提取的瀝青 的英文怎麼說

中文拼音 [deqīng]
提取的瀝青 英文
extracted bitumen
  • : 提動詞(垂手拿著) carry (in one's hand with the arm down)
  • : Ⅰ動詞1 (拿到身邊) take; get; fetch 2 (得到; 招致) aim at; seek 3 (採取; 選取) adopt; assume...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ動 (液體滴落) drop; drip; trickle Ⅱ名詞(液體的點滴) drop; drip; trickle
  • : Ⅰ形容詞1 (藍色或綠色) blue or green 2 (黑色) black : 青布 black cloth; 青牛 black ox3 (年輕...
  • 提取 : 1. (取出) draw; pick up; collect 2. (提煉) extract; abstract; recover
  • 瀝青 : pitch; asphalt; bitumen; mineral resin; dacholeum; goudron; chian; pez; peucine; pitchblende
  1. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型顯得尤為重要,特別對于壩基有深厚覆蓋層堆石壩,心墻和壩基防滲墻應力和變形是壩體、壩基最敏感部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計方案選擇供了參考;在吸收和歸納了國內外堆石壩設計研究成果基礎上,對粘土心墻和壩基垂直防滲方案、混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡大壩防滲體與基礎混凝土防滲墻不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位影響進行了三維有限元靜力計算分析和研究。通過對不同方案計算分析和研究,比較全面了解了各方案壩體,尤其是防滲體應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體結合型式以及塑性區大小確定供了重要依據。
  2. Firstly, the paper researches on the assessment of the expressway asphalt pavement performance, practice measure data of ten typical sections are selected from survey expressway, establishes weighed geometric mean to calculate pqi, which includes sri parameter that could enhance model precision

    首先,對高速公路路面使用性能進行評價,從課題所調研高速公路中,選10個典型斷面實測數據,建立基於加權幾何平均值路面綜合評價模型pqi ,並在模型參數中增加抗滑性能指標sri ,高評價模型精度。
  3. Meanwhile questions on how to solve without auxiliary core masonry and construction technique of asphalt concrete core are raised after the auxiliary core ' s cancellation

    出了對消副墻后,如何解決沒有副墻砌體,混凝土主墻施工技術問題。
  4. So more studies on the asphalt material are carried out. the modification is the effective method to improve the properties of the asphalt. this method is applied widely and good results are received

    針對這一情況,國內外對材料進行了深入研究,目前,改性作為一種有效品質途徑,得到認可並廣泛應用,並得了較好使用效果。
分享友人