斜方底面 的英文怎麼說

中文拼音 [xiéfāngdemiàn]
斜方底面 英文
rhombic base
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Gpr is a newly developed hi - tech survey technique used to detect shallow ground electric differences. we applied gpr to more than 100 projects in zhujiang river delta and hongkong, and obtained good reputations. the application scope involves stratigraphics division, outining of filled stones in the muddly beach, geotechnical prospecting of old wall, karst detecting in the limestone terrain, caving detecting, landslide and slop surveing, the division of wea - thering zone, onion weathering zone, fracture zone and fau - lted zone in the granite area, detecting of buried objects cable, metal nonmetal pipe, channel, air raid she - lter etc. underground in the urban city, archaeology, tracing of orebody, coal measures strata division, testing of the dam and grouting site, quality checking of the surface and foundation of the highway

    的一種高新技術。我公司運用世界最先進的探地雷達設備在珠江三角洲地區和香港開展了百余項探地雷達檢測項目,獲得了良好的聲譽,並被作為深圳市建設局1998年度建設科技成果推廣項目。它主要應用於:山體土石檢測路基不同回填物界檢測填海回填物巖溶檢測樁基無損檢測地下管道探測地下隱蔽物探測考古坡滑體探測地質結構探測湖探測高速公路路及路基檢測。
  2. Yuli brand drive optical network lights and the colourful new torpedo lights product range, is use of new improved power spring - loaded device access by luminous objects bottom cathode metal with top of spring - loaded contacts, contacts larger, use more flexibility, and must change the old generation network light bending of " spring - loaded " installation use error - prone, lean, exposed the defects

    "魚利"牌勁光網標燈及彩光新魚雷燈系列產品採用全新改良的電源彈簧接觸裝置,由發光器部負極金屬片與彈簧頂部接觸,接觸更大使用更加靈活便.傾解決了老一代網標燈彎尾彈簧安裝使用時易偏差、傾、外露的毛病。
  3. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先板、后腹板、再頂板的施工順序和向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工法;壓漿、封端、橋防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工法,並可為以後類似施工作借鑒。
  4. Brush the teeth everyday with fluoride toothpaste in the morning and before going to bed at night. removable dentures should be taken out before teeth brushing. place the soft - bristled toothbrush against the gum margin and gently brush in a back - and - forth motion along the outer surfaces and inner surface

    早晚用含氟牙膏,徹清潔牙齒,如配戴牙托者,清潔牙齒前先將牙托取下,再選用細刷頭和刷毛軟硬中等的牙刷來清潔牙齒,將牙刷放在牙與牙肉之間,這樣就可以連牙頸的地都刷到。
  5. Testing methods of floor compressibilities for coal mining face under conditions of gently inclined seam

    緩傾煤層採煤工作板抗壓入特性測定
  6. In this connection, we acknowledge that the director of civil engineering will commence in the end of 2002 a review to formulate a long - term strategy for tackling these remaining substandard slopes, with a view to formulating the strategy by 2004

    在這,委員會察悉土木工程署署長將於2002年年展開檢討,以期在2004年制訂長遠策略,處理這些餘下的不合標準坡。
  7. A three - dimension baroclinic prognostic model on the o - coordinate is established based on pom to simulate the wintertime circulation and the eddies in the east china seas, considering the topography, inflow and outflow on the open boundary, yangtse runoff, heat flux and wind stress on the sea surface

    本文在pom模式基礎上,建立一個坐標系下的三維壓預報模式,考慮了海地形、外來流、長江徑流、海風應力、海熱通量等多因素的影響,模擬結果較好地體現了冬季東中國海環流及渦旋的特徵。
分享友人