整數規劃法 的英文怎麼說
中文拼音 [zhěngshǔguīhuàfǎ]
整數規劃法
英文
integer programming- 整 : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
- 數 : 數副詞(屢次) frequently; repeatedly
- 規 : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
- 劃 : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
- 法 : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
- 整數 : 1. (不含分數或小數的數) integer; whole number; integral number2. (沒有零頭的數目) round number; round figure
-
Some research work for integer programming has been done by now, but less for integer nonlinear programming, and little has been done to it by initiatory method
對純整數非線性規劃問題目前已有一些工作,對非線性混合整數規劃問題的工作較少,用啟發式演算法解決混合整數非線性規劃問題的工作也不多見。Ant colony optimization algorithm for nonlinear integer programming
非線性整數規劃的蟻群演算法The topics covered in this course include : unconstrained optimization methods, constrained optimization methods, convex analysis, lagrangian relaxation, nondifferentiable optimization, and applications in integer programming
這門課程的主題包括:無限制最適化方法,限制最適化方法,凸分析,拉格朗日鬆弛法,不可微分函數最適化,以及在整數規劃上的應用。During the research on the planning of 10kv distribution network, founds the 0 - 1 integer - planning model, and makes use of the method of cryptic enumeration for solution
在農村電網10kv配電線路子系統規劃研究中,建立了10kv配電線路0 - 1整數規劃的數學模型,並採用隱枚舉法成功求得最優解。Using method of oil - flow visualization techniques and measuring pressure distribution along airfoil chordwise and spanwise studies have been down for sidewall boundary - layer displacement effect in two - dimensional wind tunnel. three different chord models were tested in two different wind tunnel. in order to clarify the sidewall effects and study method of sidewall suction theory and sidewall interference correction method to remove effects of sidewall on model. the results of oil - flow test show that selection rational suction wary can obtain better testing results. by investigations on effects of the sidewall boundary layer suction and application of a sidewall interference correction method
為了很好地解決多機場航班隊列的擁塞問題,在將進場容量、離場容量與機場容量作為統一整體的情況下,充分考慮了機場間的網路效應,詳細研究了多機場航班隊列的優化問題,建立了多機場開放式非實時流量管理的數學模型,通過選取適當的決策變量,使其為線性0 - 1整數規劃模型,實現了中心流量集中管理.與其它演算法不同,本文提出的啟發式隱枚舉演算法能很好地解決此類問題,對某機場網路系統的模擬結果證明了所建模型、優化演算法及相應軟體的有效性和可靠性The lip is suitable for the case that the uncontrollable subnet is cascade petri net and all cascade subnets are either acyclic petri nets or state graphs, and control laws can be calculated using some standardized mathematical tools
線性整數規劃法適用於不可控子網是序狀petri網, _且.各序狀子網要麼是無環網,要麼是狀態圖的場合,該方法的優點在於在數學上有一標準的求解工具。A method of penalty function for solving nonlinear mixed integer programming
非線性混合整數規劃的罰函數解法A method of non - linear penalty function for solving integer programming and mixed integer programming
一種求解整數規劃與混合整數規劃非線性罰函數方法Integer programming of circular chromatic number
計算圓色數的混合整數規劃方法Neighborhood integer point search method to solve integer programming
鄰域整點搜索法求解整數規劃Based on the modified house of quality, the chance - constrained programming model is developed to determine the optimal striving targets by stochastic simulation and genetic algorithm, and the 0 - 1 integer programming model is derived for the decision - making of reengineering objectives
基於改進的質量屋建立了機會約束規劃模型,通過隨機類比和遺傳演算法確定最佳奮斗目標;建立了0 - 1整數規劃模型,用於經營過程重構目標的決策。Secondly, in the first phase, this paper solves the inventory supplement sub - problem through integer programming model, using the reduction of vehicle routes as the breakthrough to this problem, divides a whole distribution region into many customer subsets by radius - circle partitioning method, determines the optimal number of vehicle of service distribution region, applies two practice - oriented conclusions to reduce the number of routes on the basis of customer grouping, thus decreases considerably the variable scale of integer programming, and solves the problem through professional software to fix inventory supplement plan in plan period
其次,在第一階段使用整數規劃數學模型來規劃庫存補充計劃子問題,以減少車輛巡迴路線數目為求解該整數規劃的突破口,提出與固定劃分策略( fpp )相似的客戶分組思想,通過徑?環切割法把整個配送區域劃分成多個客戶子集,實現客戶分組並確定服務整個配送區域的最佳車輛數目。在客戶分組的基礎上建立了精簡路線的整數模型,然後通過運用兩條基於實際經驗的判斷來進一步減少巡迴路線數目,進而極大地減少了整數規劃的變量規模,並利用專業的求解軟體來求解該整數規劃問題,從而確定計劃期的庫存補充計劃。The first one of the two chapters deals with the objective of logistics centers location, the principle of location should be followed, and the processing procedure of datum. and the second introduces three material mathematical models and uses one of the models solves a practical issue. by the help of the above - mentioned contents, the author researches the effect of logistics centers in the logistics industry in depth
在這兩部分內容當中,前者對於物流中心選址前目標的確定,選址時應當遵循的基本原則和對選址時收集的資料處理等內容進行了詳述;後者則分別對重心法、逐次逼近法中的鮑姆爾?沃爾大法和混合整數規劃法三種數學選址的方法進行了介紹。Methods such as branch and bound algorithm, mixed integer programming, transportation model and separable linear programming method have been used in recently years. others are heuristic methods like genetic algorithm
近年來求解選址模型用得較多的數學優化方法有分支定界法、混合整數規劃法、運輸模型法、可分離線性規劃法。It improves on preventing the switching control process from oscillation and refusing compensation. the other is optimal switching control of the multi - tap capacitors formulated by nonlinear hybrid integer programming model
為了實現全局優化控制,本文將一個非線性混合整數規劃優化控制模型逐次線性化成增量形式后求解,即逐次線性規劃法。The paper discussed a method combining integer programming based on similarity coefficient with quadratic programming considering ratio of capacity to loading in workshop to obtain parts families and machines groups in two steps
摘要採用了基於相似系數的整數規劃和考慮車間資源負荷分配比率的二次規劃相結合的方法,分兩步得到了零件族和設備組。In order to adapt the maintenance activities well, this paper makes some ameliorations, as follows : ( 1 ) it is considered not so pertinent in this paper to take road user cost into account of total cost, and an advice of using pavement serviceability performance for benefit is given. ( 2 ) when evaluating the average of the road network serviceability, this paper put forward to using weighed geometric mean to calculate pqi. ( 3 ) bringing in a new idea of checking the reasonability of classifying pavement state and typical measure by transfer probability
為盡可能使其反映實際的養護規律,本文在前人研究的基礎上,提出以下改進: ( 1 )在建立費用模型時,認為在我國現階段,考慮用戶費用有不妥之處,提出以路面使用性能作為用戶費用的映象,以路面使用性能作為效益的評價指標; ( 2 )在評價路網平均服務水平時,提出用加權幾何平均值來計算路面使用性能綜合評價指標pqi ; ( 3 )提出了利用轉移概率檢查狀態的劃分和典型措施的合理性的新思想; ( 4 )在求解markov決策模型時,通常使用的方法是線性規劃法,本文闡述了另外兩種求解的方法:策略迭代法和整數規劃法。Evaluation of enterprise ' s credit risk based on mixed integer programming approach
基於混合整數規劃法的企業信用風險評估研究Then, the four procedures of controller synthesis, namely, the constraint transformation method ( ctm ), the eigen marking method ( emm ), the linear integer program method ( lip ) and the extended linear integer program method ( elip ) are discussed one by one
監控理論部分:首先討論了禁止狀態問題的最大允許控制器存在的充分必要條件;接著研究了四種具體的控制器綜合方法,即約束變換法、特徵標識法、線性整數規劃法和擴展線性整數規劃法。The elip is suitable for the case that the uncontrollable subnet is cascade petri net and some cascade subnets are neither acyclic petri nets nor state graphs, and the main character is that the nonlinear integer program problem is converted into the problem that can be solved by using some standardized mathematical tools
當不可控子網是序狀petri網,且無法用整數規劃法綜合控制器時,可使用擴展線性整數規劃法,該方法的優點在於把非線性整數規劃轉化為可用標準數學工具求解的問題。分享友人