控制地面沉降 的英文怎麼說

中文拼音 [kòngzhìdemiànchénjiàng]
控制地面沉降 英文
bring surface subsidence under control
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. Based on the development feature analysis, this paper studies thoroughly the reservoir flood feature and remaining oil distribution through the microstructure, sendimentary phase, reservoir heterogeneity and well control, and proposes the comprehensive adjustment based on the injection and development well net structure and improvement the result of the research is obvious with the production degression rate from 9. 14 % of 1997 to present - 1. 46 %, and water rate from original 0. 33 % to present 0. 16 %. in summary, the research idea, method and new achievement of the thesis provide a scientific geological basis for the oilfield development improvement

    在對本區開發歷程和開采特徵分析的基礎上,從微構造、積微相、儲層非均質性、井網等方深入分析了油藏水淹特徵及剩餘油分佈規律,提出了以完善注采井網、調整注采結構為目的的綜合調整措施,已見到了明顯的效果:油田遞減由1997年的9 . 14至目前的- 1 . 46 ,綜合含水上升率由原來的0 . 33至目前的0 . 16 。
  2. In order to control the land subsidence, adjusting three dimensional exploitive positions and moderately utilizing the leakage recharge from its upper shallow groundwater play a key role in realizing the sustainable development of deep groundwater resources in this area

    控制地面沉降的條件下,深層下水持續利用的對策是調整開采三維布局,適度開發利用淺層下水對深層下水的越流補給。
  3. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法施工,現實解決了樁、土與筏板接觸的變形協調關系;通過對樁、土受荷過程的實際測試,得出了樁、土分擔荷載比例和變化過程,從而為樁、土的荷載計算提供實際依據;從設置的大量觀測點中所得到的資料,得出荷載、變化規律,從而指導在實際施工中,防止加載過快而導致速,避免由此帶來的土體破壞的嚴重後果;通過規律分析,得出了適用於軟土區的樁基計算方法,用於指導實際施工,以滿足的強性標準。
  4. Analysis of the reason and control of ground settlement of subway at guangzhou subway no. 2 line kecun contact line fork

    廣州鐵客村聯絡線岔口段隧道工程原因分析及
  5. Based on the treatment engineering of 26 kilometers lacustrine deposits soft soil foundation in han - sha sect of yi - huang freeway, the paper, through the means of centrifugal model test and field observation, establishes mathematical analysis model, completely and detailedly researches and analyses the stability of lacustrine deposits soft soil foundation and the rule of settlement, guides the large - scale construction of yi - huang freeway 26 kilometers soft foundation treatment, educes the settlement characteristic and the rule of lacustrine deposits soft soil subgrade, summarizes the scientific measure of effectively controlling the stability and settlement of such kind of foundation

    本文以宜黃高速公路漢沙段中的26公里湖相積軟土基的處理工程為依託,通過採用離心模型試驗與現場原位監測相結合的手段,建立數學分析模型,對湖相積軟土基的穩定性及規律進行了全、細致的研究與分析,指導了宜黃高速公路26公里軟基處理的大規模施工,得出了湖相積軟土基路堤特性及規律,提出了有效此類基穩定性及的科學措施。
  6. An active measure for ground subsidence control is to move the exploited horizon upward to shallow area and make it close to the recharge and discharge area of groundwater

    控制地面沉降的一個積極措施是將開采層位上移至淺層,使其接近下水的補給區和排泄區。
  7. The results are of great practical significance on the efficient development of geothermal water and the control of land subsidence in practice. the models can also be applied to the areas with homologous hydrogeological condition

    研究成果對于進一步揭示福州溫泉區下熱水動態特徵,對于福州下熱水資源合理開發利用,有效控制地面沉降具有重要的實際意義。
  8. To discuss the feasibility of applying this technique into the practice of engineering, this paper references the real project of the running tunnel from great showplace to scientific house in shenzhen metro, uses the geotechnical centrifuge of southwest jiaotong university, then researches the settlement of the ground and the influence on the pipeline underground in stratum with abundant water by the technique of undraining spin - spay pile, at last draws a conclusion about the principle of the ground settlement with the construction method of excavating soil rich in water without dewatering at shenzhen metro

    為了探討離心模型試驗技術這一研究手段在下工程中應用的可行性,結合質、水文、結構較為復雜的深圳鐵大科區間暗挖施工sk3 + 355斷的具體實例,應用我校新近建成的100gt土工離心試驗機,採用離心模型試驗技術對在富水層應用水平旋噴樁工藝進行水施工對變形及下管線的影響進行了研究。
  9. In areas where groundwater has already been overdrawn, strict control on drawing shall be imposed and effective measures shall be taken to protect groundwater resources and control land subsidence

    下水已經超採的區,應當嚴格開采,並採取措施,保護下水資源,防止
  10. This model reveals the characteristics of the system of the groundwater, reflect the pattern of change and transportation of groundwater, and it can give scientific support to the prediction of groundwater table, evaluation of resources and give scientific support to control the subsidence in yancheng

    建立的三維模型反映了研究區下水系統的本質特徵,再現了下水的水位動態、運移規律,能為下水水位預報、資源評價和提供科學依據。
  11. Conclusions as following have got through test study : ( 1 ) when impact compaction technology is applied to treat collapsible loess subgrade, the effect depth may be treated generally can not override 80 cm and impact compaction pass is optimum at 30 times. ( 2 ) for stratified impact compaction of subgrade, when compactness of each level reaches codeslstandards loose laying depth of 80 cm fits 40 impact compaction pass is the optimum combination of subgrade construction. when average compactness in each level reaches codeslstandards loose laying depth of 80 cm fits 30 impact compaction pass is the optimum combination o ( 3 ) the quality control method may request impact compaction pass as the main control index and at the same time the final division settlement is less than 10 % of total settlement as large area subgrade is constructed

    通過試驗研究主要得出如下認識:沖擊壓實技術處理濕陷性黃土基時,其有效處理深度一般不超過80cm ,沖壓遍數以30遍左右為宜;對路基分層沖壓,在要求土體中各點壓實度均達到規范要求時,路基沖壓最佳組合為虛鋪厚度80cm 、沖壓40遍;在只要求土體平均壓實度達到規范要求時,路基沖壓最佳組合為虛鋪厚度80cm 、沖壓30遍;大積施工時,質量方法可按照在以沖壓遍數作為主要指標的同時,要求最後10遍分計量小於累計量10 ;在施工單位自己購置沖擊壓實機情況下,與傳統施工相比較,沖擊壓實技術是一種既能節約資金又能大量縮短工期的施工方法。
  12. Centrifuge model test technique preferably solves two problems : one is the gravity loss of the model soil, the other is the coupling problem between the seepage field of the ground water and the stress field of the stratum, which is a guidance for other deformation controls under the similar condition

    離心模型試驗技術較好的解決了在下工程研究中模型土體的自重損失和層位移分析中下水滲流場和層應力場相互耦合作用問題,對于在相似條件下富水層隧道開挖施工如何變形的研究方具有指導意義。
  13. It is suggested that the distribution of the depositional systems and the depositional facies have the clear characteristic that in the north of the research area, the alluvial fan sediment, the fluvial system and the delta system are the main styles of the depositional system, towards to the direction of basin the lacustrine, the barrier, the carbonate ramp system become the main depositional systems

    受海平變化,區內積體系和積相的分佈具有明顯的分帶性,北部靠近源區以沖積扇或河流及三角洲積為主,向盆方向以湖泊或海岸障壁-瀉湖、碳酸鹽緩坡積為主。中二疊世北部源區發生構造抬升,當時古氣候逐漸乾燥,成煤環境結束,積物以陸相河流、湖泊三角洲占優勢。
  14. Reliability : combined with actual examples of gyratory sprayed piles and complex foundation piles this chapter describes selection of gyratory sprayed pumping, scope, spraying materials, determination of gyratory spraying parameters, quality inspection and detailed construction process. based on the results the article summarizes settlement laws through analysis of ground base settlement observation materials and this shows that after treatment ground base settlement was reduced greatly and the method is effective

    本文結合工程實例分析了注漿以後形成的旋噴樁以及復合基的力學特徵,然後對旋噴注漿方案的選擇、注漿邊界范圍、注漿材料、旋噴參數的確定、旋噴質量檢驗方法等具體施工過程進行了詳細描述,通過對工程處理后觀測資料的分析,表明處理后量有了明顯低,說明該方法在非常有效。
  15. This topic makes attempt to make spatial relationship between tunnel construction and pipeline through surface settlement to control pipeline deformation indirectly, that is, surface deformation value is deducted reverse by allowable deformat ion value

    即根據管線的允許變形值來反推出表允許的變形值。本課題在這方做了一些嘗試。即:確定表最大值whx作為目標值,即通過管線的變形。
分享友人