提前期 的英文怎麼說

中文拼音 [qián]
提前期 英文
advanced one
  • : 提動詞(垂手拿著) carry (in one's hand with the arm down)
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  1. Clt cumulative lead time

    累計提前期
  2. Research on lead time model in supply chain distribution

    供應鏈配送中的提前期模型研究
  3. The safety stock exists to cover both excess material consumption within the replenishment lead time and any additional requirements that may occur due to delivery delays

    安全庫存的存在能夠覆蓋在一個補貨提前期之內的過度的物料消耗,同時也能覆蓋可能出現的由於交貨延遲導致的任何額外的需求。
  4. At the same time, this model supposes information on demand during lead time is imperfect and lead time can be controlled and reduced at an added cost

    同時,模型假設有關零售商提前期內需求的信息是不完全的,並且提前期可以由追加額外的趕工成本進行控制。
  5. Lead time level

    提前期水平
  6. Analysis and study are made on batch optimizing production, main production planning lay - out, important resource planning coordination method and calculation of safety in - advance period with mixed use of mrpii / jit

    採用mrp / jit混用思想,對生產批量的優化方法、主生產計劃編排原則、關鍵資源計劃協調方法、安全提前期的計算等進行了分析研究。
  7. From the viewpoint of system, such the basic theories of the modeling method as system dynamics, learning organization and system thinking are studied on the basis of the analysis of the status quo of management decision - making, as well as relevant model building blocks, modeling methods and modeling steps. taking advantage of modeling platform stella / ithink, some enterprise management decision - making modeling infrastructures are built based on anhui jianghuai automotive co., ltd., which include inventory controlling, manufacturing, pricing, shop controlling and etc. finally, based on the qualitative analysis of the strategy of mark down sale in auto industry the model of the pricing strategy in auto industry is developed, which is based on anhui jianghuai automotive co., ltd. the effects of the strategy of mark down sale are simulated and analyzed quantitatively

    論文在分析國內管理決策現狀的基礎上,從系統的概念出發,研究了系統動力學、學習型組織理論、系統思考等基本理論以及系統動力學方法的建模構件( block ) 、建模原理、方法與步驟;藉助建模平臺stella ithink ,以安徽江淮汽車股份有限公司為原型,設計構建了庫存控制、製造、價格和車間控制等企業管理模型功能子模塊( infrastructure ) ;在定性分析國內汽車行業降價銷售策略的基礎上,設計構建了以安徽江淮汽車股份有限公司為原型的國內汽車行業價格決策模型,該模型圍繞產品價格、交貨提前期、市場份額、利潤、生產能力等關鍵因素,對降價銷售策略帶來的市場運作、生產管理、銷售發貨及庫存控制等過程的變化情況進行了模擬模擬,並通過一定的數據結果定量地說明了降價銷售策略將給企業帶來的結果。
  8. The over - exaggerating time in advance is the basic reason of high storages of finished and inprocess products and high occupation of current capital

    過分誇大的提前期是造成庫存和在制品儲備高,流動資金佔用大的根本原因。
  9. The main problems are also discussed such as order arrangement, capacity, capacity requirement plan, dynamic capacity plan based on agreement synchronous linear produce and lead - time control

    討論了系統所需解決的幾個主要問題:訂單管理,生產能力和能力需求計劃,同步線形生產的能力需求計劃的演算法,提前期管理。
  10. The reorder point should cover the average material requirements expected during the replenishment lead time

    重采購點能夠覆蓋一般的物料需求,使其滿足在補貨提前期之內。
  11. Lead time offset days

    提前期偏置補償天數
  12. Lead time offset

    提前期偏置
  13. We build the expression of total expected annual cost when the demand is normal distribution, simultaneous order quantity, order point and lead time to minimize the total expected annual cost

    在市場需求服從正態分佈條件下建立年總成本表達式,並同時決策訂貨量、訂貨點和提前期使年總成本最小。
  14. We proved there ' s a global optimal policy which minimizes the expected total annual inventory cost when the lead time demand is normal distribution and develop effective iterative procedures for finding the optimal solution

    證明當提前期需求服從正態分佈時,存在唯一的全局最優訂貨量、訂貨點和提前期,使年總成本最小。
  15. And that the stock and manufacture policy also play an important role in deducing the bullwhip besides the accumulative lead time is concluded

    證明了除了累積提前期以外,長鞭效應還與信息共享時的庫存、生產控制方式有關。
  16. A study on safety stock management of component commonality based on lead time

    基於提前期的通用件安全庫存管理
  17. Research on the stock leading - time and batch cooperation models of supply chain

    供應鏈采購提前期與批量合作模型研究
  18. Customer deliver lead time

    客戶交貨提前期
  19. Customer deliver leadtime

    客戶交貨提前期
  20. Inventory model with controllable lead time and variable backorder rate

    基於可控提前期和可變押后訂單比例的庫存問題研究
分享友人