控制測量 的英文怎麼說

中文拼音 [kòngzhìliáng]
控制測量 英文
control survey, control surveying
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. During construction of donghai bridge of yangshan deep - water port, bedrock bench mark, which is an important surveying datum mark, played an important part in control survey and elevation transmission

    摘要基巖標是重要的基準設施,在洋山深水港東海大橋的工程建設中發揮了控制測量與高程傳遞的重要作用。
  2. 2. press set key at five sec is unlash after display p - s, here display s number is code, if function is going to recompose, please number was 18 first, again press set key is come into function set. it can automatism backing out up to snuff work, if it is dont press set key or code is error

    2按set鍵5s直至顯示p - s後放開,此時顯示的數值為密碼,若要修改儀表功能,請把數字修改成88 ,再按set鍵,即進入功能設置,如果不按set鍵或密碼錯誤,則自動返回正常控制測量
  3. Cadastral control survey

    地籍控制測量
  4. This paper unite surveys works in dong gua shan mines construction under 1 km place researching four key technology in mine s survey, they are construction survey technology in km deep mine, km deep mine s connected survey technology, km deep level survey technology of longer distances link up in many heads opening and basic control survey technology, km mine s extension when the production must go on accurate fixed position survey technology, and all obtained success

    本文結合在千米以下冬瓜山銅礦建設時期的工作,研究了深部礦山四個方面的關鍵技術,即千米深井施工技術、千米深井聯系技術、千米深井中段多頭開拓長距離貫通和基本控制測量技術、千米深井不停產延深精密定位技術,並取得了成功的效果。
  5. Other control measurements are normally made across the joints or at the base of the principal cantilever to determine the eventual separation movements.

    通常沿著各條接縫或主懸臂梁的基底作其它控制測量,以確定最後的分離運動。
  6. Application of gps in controlling measurement of the enterprises

    在企業控制測量中的應用
  7. Hong kong control survey system

    香港控制測量系統
  8. Control survey of mining area

    礦區控制測量
  9. Topographic control surveys

    圖根控制測量
  10. Horizontal control surveys

    平面控制測量
  11. Graphic control survey

    圖解控制測量
  12. Standard digital interface for programmable instrumentation

    可程式控制測量設備的標準數字介面
  13. Control, measurement and automation for industrial processes. symbolic representation. part 4 : additional detailed symbols for instrument interconnection diagrams

    工業過程的控制測量和自動化.符號表示法.第4部分:儀表互連接圖的詳細補充符號
  14. Construction technique for precise controlling and measuring roadbed slab of long sleeper buried type ballastless track

    長枕埋入式無碴軌道道床板精確控制測量施工技術
  15. Under this circumstance, the advanced instruments and techniques such as total station and gps are applied during the construction survey, which play important roles in the controlled survey and the detailed survey with good effects

    施工中採用了全球定位系統( gps )和全站儀等先進的儀器和技術,它們在及時完成控制測量和細部中發揮了重要作用,取得了好的效果。
  16. Control surveying using gps rtk technology of long distance oil transfer oil or gas pipe

    技術進行長距離輸油輸氣管道的控制測量
  17. According to topographical control survey characteristics in the small towns of mountainous area, the paper presents two methods of control measure, namely, detailed survey and radiation survey, and makes some discussions from the precision, so as to solve some practical operation problems and improve the progress and precision measured

    摘要根據山區小城鎮的地形控制測量特點,提出「邊碎部邊」和「輻射點法」兩種控制測量方法,並從精度方面作一些探討,從而解決一些實際操作問題,提高的進度和精度。
  18. Abstract : aimed at surveying method of three - dimensional traverse, this paper makes research on accuracy matching of three - dimensional traverse by electronic total station, and comes to the conclusion that rating - planimetric - traverse matches well with corresponding rating - vertical - traverse

    文摘:利用全站儀可以將平面控制測量和高程式融為一體三維控制測量.針對全站儀三維導線的作業方法,討論了它的精度匹配問題,得出等級平面導線與對應的等級高程導線相匹配的結論
  19. Abstract : construction control survey and construction moulding survey are the guarantee of that engineering building and the size of the details meet design. supervision survey ensures the construction survey conforming to the pracision requirement of engineering

    文摘:施工控制測量和施工放樣是各項工程建築物及細部尺寸按設計要求定位的保證.監理復是確保工程建築物施工精度的保證
  20. Hardware configurations of the automatic test system for t / r modules is achieved by reasonably selecting programmable measurement instruments according to the measurement requirements and then integrating them with the t / r module to be tested by a programmable switch matrix

    根據要求,合理選擇可程式控制測量儀器,利用可程式開關矩陣將各儀器與被件( t r組件)有機地結合起來,完成了t r組件自動試系統的硬體配置。
分享友人