數學綜合 的英文怎麼說

中文拼音 [shǔxuézōng]
數學綜合 英文
mathematical synthesis
  • : 數副詞(屢次) frequently; repeatedly
  • : Ⅰ動詞1 (學習) study; learn 2 (模仿) imitate; mimic Ⅱ名詞1 (學問) learning; knowledge 2 (學...
  • : 綜名詞[紡織] (織布機上使 經線交錯著上下分開以便梭子通過的裝置; 綜片) heddle; heald
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • 數學 : mathematics
  • 綜合 : 1 (歸在一起; 聯合成一個統一的整體) synthesize 2 (不同種類、不同性質的事物組合在一起) syntheti...
  1. 3. the mathematical model for heat and mass transfer in the adsorbent bed is established, the porous of adsorbent, the flow of adsorbate in adsorbent, the characteristic of non - equilibrium adsorption are combined in the model, and a more accurate model of fluid flow in porous media - ergun model is adopted

    考慮了吸附劑的多孔介質結構,吸附質氣體在吸附劑內的流動,吸附的非平衡特性等,並且在吸附質氣體流動模型的選擇上,採用了ergun多孔介質流動模型,比常規的模型更全面準確地描述了吸附床傳熱傳質的動態特性。
  2. Abstract : based on the present possessed experimental data of steels with their different major chemical composition, this article formularized the calculation of linear expansion coefficients of fine carbon steels and low alloy constitutional steels through a series of alternate analysis, generalized statistics, curve superimposition and mathematical modeling

    文摘:對優質碳素結構鋼和幾類低金結構鋼,在現有實驗據的基礎上,通過迭代分離、統計、圖象分析和,得出按鋼的主要化成分確定其線膨脹系的計算關系。
  3. Implementation of comprehensive evaluation by fuzzy mathematics

    模糊數學綜合評估法的演算法實現
  4. At the stage of comparison of drafts, according to the fact of water resources in laiwu city, and the case of the water replenished together with used in qiaodian reservoir, it analyses that the water level heightened is necessary and feasible. it sums up an easy, rational and facile means that can be generalized in water design units at grass roots, according to choosing a best scheme by fuzzy comprehensive judgement. in the course of designing engineering, it has obtained the results such as the seepage of dam bottom, verifying the safety of dams, and the design of reinforcement, so that it ensures the safety on the engineering, and achieves the aims of prospective

    在方案論證階段,根據萊蕪市水資源狀況及喬店水庫來水用水情況,分析了抬高興利水位的必要性和可行性,採用模糊數學綜合評判的方法,總結探討出一種簡單理,易於操作,在基層水利設計單位具有一定推廣價值的方案優選辦法;在工程設計中,主要對大壩壩基滲漏,大壩安全校核及加固設計進行了計算,並對大壩加固設計進行模糊優選,保證了工程安全,達到了預期的目的。
  5. After this, the paper analyses the integrative financial efficiency by means of fuzzy mathematics evaluation. the descending financial efficiency order of the three financing methods is : inside financing, creditor ' s rights financing, stock financing

    同時使用模糊數學綜合評價法對民營企業融資的效率進行分析,得出融資效率由大到小的順序為:內源融資效率,債權融資效率,股權融資效率。
  6. That is, by the calculation of the anti - thermal deformation quality factor and synthetic quality factor of some typical primary mirror materials, the primary mirror material is selected scientifically and rationally. by the finite element method and the conception of structure rigidity quality factor, researching the relation between the light - weighted cell shape, the mirror thickness and mirror structural rigidity quality. by the force - thermal coupling analysis of the primary mirror assembly, the relations between the thickness, height of the flexible support reed and primary mirror synthesis surface figure error ( p - v ) have been researched

    即,通過對常用主鏡材料的抗熱變形品質因品質因的定量分析,科地完成了主鏡的選材;應用有限元分析方法,藉助于結構剛性品質因的概念,研究了主鏡輕量化孔的形狀和主鏡厚度對鏡結構剛性品質的影響;通過對主鏡組件的力熱耦分析,研究了主鏡柔性支撐簧片厚度與高度對主鏡面形的影響。
  7. In order to test resistance parameters and general properties of the idler automatically and continuously, by using " the rotating inertia method " to construct mechanical drive control system, theory of realizing double parameters measurement of the idler was discussed, and by using pressure transducer parts to control the experiment pressure, method of examining the idler was also put forward

    摘要為實現對托輥阻力參性能的自動化、連續化的測試,論述了利用理論力中「轉動慣量法」構建機械傳動控制系統,實現托輥阻力雙參測量的原理,闡明了採用壓力傳感器部件控制試驗壓力,達到托輥產品在規定壓力下跑要求的檢測方法。
  8. This study choosed arc view gis by way of foundation platform and developed the function modules for region geophysics and geochemistry ( for example hydrological function and background analyst for region geochemistry and transformation for potency field and transformation of map projection and correlation analyst and grid data treating and inserter for kriging and trend and so on ) except using the basic functions of arc view gis ( e. g. neighbour analyst and spatial data treating and surface analyst and model constructor and so on )

    本論文選擇arcviewgis作為基礎平臺,除利用arcviewgis的基本功能(如鄰域分析、空間據處理、表面分析、模型構造器等)外,開發了適於區域地球物理地球化解釋的功能模塊,如水文功能、區域地球化背景分析、位場變換、地圖投影變換、相關場分析、柵格據處理、 kriging及trend插值器等。
  9. The result indicates that from the north to the south, from the east to the west, the seal ability of four caprocks is better and better, the good seal areas of caprock distributes in heiyupao sag and its south. based on the research of the seal mechanism of the faults, this paper researched the vertical seal of t1 and t2 fautlts in binbei region by means of the mudstone content in fault zone and the pressure of fault plane. the result indicates the good seal areas of t2 fault for gas and oil distribute in daqing - anda and their north of binbei region, the good seal areas of t | fault for gas and oil distribute in wuyuer and heiyupao sags of binbei region

    本文通過濱北地區青山口組和嫩一、二段蓋層宏觀發育和微觀封閉能力分析,利用模糊數學綜合評價方法對濱北地區青山口組和嫩一、二段泥巖蓋層的封蓋能力進行了評價,結果表明這四套蓋層封蓋能力從北向南,從東向西逐漸變好。好蓋層封蓋能力區主要分佈於黑魚泡凹陷及其以南地區。在斷層封閉機理研究的基礎上,利用斷層面壓力和斷面填充泥質含量研究了濱北地區t _ 2層和t _ 1層斷層封閉性,結果表明濱北地區t _ 2斷層好的封油氣區位於大慶?安達以北局部地區, t _ 1層斷層好的封油氣區位於烏裕爾、黑魚泡凹陷處。
  10. Thought on primary schools ' mathematics comprehensive practice

    對小數學綜合實踐活動的思考
  11. Talking about the cultivation of university students ' mathematical comprehensive ability

    淺談大數學綜合能力的培養
  12. The evaluation index system for middlemen ' s performance is made, and the evaluation of fuzzy indexes is solved by fuzzy theory and data envelopment analysis

    運用層次分析法建立了營銷渠道中間商績效評價體系,並用模糊數學綜合評價法和據包絡分析解決了模糊指標的評價問題。
  13. E maths, a maths, pure physics, pure chemistry, combined science chemistry, combined science physics secondary normal technical

    ,高,純物理,純化,純物理,物理
  14. Magnetorheological finishing ( mrf ) is a newly developed optical machining method, which can achieve fine - finished optical apparatus efficiently. combining with electro - magnetics, hydrodynamics and chemistry, mrf has been applied in optical machining. plane surface, sphere and asphere made of different optical materials can be machined

    它將電磁、流變、化作用於光加工中,可以實現對光器件的高效精密拋光,是獲得超光滑光表面的理想工藝之一,目前已經被應用於對平面、球面、非球面的超精密加工,可加工材料范圍涵蓋了光玻璃、微晶玻璃、光晶體等多材料。
  15. In part 4, with the help of delphy - method, the author makes comprehensive evaluation on the compatibility between the protection and utility of the 25 geological - sites by multi - index - point - method of fuzzy mathematics

    第四部分,藉助特爾菲法,對25處地質遺跡資源保護利用協調性進行多指標的模糊數學綜合評價,據評價結果對其進行保護利用協調性分類。
  16. Integrated evaluations on air pollution from utility boilers based on fuzzy mathematics

    電站鍋爐大氣污染模糊數學綜合評價方法
  17. From this point of view, a general analytic expression for the coefficient of local energy loss was presented based on the principle of hydrodynamics, together with experiments on particular flow characteristics and energy dissipation mechanism at right - angle junctions, and the expression was validated with the experimental data

    為此,根據水動力基本原理,在分析90匯流口獨特水流特性及能量耗散機理的基礎上,提出了局部能量損失系表達式,並應用試驗資料對該表達式進行了驗證。
  18. This is a crossing course which applicants systematically with system science, thought science and mathematics

    這是一門將系統科、思維科數學綜合運用的交叉科。
  19. The synthetic application of ferrography and vibration monitoring technique on engine conditions monitoring is discussed, a monitoring model is built using the fuzzy synthetic decision theory, and an application example is presented

    摘要論述了鐵譜分析技術和振動監測技術在發動機狀態監測上的應用,利用模糊數學綜合評判的方法建立了監測診斷模型,並給出了一個應用實例。
  20. In order to provide scientific base for making out control schemes and designing prevention projects of debris flow, risk evaluation and maximal hazardous dimension forecast of 21 debris flows in futai were carried out with a fuzzy mathematic comprehensive evaluation method and a maximal hazardous dimension forecast model

    為了為理制定泥石流防治方案和進行泥石流防治工程設計提供依據,文章採用模糊數學綜合評判法和泥石流最大危險范圍預測模型分別對富太地區的21條泥石流進行了危險性評價和最大危險范圍的預測。
分享友人