掛鐘 的英文怎麼說
中文拼音 [guàzhōng]
掛鐘
英文
wall clock; wag-on-the-wall-
He lifted his eyes, and looked at the clock and the barometer on his right hand and on his left.
他抬起眼皮來,看看左右的掛鐘和風雨表。He raised his eyes and met the stare of a bilious clock
他抬起雙眼,跟那座逼視著的掛鐘打了個照面。Electric bells and speaking tubes afforded communication with the lower stories ; while on the mantel stood an electric clock, precisely like that in mr fogg s bedchamber, both beating the same second at the same instant
壁爐上面有個電掛鐘,它跟福克先生臥室里的掛鐘對好了鐘點。兩個鐘準確地同時敲響,一秒鐘也不差。The minute hand of a clock is 20cm, how many centimeters is the distance which the minute hand runs along the clock once
一隻掛鐘的分鐘長20厘米,這根分鐘的尖端轉一周所走的路程是多少厘米?Dummy camera, cctv camera, optical lens, wall clock, pedometer, notebook cooling pad, mp3 case speaker, mini - tripod, wireless door bell, wireless head set. etc
(生產、經營)產品及類型介紹:模擬監控器,監控器,霧鏡,掛鐘,計步器,筆記本散熱器, mp3功放包,迷你支架,無線門鈴,無線耳機等The visitor was introduced into the drawing - room, which was like all other furnished drawing - rooms. a mantle - piece, with two modern s vres vases, a timepiece representing cupid with his bent bow, a mirror with an engraving on each side - one representing homer carrying his guide, the other, belisarius begging - a grayish paper ; red and black tapestry - such was the appearance of lord wilmore s drawing - room
沒有特別的地方,一隻壁爐,壁爐架上放著兩只新式的瓷花瓶:一架掛鐘,掛鐘頂上連著一具張弓待發的戀愛神童像一面兩邊都刻花的屏風一邊刻的是荷馬盲行圖,另一邊是貝利賽行乞圖灰色的糊壁紙用黑色飾邊的紅色窗簾。If you specify the duration only, you enable microsoft project to schedule the clock - hanging flexibly, moving the start date forward or back if the wall - painting occurs later or earlier than planned
如果只指定工期, microsoftproject便能靈活地排定懸掛鐘表的日程,如果粉刷墻壁比原規劃有所提前或推遲,懸掛鐘表的開始日期也就相應地提前或推遲。For example, if you specify a fixed start date for hanging clocks on a wall and the date for painting the walls slips, you and the clocks are going to get awfully messy
譬如,如果為懸掛鐘表指定了固定的開始日期,但是粉刷墻壁的日期有所推遲,那麼您的項目和這些鐘表就會出現混亂。Hall clocks. central fixing screw
大掛鐘.中心固定螺孔Copyright2006 yiwu gongsun clock co., ltd
工藝鐘系列掛鐘系列For example, if hanging clocks for an exhibit is a critical task, you can reduce its scope by hanging fewer clocks than originally planned
譬如,如果懸掛展覽會的鐘表是一項關鍵任務,則減少懸掛鐘表的數目,即可縮小其范圍。For example, painting museum walls and hanging clocks are tasks that, when combined with other tasks, result in the completion of a clockwork exhibit
譬如,粉刷展覽館墻壁和懸掛鐘表都是任務,和其他任務組合起來,產生的結果就是完成鐘表藝術展覽會。* * * the work can overlap. if the museum crew prepares one gallery wall at a time, maybe they can start hanging clocks before all the walls are finished
譬如,博物館全體工作人員準備依次布置陳列室的墻壁,則他們可以在所有墻壁粉刷結束之前就開始懸掛鐘表。For example, the exhibit planner might add lag time between painting a wall and hanging clocks on the wall, because the planner knows the paint will take time to dry
譬如,展覽會的計劃者可能在粉刷墻壁和在墻上懸掛鐘表之間添加延隔時間,即塗料乾燥所需的時間。For example, if the museum crew already knows where each clock is going to hang on the walls, they can begin attaching descriptive labels below each clock ' s space while they are hanging clocks
譬如,如果展覽會工作人員知道各個鐘表懸掛的位置,那麼他們在掛鐘表的同時就可以在每個鐘表的位置下貼上說明標簽。For example, in preparation for a clockwork exhibit, the tasks " painting the walls, " " hanging clocks, " and " arranging furniture " are scheduled for monday, tuesday, and wednesday, respectively
譬如,在鐘表裝置展覽的準備工作中, 「粉刷墻壁」 、 「懸掛鐘表」和「布置傢具」三項任務分別安排在周一、周二和周三。Once these tasks are linked, microsoft project will always schedule the start date for hanging clocks relative to the finish date for painting walls, no matter when these tasks occur
這些任務相互鏈接后,無論它們何時發生, microsoftproject總會根據「粉刷墻壁」任務的完成日期來排定「懸掛鐘表」任務的開始日期,從而避免將任務限制在某個可能無法實現的固定日期。Later on, as you enter additional information about tasks, such as their dependencies on other tasks ( for example, hang clocks on the wall only after the paint has dried ), microsoft project automatically sets more realistic start dates
輸入任務的附加信息以及對其他任務的依賴性(譬如,在粉刷乾燥后,才懸掛鐘表)后, microsoftproject將自動設置實際的開始日期。However, by switching furniture arranging ( which does n ' t depend on the walls being dry ) to tuesday and hanging clocks to wednesday, the project stays on schedule, without wasting days or possibly increasing the project duration.
然而,通過將傢具布置(它不依賴于墻是否乾燥)調換到周二,懸掛鐘表調換到周三,就可以保證遵循項目的日程,而不會浪費時間和增加工期。The clock on the wall said a quarter to ten
墻上的掛鐘指著九點三刻。分享友人