撓曲變 的英文怎麼說

中文拼音 [náobiàn]
撓曲變 英文
bending deformation
  • : 動詞1. (輕輕地抓) scratch 2. (擾亂;阻止) hinder 3. (彎曲,比喻屈服)yield;flinch:不屈不撓indomitable; unyielding
  • : 曲名詞1 (一種韻文形式) qu a type of verse for singing which emerged in the southern song and ji...
  1. Zijingguan fault zone is characterized with cataclasite series of tectonic rocks and joints alongside the deformational zone, and sometimes with uniclinal flexure or folds. the intensity of deformation increases from the sides to the center of the fault in the section, which appears from joints to cataclastic rocks

    紫荊關斷裂帶兩主斷裂形帶以碎裂巖系列構造巖和節理帶組合為特徵,局部出現和褶皺,由兩盤至斷裂中心形強度增大,一般由節理帶過渡為碎裂巖帶。
  2. And results are : ( 1 ) analyze the force and distortion on pipeline under collapse and gulch in theory. on the base of beam deformation, analyze the bending moment and deformation of pipeline with frusta and without frusta. calculate a true problem, contrast the differences between pipeline with frusta and one without frusta, draw some conclusions

    得到的主要結果為: ( 1 )基於彈性地基理論和彈性梁的線理論,給出了管道在固定墩(相當跨越河溝情況)和無固定墩(相當坍塌和沖溝情況)的形微分方程,並分析了當量軸力為拉力或壓力時管道的形和受力情況。
  3. As an application of this fem preprocessing system, the simulation on the welding process of missile ’ s oil box was performed, in which the effects of the welding sequences of four web plates and welds on each web plate are primarily analyzed. the simulation results show that the deformations under varied welding sequences are almost the same. downward deflection deformation is obtained along the weld longitudinal direction in the structure as well as upward deflection deformation along the weld traverse direction

    對于某型號導彈油箱結構焊接過程的數值模擬計算,主要考察了每塊立板上各段焊縫焊接順序的調整、四塊立板之間不同的焊接順序以及焊接起始端的選擇對結構焊后形的影響規律,模擬結果表明:壁板在各種焊接順序下的整體形規律基本相似,即焊後壁板沿焊縫縱向發生了向下的撓曲變形,中部向下形量最大;沿焊縫橫向發生了向上的撓曲變形,壁板兩端部形量較大,且壁板前端形大於壁板後端。
  4. The meso - cenozoic evolution of bachu fault - uplift is closely related to its south and north subsiding foredeep. under the background of indian plate subducting under asia - europe plate, bachu forebulge was greatly affected by the development of southwest depression and awati depression. almost all of its structure reversed, and as a result of it, both of its south and north boundary migrated. according to its evolution history and its feature, the authors tentatively use both - side migration model to interpret the evolution of compound forebulge. since triassic, almost all the spheres above lithosphere synchronously became flexure. because transpressional stress field became increasingly strong, bachu forebulge continued uplifting and big faults formed. then, bachu uplift, as a whole, slipped upward along those big faults and showed migrating toward thrust zone in plane. in tectonic tranquility, the lithosphere bounded back and in consequence of it, bachu uplift slipped down and showed migration toward craton, at that moment negative inversion structures developed. while the forebulge migrated toward its south and north foredeep, it was very possible that locally extensional stress appeared in the forebulge

    在印度板塊向歐亞板塊俯沖的大背景下,巴楚前緣斷隆受西南坳陷和阿瓦提凹陷的影響,新生代時構造體制發生反轉,邊界向南北遷移。根據其發育過程特徵,作者用復合前緣隆起兩端遷移模式對復合前緣隆起獨特的構造發育史進行了解釋:即三疊紀以來巖石圈各圈層同步撓曲變形。隨著擠壓應力場的增大,巴楚隆起在基礎上不斷抬升,形成幾條大型斷裂帶。
  5. Depositional cycles on basin scale have been interpreted as the result of depositional response to tectonism such as episodic rifting, polyphasic compressive flexural subsidence and reversion, and differential subsidence of fault blocks ; while the formation of high frequency sequences was attributed to variation in lake level and sediment supply

    盆地規模的沉積旋迴多是盆地幕式裂陷、多幕擠壓沉降、多期構造反轉、斷塊差異沉降等構造作用的沉積回應;高頻層序單元的發育則主要與湖平面和沉積物供給量的化有關。
  6. Partially prestressed concrete structure has been widely used in the field of civil engineering. the deformation is very important for prestressed concrete members, for they are thinner than those of reinforced concret owe to the adoption of hign - intension material and developed technic of design and construction. at present, there are some formulae for deformation in the criterion of many countries. mostly there are 3 methods in use : double linearity method, method of valid inertia and curvature integral calculus method. this article will discuss the influence of material, spa, construction form, and adjust the formula for stiffness of gb50010 - 2002 to a new uniform formula for deformation

    在土木工程領域,部分預應力混凝土結構因其良好的跨越能力和經濟性而得到了廣泛的應用,並發揮了巨大的作用。由於採用了高強度材料並進一步改善了設計和施工技術,預應力混凝土構件一般比普通鋼筋混凝土構件更為細巧,因此,撓曲變形問題顯得尤為重要起來。目前,各國規范對于部分預應力混凝土構件的形計算均有相應的公式,形計算的關鍵是剛度的計算。
  7. Advanced technical ceramics. methods of testing monolithic ceramics. thermo - mechanical properties. determination of flexural creep deformation at elevated temperatures

    高技術陶瓷.整體陶瓷的試驗方法.熱機械特性.在升溫條件下測定
  8. Testing methods for flexural creep of carbon fibre reinforced plastics

    碳纖維增強塑料的試驗方法
  9. During my master " degree investigation, i mainly focused on the coarse - grain stratigraphy within mesozoic basins in chengde and pingquan districts, the eastern yanshan, and did systemic provenance analysis and paleo - current direction measurement and studied the relationship among basin evolution, volcanism and tectonism. then i summarized the mesozoic basin development and the coupling characters of basin and mountain. the evolution of basin and mountain in this area can be divided into several stages : the stage of compression uplift and flexural basin during the triassic through the early jurassic, the stage of structural compression - volcanism and foreland basin during the middle and late jurassic and the stage of rift basin in the cretaceous

    在野外典型路線調查的基礎上,對燕山地區東段承德、平泉地區的中生代盆地中發育的粗碎屑沉積層,進行了系統的物源分析與古流測定,並在此基礎上重點剖析了盆地的發育、火山活動、構造動三者之間的關系,總結了本區中生代盆地發育規律及盆山耦合特徵,並將盆山演化劃分為:三疊紀?早侏羅紀的構造擠壓隆升與盆地發育階段階段,中晚侏羅紀的構造擠壓?火山活動與類前陸盆地發育階段,早白堊世的拉張斷陷盆地發育階段。
  10. The flexoelectric effect will arise when an external uniform electric field is applied in the plane of slab and the director of liquid crystal will also generate a very small transformation

    沿面外加一勻強電場,將會產生電效應,使得液晶指向矢分佈發生了一個很小的化。
  11. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力化規律和樁身位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  12. On the basis of relative researches in the world, according to the study status of steel - concrete composite slab, which would be widely used in modern bridge, modified equivalent inflexibility of steel - concrete composite slab was deduced by use of conversion section principle in this paper ; based in this, this paper put forwards the theory of ultimate flexural capacity of steel - concrete composite slab in consideration of slip effect, and introduces the practical simplified method for calculating flexural deformation of steel - concrete composite slab in consideration of the effect of steel studs and welded wire, and conclude that the methods in this paper is veracious and reliable, comparing with the traditional calculating mode ; morever, this paper put forwards the calculating theory and program of the effect analysis of creep and shrinkage to steel - concrete composite slab, using conversion elastic modulus principle, and testifies that the theory is right and the program is reliable and practical

    本文在國內外研究成果的基礎上,針對壓型鋼板與混凝土組合板結構在現代橋梁建設中廣泛應用前景和研究現狀,利用換算截面法導出了壓型鋼板與混凝土組合板結構的修正等效慣性矩;在此基礎上,又推出了考慮壓型鋼板與混凝土之間的相對粘結滑移影響的壓型鋼板與混凝土組合板結構極限抗彎承載能力計算理論,並介紹了考慮栓釘、聯結件影響的壓型鋼板與混凝土組合板結構簡化實用撓曲變形計算公式,而且通過與傳統計算理論的分析比較,表明本文提出的計算理論公式的準確可靠性;此外,採用換算彈性模量比法著重提出了壓型鋼板與混凝土組合板結構的徐、收縮效應分析的計算理論和程序,並通過實例分析計算證明了理論的正確性、程序的可靠性和實用性。
  13. The paper presents a new comparative method. that is to make the different strengthened forms by externally bonded with different materials reach the same ultimate flexural capacity, and contrast with each load - deflection and moment - curvature curve, which are calculated by paper ' s program. mean

    本文引入新的對比方法,即不同材料的加固在最終均達到同樣的極限抗彎承載力時,比較其各自的彎矩一率和荷載一化情況,並自行編製程序進行計算。
  14. Plastics - determination of creep behaviour - part 2 : flexural creep by three - point loading

    塑料.蠕性能測定.第2部分:三點負荷下的
  15. We have proved that the surface energy induced by the flexoelectric effect has the same form but inverse sign at the up or down substrate. the expressions of the threshold voltage and the saturated voltage which have correlation with e1 + e3 ( the flexoelectric coefficients )

    給出了閾值電壓和飽和電壓的表達式,它們都與e _ 1 + e _ 3 (電系數)有關,即電效應將導致閾值電壓和飽和電壓的化。
  16. The calculation of flexural deformation of cold - formed steel - deck concrete floors

    混凝土組合樓板撓曲變形計算
  17. According to the transferring matrix method, the paper presents a method for calculating the deflection of a filament wound tapered tube at bending and the calculation result is proved by experiment results

    本文以傳遞矩陣法為基礎,計算纖維纏繞錐管在彎載荷作用下的撓曲變形,並以實驗結果驗證了計算結果。
  18. In this thesis, it is analyzed theoretically the steel bar layout pattern, the prestress loss, the concrete stress, and the discipline of the deformation and the fracture forming of structures of the partial prestress concrete frame beams, which is widely used in modern civil engineering

    本文從理論上分析了現代建築工程中廣為採用的部分預應力混凝土框架梁的布筋方式、預應力損失、混凝土應力、結構形和開裂規律;導出了具有一般意義的預應力錨固損失以及梁的長期撓曲變形計算公式。
  19. The relationship between the flexural stress field and the vertical and horizontal loading is also discussed in details respectively. the result shows that the flexural stress of the western china is about several hundred mpa

    結合中國大陸西部的地質特徵,討論了應力場在板塊垂向上的化規律,分析了垂向荷載和水平荷載對應力場的影響。
  20. Based on the lithosphere rheology, we use a 3d method in space domain to calculate the flexural stress field of the continental lithoshpere in western china. in this thesis, the vertical variation of the flexural stress field is presented

    本文在前人研究的基礎上,依據巖石圈流學理論,在空間域採用垂直和水平受力的多個剛度的三維有限差分方法來計算彈性板的,從而求得相應的應力場。
分享友人