排渣溝 的英文怎麼說
中文拼音 [bèizhāgōu]
排渣溝
英文
slag drain-
The coffee grains plugged up the kitchen drain
咖啡渣堵塞了廚房排水溝。The main aim of system harness of man - made debris flow is to make potential debris flow not broken out and present debris flow decreased
控制固體物質補給是關鍵,合理設計規劃棄土石渣的排放場地是重點,搞好匯水區水土保持系統工程是基礎,調整溝床比降,減少水流動能,使泥石流暴發減少到最低程度。The construction includes 31 buildings, including administration building, maintenance factory, wheel - cutting factory, signals and telecommunication facility control room, machinery and electricity equipment factory, etc. furthermore, there are also several kinds of equipments facility : such as, oil tank, gasoline station, automobile - washing factory, way dregs storage area, way dregs loading machine shelter, water discharge channel, wasted water pipe line and scenic spots facility, etc
工程內容包含有31棟建築物如行政綜合大樓檢驗修理廠車輪鏃削廠號志及通訊設備機房機電與工務設備廠等。另有各項設備施如:油槽加油站洗車廠道渣儲存區,道渣裝卸機棚排水溝渠污水管線景觀設施等。
分享友人