及其可開采量評價分析方面入手,在對兩個主要質參數即降雨入滲補給系數、灌溉入滲補給系數確定方法研究礎上,對灌區資源狀況進行分析,依據灌區灌溉、降雨、條件及各種現狀因素,建立了資源量計算數學模型,西安理工大學工程碩士專業學位論文計算得到青銅峽灌區最大補給量和可開采量;另外對在開發利用資源過程中調控進行了初步探討,在銀北灌區開展對暗管調控試驗研究。
  12. As viewed from the hydrogeochemistry of cretaceous groundwater in the south of baiyu mountain of the ordos basin, the article is focus on the groundwater horizontal distribution and the water chemistry about surface water base - flow

    摘要主要從球化學角度,以鄂爾多斯盆白于山以南區白翌系化學平分帶和化學特徵為主要依據,結合質構造格局及巖相古理條件,分析研究了該區白翌系補、徑、條件。
  13. Aim at the present condition that the permeability of high rank coal reservoirs and its dynamic change regulation have been rarely studied, based on the modern testing technologies and actual measure data of coalbed methane ( cbm ) well with better drainage effect in qinshui basin, using the international advanced cbm well numerical simulation software ( comet2 ), the dynamic change regulation of the permeability of high rank coal reservoirs during gas recovery has been discussed, using the gas and water recovery process in divided stage is matched

    摘要針對高煤級煤儲層滲透率尤其是其動態變化規律極少開展研究現狀,於現代測試技術和沁采效果較好煤層氣井實測采數據,利用目前國際上較為先進煤層氣數值模擬軟體comet2 ,採用分段擬合方法對煤層氣井產氣、產過程進行歷史擬合和修正,進而對高煤級煤儲層滲透率在開采中動態變化規律進行了探討。
  14. The main aim of system harness of man - made debris flow is to make potential debris flow not broken out and present debris flow decreased

    控制固體物質補給是關鍵,合理設計規劃棄土石渣放場是重點,搞好匯土保持系統工程是礎,調整溝床比降,減少流動能,使泥石流暴發減少到最低程度。
  15. Because of deposit the ground form, wide soft soil and large thickness, we should use the methods to set up the standard design., such as to change and fill out a stone, lump block of stone of the strong rammer and split off the thick liquid of note and so on

    摘要深圳市港灣大道沿線屬前海灣沿岸海漫灘沉積貌,軟土層分佈范圍廣、厚度大、性狀極差,闡述該路採用換填塊石、劈裂注漿、插板堆載預壓、強夯塊石墩等處理方法,進行了標準設計。
  16. Through setting interior drainage system, water saved in the pavement structure can be eliminated from subgrade and pavement structure, and it does good to improve the pavement performance and prolong the service life of pavement

    設置路面結構內部系統,能夠將積滯在路面結構內分迅速出路、路面結構外,有利於改善道路使用性能,延長路面使用壽命。
  17. There are many ways to handle the soft soil, such as : use the sand mat as a layer, carry to press in advance, press by thin film in the vacuum in advance, drain by use the sand well, drain by plastics plank, and reunite the foundation

    軟土處理有許多方法,如:砂墊層,堆載預壓法,薄膜真空預壓法,袋裝砂井法,塑料板法,復合法。
  18. First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor

    作者在進行歌樂山質環境調查礎上,仔細分析了大量觀測資料,研究其儲構造,掌握動態變化與隧道施工涌關系,及補給受降雨影響情況。對隧道周圍進行動態分析、回歸分析、常規化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷巖溶發育特徵,及循環交替條件、補給泄途徑;統計分析裂隙測量數據,計算滲透張量。
  19. The difference between disturbed soft clay and field soft clay is compared, and the example suggests that the disturbance degree resulted from the construction of prefabricated band drains is about 30 %. the disturbance slower the consolidation of the soft clay ground, and the extra settlement resulted from disturbance is also notable. to verify the theory developed herein, the analytical solutions are compared with the field measured ones, which shows that they are in a good agreement

    實例分析表明,施打實際擾動度約為30左右,擾動減緩了固結速率,引起附加沉降量也是相當明顯,考慮土結構性沉降計算方法得到計算結果和實際固結沉降量較為吻合,說明了計算理論可靠性和合理性。
  20. Based on the data of vertical and horizontal displacements from a certain construction site in cixi city of zhejiang province, the validity of controlling earth - extrusion effects in saturated soft clay ground caused by statically piling was quantitatively analyzed and compared with different technical measures, including reduction of piling rate and installation of stress - relax holes

    摘要根據在浙江省慈溪市某靜壓法沈樁施工現場所監測土位移數據,定量分析比較了控制施工進度、設置應力釋放和深孔等工程技術措施對減輕飽和軟粘土沈樁擠土效應有效性,並初步提出了現場土位移及其變化速率監控標準。
分享友人