斷層破碎帶 的英文怎麼說

中文拼音 [duàncéngsuìdài]
斷層破碎帶 英文
shattered fault zone
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : 動詞[書面語] (觸; 撞) strike; bump
  • 斷層 : fault; slip; slicle; fracture; dislocation
  • 破碎 : 1. (破成碎塊的; 零碎的) tattered; broken 2. (使破成碎塊) smash [break] sth. to pieces; crush
  1. The author suggests that the three lithosphere - scale faults, lancangjiang fault, jinshanjiang - ailaoshan fault and axis fault in the middle of the basin, are the main geological structures that control the formation of basin, magmatism and metallogenic congregate district. the anticline structure with an axis of triassic strata and the related fault system within the basin, and gonglang arch - shaped folding structure in the south of the basin are the geological structure controlling the formation of ore fields. junctions of two or more faults with different orientation, interlayer cataclastic structural zone and oxidation - reduction ( redox ) boundary were the favorable position for the formation of ore bodies

    認為瀾滄江裂、金沙江-哀牢山裂及盆地中軸裂這三條巖石圈裂是主要的控盆-控巖(巖漿巖)構造及礦集區尺度的控礦構造;盆地中以三疊系為軸的背斜構造及相關的裂系統、盆地西南緣公郎弧形構造等是礦田尺度的控礦構造;多組裂的交叉、及地柱中的氧化還原界面是形成礦體的有利部位。
  2. Ground tensile deformation and asymmetry sedimentation are caused by slow creepage of faultage fracture zone, which brings great damage effects to ground buildings

    斷層破碎帶的緩慢蠕動將引起地面的拉張變形或不均勻沉降,對地面建築物有巨大的壞作用。
  3. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  4. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  5. On the application of curtain reinforcement technology in the construction of tunnel crushed zone

    帷幕注漿施工技術在隧道斷層破碎帶的應用
  6. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地高精度地確定沉積地的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  7. With practical engineering examples, this paper describes the application of gpr to engineering investigation of such harmful geological structures as karst, faults and fractures

    摘要結合貴州福泉下翁溪水庫、芙蓉江沙阡電站、冗各電站3個工程實例,介紹探地雷達勘探在巖溶、斷層破碎帶等不良地質構造勘察方面的應用。
  8. The paper makes out comprehensive evaluation of under pressure mining of mining area through the below aspects : analysising water - resisting layer ' s occurrence geologic features, physical and mechanical property and stability of duancun - leigou bauxite deposit ; researching of confined aquifer ' s hydrogeology features, fault fracture zone and its transmissivity of cambrian - ordovician limestone ; combining calculation of thickness quantitative index of safe water - resisting layer and etc

    摘要通過對段村雷溝鋁土礦隔水賦存地質特點、物理力學性質及其穩定性分析和寒武奧陶系灰巖承壓含水水文地質特徵、斷層破碎帶及其導水性的研究,結合安全隔水厚度量化指標的計算等,對礦區壓開采做出綜合評價。
  9. Concerning the construction of the shallow cover and the special shallow cover in the tunnel under the special geology conditions, the principle of " to stabilize the slopes with protecting arch ; to strengthen the earth with the pipe - shield support grouting ; to dig a hole shallowly ; to blast slightly ; to use strong supporting structure. " has been adopted to enter the tunnel safely ; in terms of the broken belt, the effective actions such as the pipe - shield support grouting, strengthening the surrounding rock in advance with advanced bolt and steel grids, and so on, are taken to pass the poor conditioned part smoothly

    對于特殊地質中的淺理、特淺埋進洞的施工,堅持「護拱穩定邊仰坡,大管棚注漿加固土體,淺打眼、弱爆、強支護」的原則,做到安全進洞;對于斷層破碎帶,則採取了管棚注漿,超前錨桿預先加固圍巖並結合鋼格柵支撐等有力措施,順利通過了不良地段。
  10. Technology of grouting and blocking water in fault broken zone

    斷層破碎帶注漿堵水技術
  11. Groutting off technical in fractured zone

    斷層破碎帶注漿堵水技術
  12. Continuous mining at break band of large fault in deep inclined cowing coal face

    放工作面跨大斷層破碎帶連續開采
  13. Bolt shotcreting steel mesh combined support system applied to broken zone of fault

    錨噴網聯合支護在斷層破碎帶中的應用
  14. Fault fracture zones often form in active fault zones and appear as long extension with stable trending, they are jointly controlled by active faulting, underground water concentration and freezing expansion

    裂縫沿斷層破碎帶定向分佈,產狀穩定,成群產出,與活動、地下水運移、不均勻凍脹存在密切的關系,是構造變形與融凍變形聯合、內外動力耦合產生的復合成因地裂縫。
  15. According to several engineering examples, this paper has probed and contrasted quantitatively the effect of chemical grouting. based on longyang canyon and lijia canyon, the author has concluded that chemical grouting attained satisfactory effect on strengthening fault so long as choose suitable grout ratio. based on wanjiazhai engineering ^ the author has assayed the cause that the effect was n ' t reasonable, that has the order before grouting and quantity during grouting etc. therefore, some reasonable proposals have been tabled in relations to the grouting methods and quantity methods

    針對龍羊峽、李家峽兩個工程實例的對比研究得到結論,只要選擇合適的漿液配比,化學灌漿對斷層破碎帶的加固是可以取得令人滿意的效果的;針對萬家寨工程的研究,對其效果不理想的情況,分析了其出現的原因主要可能是由於其灌漿前處理進行的順序及施工質量等,進而對以後的灌漿方法、施工方法等做一些合理化建議。
  16. Engineering disaster of faultage fracture zone is a subject of extreme complication and momentously economic implications. how to construct projects and sustain its stability economically and effectively in such geological circumstance is always a problem fuzzing many experts in rock mechanics and engineering geology

    斷層破碎帶的工程災害是個極為復雜且具有重大經濟意義的課題,如何才能做到經濟有效地在這類地質環境中進行工程建設並維持其穩定性,一直是困擾廣大巖土力學和工程地質工作者的一個難題。
  17. The present paper has recounted the application of the combined sound wave velocity - lateral pressure test method as well as some examples of its fault shattered zones

    摘要介紹波速旁壓聯合測試方法及其在斷層破碎帶勘察中的應用實例。
  18. ( 4 ) the collapse often involves with the fault and the phyllite. fault ' s strength parameter is very low, and the phyllite is liable soften to the water

    斷層破碎帶巖體力學性能極差,千枚巖遇水易軟化,這些地段發生的塌方往往是支護不及時或支護不力造成的。
  19. This paper discusses the treatment technique for highway tunnel in fault rupture zone during construction with new austrian tunneling method

    摘要結合工程實例,探討山區公路隧道新奧法施工中地質斷層破碎帶的處理技術。
  20. Applying the technology of smooth blasting, the complete section of the surrounding rock and the half section of the broken and the surrounding rock have been excavated at the obverse step

    利用光面爆技術,類圍巖全面一次開挖,類圍巖和斷層破碎帶面正臺階開挖。
分享友人