排水措施 的英文怎麼說

中文拼音 [bèishuǐcuòshī]
排水措施 英文
drainage measure
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞1 (安排; 處置) arrange; manage; handle 2 (籌劃) make plans 3 [書面語] (施行) execute; a...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 排水 : drain off water; drain away water; dewatering
  • 措施 : measure; step
  1. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏工程引隧洞灌漿圈圍巖具有較好的防滲性能,將高外壓力控制在灌漿圈以外,再配合透性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  2. In view of the problems of the underground water pollution caused by the direct discharge of the original dust removing water of converter that had poor quality and the old and backward processing facility of converter slime which had poor processing results, a series of measures such as using box filters have been taken so as to fully recycle the dust removing water of converter and recover the slime. as a result, the water is saved and the pollution eliminated, which has brought remarkable social and economical benefits

    針對原轉爐除塵污質較差,直接外對地下造成污染;轉爐污泥處理設陳舊落後,處理效果差等問題,採用廂式過濾機處理等一系列,使轉爐除塵污全部循環,污泥全部回收,既節約用,消除污染,又收到明顯的經濟和社會環境效益。
  3. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡擋墻、地表、整坡填縫、生物防護等多種工程優化組合而成。治理后,在飽有地震荷載狀態下滑坡的安全儲備系數為1 . 10 。
  4. Drainage usually has to be undertaken as a first operation.

    第一步通常採取排水措施
  5. Article 24 the local people ' s governments at various levels sha1l organize agricultura1 collective economic organizations and farmers to manage in a planned way the cultivated land with a slope of above 5 degrees but under the reclamation - forbidden degrees, by taking in line with different conditions such water and soil conservation measures as regulating drainage systems, building terraced fields, and practicing a method of cultivation conducive to water and soi1 conservation

    第二十四條各級地方人民政府應當組織農業集體經濟組織和農民,有計劃地對禁止開墾坡度以下、五度以上的耕地進行治理,根據不同情況,採取整治系統、修建梯田、蓄保土耕作等土保持
  6. Measures aimed at reducing urban temperatures include the installation of water - retaining pavements, watering systems that use recycled water and the planting of turf at school yards

    這些包括儲設備用於的重復使用的系統的設置及校園內草地的培植,目的在於控制城市的氣溫。
  7. The cure measures are mainly to cut the top of loess slope, to drain terrene water, and so on

    治理主要是合理處理人工谷緣和除地表等。
  8. At the same time, the main feature of structure on atria is a floor opening or series openings connecting two or more stories. this structure feature has challenged the traditional smoke control technology, which is the concept of floor - to - floor compartmentation, adopted in tradition buildings

    但是中庭建築在豎直方向上連續貫通數層的結構特點,卻向傳統建築設計中所採用的平分區、垂直分隔的防提出了挑戰。
  9. 4. according as geologic examination, and feasibility and science and economy of scheme, this dissertation offers two schemes to resistance slide

    4 .依據地勘資料,並結合方案的可行性、科學性、經濟性等,本文提出了大河壩滑坡治理方案主要採取抗滑樁加排水措施
  10. First scheme is cantilever anti - slide pile with drain system ; the other scheme is pre - stress anchor rope anti - slide pile with drain system

    方案一為採用懸臂抗滑樁加排水措施;方案二採用抗滑錨樁加排水措施
  11. The artificial improvement of drainage could soon lead to a marked loss in nutrients.

    採用人工排水措施可以迅速導致養分含量顯著降低。
  12. Guide to trench excavations shoring support and drainage measures

    有關壕坑挖掘工程的支撐設備及排水措施指引
  13. The article introduces the waterproofing and drainage measures and materials for the dam, the foundation of the permanent lock and some buildings of the three gorges project

    介紹了三峽工程中大壩、永久船閘基礎及一些建築物的防排水措施和所用材料。
  14. At last, based on the feedback analysis of the data of site investigation, the suggestions about whether to supply drainage measures in the catchment of high - ductility soil area are provided

    最後根據現場觀測資料進行了反饋分析,對在高塑性土區下游側是否有必要增加補充排水措施提出了論證意見。
  15. ( 2 ) when tunnel water is blocked up fully behind the lining, water pressure on the lining will reach maximum at last so long as surrounding rock near the lining is infiltrative no mattter how much the permeability coefficient of surrounding rock is

    ( 2 )隧道採用完全不排水措施時,只要襯砌附近的圍巖滲,襯砌背後與含圍巖有力聯系,不論滲透系數多大,襯砌背後最終壓會達到靜壓,計算時壓不宜折減。
  16. Inter - floor reuse of domestic wastewater is an effective measure to improve the efficiency using of water and reduce sewerage drainage

    摘要生活廢跨層再利用是提高生活用效率與減少污放量的有效節
  17. Positioning of culture and the model of culture construction

    建築給探討
  18. Including the main body of the subgrade, protecting and supporting engineering. drainage equipment of road, culvert and the transition zone between the road and the bridge. through investigating the types of diseases, the author discusses the existing problems and causes of producing diseases, puts forward the protective measures in design and construction, and raises the treatment measures in highway maintenance, which makes it more scientific and perfect for highway construction and maintenance in the loess areas

    論文首先對黃土的工程特性及其影響因素進行了分析,然後對黃土地區路基病害及其防治技術進行了研究,具體包括路基主體、防護與支擋工程、公路、涵洞及路橋過波段等部分,對病害類型進行了調查,分析了使用中存在的問題與病害產生的原因,提出了在設計與工中應採取的防範,給出了養護中的處治對策,使我國黃士地區公路建設與養護更加科學和完善。
  19. The bureau is taking steps to upgrade storm water and wastewater facilities including sewer pipeline systems and pumping stations, and develop facilities to strengthen controls over rainwater overflow

    因此,下道局和抽站正採取增強雨能力,整備控制雨溢出的設
  20. Allocate the principle of the basis of the cubic metre of earth and stone, combine the characteristics of limestone geology of mountain area and ecological environment, we set up the mathematical model of the linear programming, which is suitable for limestone mountain area large system cubic metre of earth and stone of expressway, meanwhile we put forward systematic thinking of treatment and method through the remaining cubic metre of earth and stone after allocating, at the same time, we give the protective measure on abandon soil field and fetch earth field about environmental ; making the discussion on medical treatment of natural river system and underground river system of the slope recover

    根據土石方調配原則,結合石灰巖山區地質和生態環境的特點,建立了適合於石灰巖山區高速公路的大系統土石方調配線性規劃數學模型,同時對通過調配后剩餘的土石方提出了系統的處理思路和方法,並對棄土場提出了系統的環境保護;對各種的設置與自然系的調治恢復相結合做了初步探討。第三,路塹邊坡環境恢復。邊坡景觀是公路景觀的重要組成部分,是高速公路環境保護研究的主要內容。
分享友人