整體拱 的英文怎麼說

中文拼音 [zhěnggǒng]
整體拱 英文
solid-barrel arch
  • : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
  • : 體構詞成分。
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • 整體 : ensemble; whole; entirety
  1. When the rock mass of dam abutment is enclosed by faults, joint fissures and bedding planes, it is necessary to carry out holistic anti - slide stability analysis in order to make the abutment withstand potential slide

    摘要當? ?肩巖為斷層、節理裂隙、層面等結構面所圍成,有可能產生滑移時,就應進行抗滑穩定分析。
  2. Construction of this palatine chapel, with its octagonal basilica and cupola, began c. 790800 under the emperor charlemagne

    這座宮廷教堂結構呈長方形,屋頂為形,修建於約公元790年到公元800間查理曼大帝執政時期。
  3. On the basis, the effect of different factors such as the sloping angle of arch ribs, the stiffness of bridge deck system, the effect of non - orientedly conservative loadings of the hanger and tie bar etc is discussed

    此外,採用線彈性方法,就的吊桿的非保向力效應、橋面系的剛度、橫撐布置形式、肋側傾角等因素對該橋穩定性的影響展開探討與研究。
  4. The software ansys6. 0 is used to analysis the stability of the state after construction of tongwamen bridge, linear method is used in analyzing the finite element model of the bridge, the coeffient of stability of different state after construction is given. on the basis, the effect of different factors such as the arrangement of lateral brace, the sloping angle of arch ribs, the stiffness of bridge deck system, the effect of non - orientedly conservative loadings of the hanger and tie bar etc is discussed. the different coefficients of stability of changing these factors are given, so the factors that are vital to the lateral stability of x - type arches are found, and the rationality of the methods taken to enhance the lateral stability of tongwamen bridge is evaluated

    本文應用有限元分析商業軟ansys6 . 0 ,採用線彈性方法,通過對該橋的空間有限元模型進行穩定性分析,得出其成橋運營階段各種工況下的穩定安全系數。在此基礎上,本文還通過有限元模型分析,就的矢跨比、吊桿(立柱)的非保向力效應、橋面系的剛度、橫撐布置形式、肋側傾角等因素對該橋穩定性的影響展開探討與研究。文中給出了各因素變化情況下的穩定安全系數,指出了對鋼管混凝土提籃橫向穩定性有顯著影響的因素及其合理變化范圍,並對銅瓦門大橋提高橫向穩定性的措施的經濟合理性進行了分析。
  5. On the contents of two sides abovementined, this paper attempts to do some initial researches from three angles as follows : 1, the analyses of anti - seismic features on longitudinal direction of the aqueduct l ) the seismic longitudinal effects are small. the vibrant characters are decided from the structure integration and rigidness of piers and main arch - ring of the aqueduct, so the following measures should be taken in order to weaken and isolate seismic influence : properly broadening the section sizes and adopting the high class concrete, lowering the height and barycenter of building, setting hoop steel bars so as to increase the plasticity of the concrete which can absorb the seismic energy and prevent the damages due to stress centralization on the linkages and changing place

    本文試圖就上述的這兩大方面的內容,從以下三個角度進行了初步研究: 1 、縱槽向抗震性能分析1 )湯峪河吊桿支承結構的縱槽向地震效應較小;吊桿式架結構動力特性取決于槽墩和主圈的剛度,以及結構的性,故適當加大構件截面尺寸或提高砼標號,盡量降低結構的建築高度和重心,在構件連接和變截面處增設梗脅,按照約束混凝土的要求來加強箍筋的配置,增加砼的延性,以克服地震時構件連接和變截面處的應力集中造成的坡壞,並吸收大量的地震能量,從而起到隔震,減震的效果。
  6. Tensile stress field would appear in the proximity of arched vault after excavation, slacking of surrounding rock and subsequent dropping of blocks of rock from such area would possibly occur at any time in the context of extra - shallow depth. so i - steel arched support must be erected to provide against possible block dropping and be integrated into a ring with that of pilot tunnels on both sides

    頂在核心土開挖后,在一定范圍內出現拉應力區,在超淺埋情況下極容易掉塊和發生圍巖松馳,因此核心土必須邊開挖邊架設工字鋼架,使之與左右導洞頂工字鋼形成
  7. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩區巖的形成和演化特徵的基礎上,詳細研究了肩槽高邊坡巖的結構特徵及岸坡巖淺表生改造特徵,建立了岸坡巖淺表生改造與岸坡演化模式,分析研究了巖的物理力學性質,採用修正的csmr法對肩槽高邊坡的巖質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡穩定性進行了系統分析、計算與評價;應用塊理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊的規模、出露范圍,從而對肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  8. Then, a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge. in addition, the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib. futhermore, the stabilization of arch rib in construction and service stage are analyzed detailedly

    本文結合該大橋的施工實踐,對無風撐鋼管混凝土系桿橋的主要工藝施工流程進行了全面論述和總結,並重點對單片鋼管肋兩點吊裝的結構受力進行了靜力計算及對肋在施工和運營階段的穩定進行了分析。
  9. Finally, niutoushan double - curvature arch dam was modeled and 3 - d fem simulation analysis was performed, so as to find out the integral safety factor and the stress and displacement patterns of dam and its foundation under different load combination

    最後,對牛頭山水電站雙曲壩進行了有限元建模和三維非線性有限元模擬分析,計算分析了各種情況下壩和基巖的應力位移規律,對大壩的安全度進行了綜合評判。
  10. The contents include : based on the previous research and the data of experimentations, the author researches and develops a kind of satisfactory semi - empirical formula of nonlinear temperature distribution, and calculates the temperature stress of rigid - framed arch bridge by the fem. the temperature effects of bridge structure by annual and sunlight temperature difference are discussed, it indicates that the temperature effect of annual temperature difference is small but the temperature effect of sunlight temperature difference is great and the temperature stress along beam depth resulted from sunlight temperature difference is nonlinear. with the comparison between the temperature effects of different position of bridge, the results show that where the section of bridge is small, the temperature stress of it is large

    本文主要包括以下內容:從理論上研究並結合實測資料發展了一種比較理想的半經驗溫度場非線性分佈公式,並將有限元方法應用於剛架橋結構溫度應力的計算中,對橋梁結構進行溫度應力分析;討論了年溫差和日照溫差引起的橋梁結構的溫度效應,表明年溫差引起的溫度效應較小,而日照溫差引起的溫度應力較大且沿梁高呈非線性分佈;分析比較了橋梁結構各個部位的溫度效應的大小,可知截面越小溫度拉應力越大,受力越不利;並對箱梁結構由於構造不同引起的縱向與橫向的溫度效應大小進行了探討,發現在頂板下緣也會出現相當大的溫度拉應力,並且梗腋的存在反而增加了頂板底部的溫度拉應力;還對幾種相近的剛構式橋型的溫度效應進行了分析對比,總結了這些橋型針對溫度效應的優劣,並提出相應的針對性措施。
  11. Moreover, based on routine research method on abutment stability, non - linear finite element shear strengthes reducing by step iteration method is put forward in this paper, which is also applied in the analysis of abutment stability of tengzigou arch dam successfully

    在此基礎上,介紹了非線性有限元強度折減迭代解法,探討了復雜地基上穩定安全度的評價方法,並應用於藤子溝壩穩定安全度評價。
  12. In general, both of them are used to verify the results. using geomechanical model test method, the overloading process and wreck character of high arch dam was emulated completely for tengzigou arch dam. it is emphasized for stabilization safety evaluation various major loading function of high arch dam must be accounted and arch dam ' s whole stability is the most important

    本文用地質力學模型試驗方法分析了藤子溝壩的超載過程和破壞特徵,並強調無論是超載試驗還是超載計算分析,在評價壩安全度時都應綜合考慮各種影響壩受力的主要荷載因素,以工作能力作為評價依據。
  13. Some primary researches are given in this paper, combined with the project - stability evaluation of concrete high arch dam of tengzigou, which is cooperated between hydraulic structure center of hohai university and dongbei hydroelectric investigation & design ltd. considering actual research work and specification, either concrete strength limit analysis of dam or shear failure of seams in rock abutments are taken singly into account for safety evaluation of high arch dam

    本文就這個問題,結合河海大學水工結構所和水利部東北勘測設計研究有限責任公司的合作項目?藤子溝水電站雙曲穩定性分析,在這方面做了一些初步研究。現行規范將壩混凝土強度校核和壩肩穩定安全度評價分開進行,沒有考慮兩者的關聯性,然而這兩類破壞常常是相互聯系,伴隨發生的。
  14. Abstract : this paper introduces the global stiffness, strength and stability of bracing structure with long span, pointing out that the control of bracing structure ' s deflection and elastic module can make the arch ring fit the line of pressure and arch axis and can guarantee the stability of bridge structure

    文摘:本文介紹了大跨度支撐結構的剛度、強度和穩定性,控制支撐的撓度和彈性變量可使圈符合設計壓力線與軸線,保證橋梁結構的穩定性。
  15. In this thesis, some work has been done : fisrtly, based on the thorough investigation of the mechanism project, combining concept diagram, the literal description and the formula analysis together for programing motion of the robot ; secondly, according to soil mechanics principle and pressuremeter theories, the model which reflect the interaction force between robot and soil are founded ; thirdly, proceed the analysis and solution ; using virtual prototyping software - adams to optimize the mechanism model and analyze the mechanics ; furthermore compared the analysis calculation result of the above both side, we verify the possibility that the robot dig hole and move in soil ; finally, construction model is consummated based on the optimized result, the mechanism motion and the simulation animation of whole harmonious motion is fulfilled by three dimension simulation software - 3dmax

    論文的主要工作有:首先,在對機構方案進行了深入研究的基礎上,以概念圖標表示、文字描述和公式分析相結合的研究方法對機器人進行了運動規劃;其次,根據土力學原理和旁壓理論建立了機器人在土質環境下的受力模型並進行了分析求解;然後,藉助于虛擬樣機軟adams對機構模型進行優化和力學分析;除此之外,通過對上述兩方面分析計算結果的比較,驗證了該機器人在土質環境下洞和蠕動爬行的可行性;最後,在優化結果基礎上進一步完善了結構模型,通過三維模擬軟3dmax實現了機構運動和協調運動動畫的模擬。
  16. Based on field test and theoretical analysis, the mechanism of instability of slurry - supported excavations was investigated from angles of soil arching effect, time - dependent effect, overall stability, and local stability

    同時,根據現場試驗和理論研究成果,從土效應、時間效應、穩定性和局部穩定性等方面分析了泥漿護壁開挖的失穩機理。
  17. During the construction of the concrete lining for the diversion tunnel of xiaowan hydropower station, the concrete linings for the sides and the crown of the tunnel are simultaneously placed by the integral steel shuttering trolley with the greatly shortened construction progress

    摘要小灣水電站工程在導流洞混凝土襯砌施工中,邊頂混凝土採用式鋼模臺車一次襯砌成形,大幅提高了施工進度。
  18. Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible

    對藤子溝壩的數值計算和模型試驗分析表明: ( 1 )藤子溝水電站在正常蓄水位作用下,壩和兩岸壩肩是穩定的; ( 2 )藤子溝壩的安全度大概為4 5左右; ( 3 )東北院提出的對左岸泥巖層挖除處理並用混凝土置換的加固除險措施經研究表明該加固措施是有效、可行的。
  19. Rc - masonry combination arch bridge abandons the disadvantages of conventional masonry arch bridge ' s falsework type construction, which makes longer construction time, higher cost and against protecting environment. compared with double arch bridge, it has better arch ring ' s integer and smaller distortion in the stage of use

    Rc -石砌組合橋摒棄了傳統石砌橋採用有支架施工造成的工期長,造價高,不利於環境保護的缺點;相比于雙曲橋,主圈具有性好,使用階段變形小的優點。
  20. Research on anchorage structure of complete arch in mining roadway in coal seam

    全煤回採巷道整體拱形錨固結構模擬研究
分享友人