  1. On the basis of the others, according to the constructional feature of the constitution of the composed soil nails, the computation mode of the he strut frame made of composed soil nails was set up to analyze the distortion of the he strut frame made of composed soil nails when it is stressed. with the engineering data, the strut frame made of composed soil nails is analyzed with the program ababqus, and the effects of the distortion characters, the property of the deposition of the ground, the mechanical property of the soil nails, the variation of the length and the separation of the soil nails, and the diametric of the mixing piles on the strut frame made of composed soil nails, and the distortion property of the strut frame made of composed soil nails under different ground conditions

    在總結前人的研究成果下,針對復合土釘墻構造的特點,建立了模擬復合土釘墻受力變形的計算模型,並結合工程實測資料,運用大型通用有限元程序ababqus對復合土釘墻進行了有限元分析,詳細討論了復合土釘結構開挖過程中的變形特性、地面沉降性狀、土釘受力性狀;土釘長度變化、土釘間距變化、攪拌徑變化對復合土釘結構的影響;復合土釘結構在不同地基條件下的變形特性。
  2. The paper also has a research on the influence of compound soil nailing behavior in the perspective of silt and hardpan of the effect of the width of soil - cement mixing piles. 3. with the analysis of various effecting factors on compound soil nailing, the paper holds a analysis of the mechanism ’ s essence of the compound soil nailing

    2 .深入分析了土體的彈性模量,水泥攪拌的彈性模量,水泥攪拌擋墻的寬度,土釘長度的變化以及土釘傾角的變化對復合型土釘墻變形性狀和土釘軸力的影響,以及水泥攪拌擋墻的寬度在淤泥土層以及砂土土層中對復合型土釘墻變形性狀的影響。
  3. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排兩種體系基礎上開發應用成功的一種新型實用性技術。其機理類似於未嵌入坑底的排多錨,只是由肋梁代替了開挖前施工的排從而提前工期並降低造價;同時繼承了土釘墻隨挖隨的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功應用。
  4. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿肋梁結構」的發展、應用和優缺點;第二章分析其機理、結構特點,並與土釘墻和無嵌入排多錨進行了結構受力對比分析;第三章介紹該結構的設計計算方法步驟,詳細介紹了結構各部分的設計方法;第四章介紹預應力錨桿肋梁系統最重要的兩個部分:帷幕和錨桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  5. In addition, in this paper, the calculate results of incremental calculation method and total calculation method are compared ; the infection of the pile stiffness 、 the elastic modulus of soil and pile 、 the excess load 、 the soil character to building enclosure are discussed, and some useful conclusions are found

    另外本文還比較了增量法與全量法計算結果的差異,討論了體剛度、土彈性模量、地面超載、土體性質等因素對結構的影響,得到了一些可供工程參考的結論。
  6. The pile - anchor retaining structure system is often used in chongqing area. for a long time, there is a conception about the transfer approach of soil pressure behind the pile - anchor retaining structure system that the pressure is applied on the holding sheet firstly, then transferred to the columns by the sheet, finally transferred to the form ground by the anchor

    擋結構體系是重慶地區經常採用邊坡形式之一,長期以來,人們認為擋結構體系的傳力途徑是:土壓力先作用於擋板上,通過擋板再傳到兩邊立柱,然後再通過錨桿把力傳遞給穩定地層。
  7. Based on nonlinear finite element theory, stress and deformation behaviors are analyzed after ground stabilization and foundation pit reinforcement with deep mixing method. by comparison of the conditions of treatment and non - treatment of two examples respectively, the results indicate that the match ratio scheme used for deep mixing method is more ideal when soft clay is stabilized in this area of fuzhou in the thesis. this scheme not only can fully utilize industrial waste material, but also can economize construction cost

    對于加固土的工程特性,本文以非線性有限元理論為基礎,模擬分析水泥攪拌加固地基和基坑加固的應力和變形情況;通過兩個例子分別在有處理和無處理情況下的對比,利用固化劑最佳摻入比來設計地基處理方案,並運用非線性有限元方法計算出土體內大小主應力的分佈情況以及變形情況,結果表明本文所得出的配合比方案用於深層攪拌法來對福州地區軟粘土進行地基加固時還是比較理想的,這樣不僅充分利用工業廢料,還可節約工程造價。
  8. Abstract : this paper introduces four typical light - retaining structures. they are frame girder with prestressed anchor ropes, antislide pile with preslressed anchor ropes, anchored nelwork with jetting concrete and retaining wall with root piles. these structures are successfully applied to the national highway no. 107 in guangdong province

    文摘:以國道107線清連一級公路上四個典型的邊坡病害治理工程為例,介紹預應力錨索格構梁、預應力錨索抗滑、錨噴掛網、樹根擋土墻等輕型擋結構在公路邊坡病害治理工程中的應用
  9. Bored pile - jet grouting supporting structure

    鉆孔灌注與噴射注漿組合結構
  10. The reasons and treatment measure for model swelling in pile concrete casting of slope suppoting

    高邊坡抗滑混凝土澆注中漲模的原因及防治措施
  11. The pouring anchor and shot concrete as used from the middle of 1950 " s, while the technology of anchorage, which was used as foundation support was popular in europe in i960 " s, and this method was used to strengthen the tunnels " ceilings and support mines from 1970 " s in china

    在我國70年代前已開使在加固隧洞頂、礦山等工程中開始使用, 80年代開始應用於深基坑工程,但也主要是與鋼板、灌注、地下連續墻等結合使用,做為系統的一種錨固手段取得了良好的效果。
  12. The top beam can reform the force - bearing mechanism of the retaining piles because the cantilever piles can be fixed by adding a restriction on the top of the piles and the displacement of the piles can be reduced too. as the same time, top beam can harmonize the displacement and force of the piles and avoid the phenomenon of chain failure as one of the piles is destroyed. if the top beam are closed it can work well because the support on the two ends

    頂圈樑對支護樁的作用主要體現在:改善支護樁的力學性狀,變懸臂為頂端約束的超靜定狀態;對頂位移起限製作用,減小基坑工程對周邊環境的不良影響;協調各之間的受力和位移,避免局部受力過大引起各之間的連鎖破壞現象。
  13. Study on the mechanism of the top beam that used in retaining and protecting piles of deep foundations is the uppermost section of this master degree thesis. the classical structure mechanics method and the finite elements analysis software are used to calculate and analyse the internal force of the piles - top beam retaining system. based on the research of the mechanism of the top beam, the optimal design of piles in row is discussed

    本文針對深基坑排支護樁頂圈樑設計計算中存在的問題,以項圈樑的作用機理為主要研究內容,分別採用傳統的結構力學矩陣計算方法和有限元分析軟體對排?項圈樑體系內力進行計算和分析,對項圈樑作用的力學機理進行了深入的研究。
  14. C ) according the difference of geological condition and construction condition, this thesis select the best support among cantilever supporting pile, one - anchored supporting pile and soil nails support

    C )根據不同的工程地質和施工條件,優選懸臂支護樁、單層錨桿支護樁、土釘系列中的一種方案。
  15. It is on condition of the retaining and protecting piles imitated by nylon sticks, the top ring beam imitated by steel board, the foundation wadded by sandy soil, and the sectional size and extra load changed

    本文試驗是以尼龍棒模擬支護樁,以扁鋼模擬項圈樑,採用砂土填築地基,通過變換圈樑的截面尺寸及堆載進行了八組試驗。
  16. For the information construction, a improved back - propagation artifical neural network is used to predict the level displacement and lateral displacement of timbering stake. nonlinear regression prediction of deformation has been achieved

    為了做到信息化施工,以改進的bp人工神經網路為基礎,建立了支護樁水平位移和側向位移的預測模型,實現對基坑變形的非線性預測。
  17. The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors, which is a frequent type of retaining structure. it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures. the optimal design method on pile - anchor systems is presented

    是一種常見的基坑模式,本文以結構水平位移為重點,對結構剛度、撐剛度與預應力、支護樁入土深度等對頂水平位移的影響進行了分析,指出在體系中,錨桿撐剛度及預應力對基坑變形的影響最為明顯,並通過工程實例加以驗證。
  18. According to the feature of adamicearth, s engineering geology and calculation of engineering design, the chief problems about traditional calculation method in the earth pressure are studied refering to cantilever - type retaining pile in excavation engineering, and the calculation methods and specific advices are posed

    摘要根據紅粘土工程地質的特點及工程設計計算,針對基坑工程中懸臂支護樁採用傳統計算方法在土壓力計算方面所存在的主要問題進行分析研究,並提出了具體處理意見和計算方法。
  19. Considering the difference of geological condition and construction condition, the thesis select the best form to save the money and make the work in security. a ) the pile support : according cantilever supporting pile, one - anchored supporting pile, the thesis compile a series of program with the method of criterion

    本文針對黃土地區懸臂支護樁、單層錨桿支護樁、土釘等不同的方案,優選了方法和結構形式,考慮了不同的地質條件和施工條件情況下,採用相應較合理的方案以達到安全可靠和經濟的目的。
  20. Research results show that foundation pit slope soil structure destroy characteristic is subgrade shear strain destroy, namely, it is gradually destroy. lateral displacement of retaining and protecting piles has relations with embed depth, load grade and strength index parameter. soil displacement and timbering pile displacement are in harmony with deformation

    研究結果表明,基坑邊坡土體具有地基整體剪切變形破壞的特點,系漸進破壞的過程;支護樁側向變形是嵌固深度、荷載大小、土體強度參數變量的函數;土體的位移和支護樁的位移滿足變形協調條件。