掙值管理 的英文怎麼說

中文拼音 [zhēngzhíguǎn]
掙值管理 英文
earned value management
  • : 掙動詞[書面語] (刺) stab; prick
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • 管理 : manage; run; administer; supervise; rule; administration; management; regulation
  1. In this thesis, the traditional windage analytical method that comparing the actual cost with the planning cost can not control the implementary course of project, an effective project management and control technique which is very popular in nowadays is used for reference - - earned value method basing on performance analyzing, the main aim is to use the earned value exponential to analyze the fluctuant complexion of the time limit and cost for a project, and all the influences made by the fluctuant complexion, and the developing trend of the time limit and cost for a project

    本文提出了傳統的用實際發生成本與計劃成本進行比較,來衡量項目進展情況的偏差分析法不能全面地監控項目實施過程,借鑒了在目前項目實踐當中被普遍採用的一種有效的項目和控制技術:基於績效分析的法,其根本目的是要使用該指數分析項目工期和項目成本各自出現的變動情況、這些變動所造成的相互影響、項目工期與項目成本的未來發展趨勢。
  2. Evms earned value management system

    掙值管理系統
  3. Lastly, some measures about integrate earned value and risk management are put forward, which is based on the process of earned value project management

    最後,以掙值管理系統的流程的規劃、實施、檢查、改進四個階段為主線,提出了若干掙值管理與風險的整合措施。
  4. The earned value method of modern project management body of knowledge is originated from the “ cost / schedule control system criteria ”, which was put forward by the department of defense ( dod ) of usa in 1967

    現代項目知識體系中的項目分析方法的雛形來自於1967年美國國防部推出的「成本進度控制系統規范( c / scsc ) 」 。
  5. At the situation that the computer information system project builds at present, the paper mainly sets forth the management evm ( earned value management ) method specifically in the computer information system project built at present

    摘要本文針對目前計算機信息系統項目建設的現狀,闡述了在計算機信息系統集成項目建設中為了控製成本所採用的掙值管理方法。
  6. Through the systematical analyses measure, which combine classical model of project management and latest modern theory, the thesis integrative analyses the every factor which belong to scope management s time management 、 cost management 、 quality management 、 risk management 、 human resource management 、 procurement managements communication management and integration management of hunan international convention and exhibition center. especially research the effective and practical measure, which include time management of wbs s systematic model measure of risk management s earned value of investment control etc. it has continuous improved and developed the practice of project management, has realized the transform procedure from theory study to practical application. at the same time, the thesis discuss the development thinking of convention and exhibition economy, discuss the future study direction of project management science in our country, summarizes and evaluates the achievement which result from exce llent project management

    論文採用項目經典模式與最新前沿論相結合的系統分析方法,對湖南國際會展中心項目的范圍、時間、成本、質量、風險、采購、人力資源、溝通和集成中諸要素進行了優化分析,重點研究了基於wbs進度、系統模型法風險法投資控制等行之有效的、符合項目實際的項目技術方法,並在項目實踐中不斷完善和發展,實現了從論研究到實踐應用的轉化過程。
  7. The basic principle of earned value is introduced in this paper and the contents of project risk management are also included. based on analyzing of merits and shortcomings about earned value and risk management, it is likely to integrate them. the paper has a hot talk about the method of calculating the earned value indexes when the schedule of activity is fixed

    接著,著重討論了項目活動持續時間均服從pert三點估計時項目在各觀察點的績效指標的計算方法,給出了某一項目在該種情況下各觀察點的最可能的績效指標的模擬結果,並在分析了這些績效指標的曲線特徵的基礎上,探討了掙值管理中的風險控制問題。