插筋 的英文怎麼說

中文拼音 [chājīn]
插筋 英文
dowel bar
  • : 動詞1. (把細長或薄的東西放進、擠入、刺進或穿入; 插上; 插進) stick in; insert 2. (中間加進去; 加進中間去) interpose; insert
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  1. Spigot and socket self - stressed

    式自應力鋼混凝土輸水管
  2. Spigot and socket self - stressed reinforced concrete pipe used for water delivery

    式自應力鋼混凝土輸水管
  3. Simplified result of earthquake effects indicate that earthquake resistant capacity are obviously scarce and need to be reinforced. secondly, combining with the timber one - dimensional structural characters, the dissertation bring forward the technology that gfrp stick and steel bar reinforce the timber members whose compression perpendicular to grain have excess load and discuss the craftwork how to do the reinforced members

    針對木材橫紋局壓的受力特點和加固目標,本文提出「插筋法」增強古建築木構件的橫紋局壓承載力的技術,研究增強機理和加固后的力學性能,探討製作工藝及在應縣木塔中的應用問題。
  4. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼,分底腹板和頂板分別綁扎並吊裝鋼骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  5. Beam side form shall be installed after all work inspected and accepted such as beam rebar work, cushion block laying, steel inserts installation, steel doweling and pocket molding bed, etc

    綁扎梁,墊保護層墊塊,安放埋件、插筋、預留孔胎模等,經檢查合格后扣梁側模。
  6. A man with a small head is like a pin without any, very apt to into things beyond his depth

    沒腦的傢伙好比一根沒有頭的針,很容易把腿進非他力所能及的事情里去。
  7. Application of inserted reinforcing bar cage after completion of bored pile with long helix in beijing subway construction

    長螺旋成孔壓灌混凝土成樁后籠施工工藝在北京地鐵施工中的應用
  8. Application of post inserted reinforcing steel bar piles in huazheng mansion foundation pit support

    籠法成樁在華正大廈基坑支護工程中的應用
  9. The constructional technics of post - inserted the steel reinforcement cage in bored pile and associated equipment

    長螺旋鉆機成孔壓灌砼樁后籠施工工藝及配套裝置的應用
  10. Steel bar by a clockwise direction as to gently implanted hole parallel to the hole, jack until the end of adhesive overflow

    按順時針方向把鋼平行於孔洞走向輕輕植入孔中,直至孔底,膠粘劑溢出
分享友人