收絞過程 的英文怎麼說

中文拼音 [shōujiǎoguòchéng]
收絞過程 英文
pursing process
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : Ⅰ動詞1 (把兩股以上條狀物扭在一起) twist 2 (握住條狀物的兩端同時向相反的方向轉動 使受到擠壓; 擰...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 過程 : process; procedure; transversion; plication; course
  1. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼線式(鋼棒連接式)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通實橋計算,說明了落梁防止系統設計的方法。
分享友人