整體模型試驗 的英文怎麼說

中文拼音 [zhěngxíngshìyàn]
整體模型試驗 英文
overall model test
  • : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
  • : 體構詞成分。
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 整體 : ensemble; whole; entirety
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  • 試驗 : trial; experiment; test
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集理大量工程經的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的泄洪,結合白山已建的建築物及籌建的白山大泵進水口,選定水墊塘的總布置方案。
  3. In this paper, the author combines the theory analysis with the experiment research method, and discusses the seismic behaviours, 3d elaborate finite element analysis and simplified model analysis of a kind of multi - function tall building - " sub - shearwall supported by frame ", which is applied widely today. the main contents are as follows : in order to observe the failure process and the earthquake response of the complex structure, and to analysis the seismic behaviour of the structural system and structural members, a 1 / 20 cement mortor model of a complex tall - building which is about to be built was producted and the shaking table test of this model under 26 sorts of earthquake loads was made. using sap2000 finite element analysis program, a 3d analysis model was built in computer, and the elastic time - history analysis of the model was done

    本文採用理論分析和研究相結合的方法,研究了目前應用較多的綜合性大廈? ?框支分區剪力墻高層商住樓的抗震性能及空間精細分析和簡化分析方法,主要內容為以下幾方面:對一擬建的復雜高層建築結構,採用1 20比例的空間,進行了26種工況下的擬地震振動臺,觀察了結構的破壞過程和地震反應,分析了結構及構件的抗震性能;建立了結構的精細空間,利用sap2000n大有限元分析程序對結構進行了彈性時程分析;通過有限元分析與結果的對比,對結構的抗震性能和抗震能力做出綜合評價,認為該結構由於轉換層上部去掉部分樓板,既可滿足建築設計的通風、採光等要求,又可達到協調結構轉換層上、下樓層抗側剛度的效果,是一種較理想的有多道抗震防線的結構式。
  4. The main contents of testing the strength of subgrade abamurus using earthquake wave velocity are as follows : the influence of the lithology and strength of flag stones and the shape of block upon wave velocity, the influence of the strength of cement mortar upon earthquake wave velocity, the estimation standards of the strength and completion of abamurus. this paper puts forward an accurate no - destructive testing using the different reflect of elastic wave velocity for abamurus stones, the strength of mortar, the plumpness of mortar and the type of abamurus, on the basis of laboratory tests and field tests. it can be used to accurately distinguish the completion of abamurus

    地震波速法檢測路基擋墻強度,研究的主要內容有:片石巖性和強度及塊對波速的影響;水泥砂漿強度對墻波速的影響;擋墻強度和完性的評估標準。應用彈性波速度對擋土墻石材、砂漿強度、砂漿飽滿度及擋墻類的不同反映,在室內外和現場生產的基礎上,提出了一種正確的無損檢測法,可以正確判別漿砂片石擋墻墻身的完性。
  5. Coastal and estuarine engineering, layout and planning of harbours and navigation channels ; river training, siltation prediction and its measures ; mathematical model computation and physical model experiments

    海岸河口工程、港口航道總布局規劃、河道治、泥沙淤積的預測和對策、數學計算和物理研究。
  6. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南河段防洪治是一項以防洪為主的綜合性河岸治工程,在平面二維數值擬計算的基礎上再進行河工,比較分析各防洪治方案下潼南河段水流條件的變化,及其對上游防洪、河道、大橋、電站、航運、河勢的影響,提出合理可行的工程方案
  7. In boundary treatment, the model turns into generally adds coarseness boundary made of specially complex many coarseness body in the physical model experiment as the coarseness body highly and discharges the density to add the coarseness spot as the main characteristic whole, both to avoid the location within the body of this complex mathematical simulation problems, and could realize this model after to simulate the apron that adds the coarseness namely adds the coarseness section downriver speed of flow to the downriver current of water base speed of flow influence in to hang upward

    在邊界處理時,將物理中由特別復雜的多個加糙組成的加糙邊界概化成以糙高度為主要特徵的個加糙部位,既避開了對加糙內部進行極其復雜數學擬的這一難題,又能實現擬海漫加糙段下游水流流速在垂向上的分佈變化這一主要目的。在獲得基本的入流流速分佈、初始水位及加糙的絕對高度和加糙段長度的情況下,能迅速擬出加糙段下游各個斷面在垂向上的流速分佈情況。
  8. In general, both of them are used to verify the results. using geomechanical model test method, the overloading process and wreck character of high arch dam was emulated completely for tengzigou arch dam. it is emphasized for stabilization safety evaluation various major loading function of high arch dam must be accounted and arch dam ' s whole stability is the most important

    本文用地質力學方法分析了藤子溝拱壩的超載過程和破壞特徵,並強調無論是超載還是超載計算分析,在評價拱壩安全度時都應綜合考慮各種影響拱壩受力的主要荷載因素,以拱壩工作能力作為評價依據。
  9. Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible

    對藤子溝拱壩的數值計算和分析表明: ( 1 )藤子溝水電站在正常蓄水位作用下,壩和兩岸壩肩是穩定的; ( 2 )藤子溝拱壩的安全度大概為4 5左右; ( 3 )東北院提出的對左岸泥巖層挖除處理並用混凝土置換的加固除險措施經研究表明該加固措施是有效、可行的。
  10. Interaction of run - on slab and soil is simulated by “ m ” method, run - on slab is constrained by soil through the vertival and horizontal, advances computing model of new type semi - integral abutment bridge. ( 3 ) this paper takes hengyang dashuiting middle bridge for test supporting project, designs full scale model test which can reflect truly interaction of beam, run - on slab and the embankment behind the abutment of new type semi - integral abutment bridge

    通過「 」法來擬搭板與土之間的相互作用,用豎向彈簧和水平彈簧來實現土對搭板的約束作用,建立了新式無縫橋梁的計算; ( 3 )以衡陽大水町中橋為依託工程,設計了能真實反映新式無縫橋主梁、搭板以及臺后填土相互作用的足尺
  11. On the base of the whole model structure, it realized the dynamic display of the transient fluid parameters in the conduit according to data available

    構建的基礎上,根據數據和計算數據,實現了輸水系統中流瞬變物理量的動態的演示。
  12. The prediction of propeller - induced hull pressure fluctuation in non - uniform flow is studied by using theoretical calculation and model experiment systematically. an intact method and computer program for the prediction of unsteady cavitating propeller - induced hull pressure fluctuation in non - uniform flow is set up in this paper. the measurement of propeller induced hull pressure fluctuation in depressurized towing tank carried out in this paper is the first time inland

    本文從理論計算和兩個方面系統地研究了不均勻流場中螺旋槳空泡誘導的船表面脈動壓力的預報問題,建立了一套完的預報非定常空泡螺旋槳誘導的船表面脈動壓力的方法和程序,並在國內首次完成了在減壓拖曳水池中進行空泡螺旋槳誘導的船表面脈動壓力測
  13. As an inlet structure, the forbay is an important part of the pumping station. the pressurized forbay, close in top structure, is a kind of particular forbay in which water is pressurized. based on the integral hydraulic model test of shanghai changqiao waterwork ' s water - transport pumping station, some research on the hydraulic characteristics of the pressurized forbay has been done in the paper. the main content is listed as follows : l. the hydraulic characteristics of the pressurized forbay in different water supply combination and different pump unit combination without divertion measure, and the reason of the poor flow state. 2. the hydraulic characteristics of the pressurized forbay with diversion pier, and the reason why the flow state can be improved. 3. the experimental research on the critical air suction condition of the pressurized forbay

    本文基於上海長橋自來水廠改造工程送水泵站水力,對有壓前池的水力特性進行了研究,研究的主要內容如下: 1 、無導流措施的有壓前池在不同供水組合及不同機組開機組合條件下的水力特性,並分析了流態較差的原因; 2 、加設導流墩後有壓前池的水力特性,以及加設導流墩流態改善的原因; 3 、有壓前池進氣臨界條件的研究; 4 、水泵進氣以後水泵性能的討論。
  14. With seismic loading tests on multi - rib composite walls and integer building models, this paper researches comprehensively on practical design methods for the structure of multi - rib panel, and provides the theoretical foundation for engineering application of this structure system

    本文結合密肋復合墻板力學性能房屋,較全面分析研究了多層密肋壁板結構的實用設計方法,為該結構系的工程應用奠定了理論基礎。
  15. By the hydraulic model test the application feasibility of the roller bucket with low - ridge was demonstrated. comparing the hydraulic calculation data and operation rusultes, the article made some summarise. the principle of mixed flow for energy dissipation design has been well vertified through the study results

    本文主要通過對某電站水利樞紐下游消能防沖的水力計算和、斷面分析,證了低鼻坎戽流消能在此類工程中應用的可行性。
  16. The whole model test study for jingzhou changjiang river highway bridge

    荊州長江公路橋整體模型試驗研究
  17. 3. based on the topography and geologic character of niutoushan arch dam abutment and base, and the interlayer and internal faults, which control the stability of the project, we build the three - dimensional geomechanical model and carry out the upto failure test by overload method. 4

    結合牛頭山拱壩壩肩壩基的地形、地質特徵,以及對穩定起控製作用的層間、層內斷層的分佈狀況,建立了三維地質力學,運用超載法對進行了破壞
  18. Combined with the practical project of niutoushan hydropower station, this paper studies the stability of niutoushan arch dam by 3 - d geomechanical model test and nonlinear fem analyse, and gets some useful conclusions and advice. model test theory and finite element method is applied to the study of the arch dam. the main contents of this paper include : 1

    本文結合牛頭山水電站的具工程,應用理論和有限元技術,對牛頭山雙曲拱壩進行了物理和數學建分析,綜合研究了拱壩的穩定問題,得出了一些有益的結論和建議。
  19. In order to study actuality of cfst arch bridge, based on the investigative result of " total bridge model test of chunan nanpu bridge ", the nonlinear structural internal forces, nonlinear stability and seismic resistance of large span cfst arch bridge have been studied in this paper

    針對鋼管混凝土拱橋的研究現狀,並結合「淳安南浦大橋研究」課題的研究成果,對大跨度鋼管混凝土拱橋結構內力非線性分析、非線性穩定以及抗震等方面作了具的研究。
  20. A centrifuge testing program was undertaken to investigate the distributing of displacement on the embankments " cross sections and to observe the performance of these embankments at failure or the failure trend of these embankments. the responses of foundations were also analyzed. various slopes and various spacing of the reinforcements were considered in this testing program

    通過離心,對不同邊坡坡度、不同加筋密度的土工格柵加筋路堤及不加筋路堤橫截面上的位移分佈進行了對比分析,對各在不利工作狀況下地基的響應情況、路堤的變形情況、破壞情況及趨勢進行了觀察。
分享友人