斷層開挖 的英文怎麼說

中文拼音 [duàncéngkāi]
斷層開挖 英文
fault excavation
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • 斷層 : fault; slip; slicle; fracture; dislocation
  1. Based on the bedding features of weak intercalations in sandstone plates near the top of underground cavity, the probable failure scale of bedding sliding, the probable settlement, the folding places and the critical length of sandstone beams are computed seperately, then the stability of underground cavity is analysed

    針對地下工程頂部狀砂巖中存在順發育軟弱夾的情況,分別對后可能出現的間滑動破壞范圍、巖板的沉降、折和臨界長度進行計算,並分析其穩定性。
  2. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高和多建築物以及在其地下20米處了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高與多建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高或多建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多或高建築物狀態和地下用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的發利用以及在高建築物地下硐室時的工程設計和工程施工提供參考依據。
  3. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎,除趾板與其下游1 / 9底寬范圍以及壩腳除沖積至弱風化(局部微風化)基巖外,其餘部分均予以保留.破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  4. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩槽邊坡在施工至f5附近時,要使用混凝土栓塞、固結灌漿、錨索加固及排水等措施以防止巖體失穩。右岸拱肩槽邊坡過程中要採取系統錨固及排水防滲等措施,以防止個別潛在不穩定的邊坡失穩。
  5. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程樁的實驗室承載力監測方法與設備、如何使土方機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波析成像技術監測鋼砼樁內部質量的方法與程序,並得出了聲波析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、基坑空間和時間效應影響理論來分析逆作法施工過程中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的掘的方式和順序,指出憑主觀臆與經驗來施工是不可取的;在分析、經較逆作法與大順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  6. Successful application to many station jobsites of the fu - ba line of beijing metro program shows that using the cavern - pile method in loose soft stratum for excavating shallow buried large section tunnels is practicable. therefore it has broad prospect for application

    在北京地鐵「復一八線」多個車站工程中的成功應用,充分證明採用淺埋暗洞樁法在鬆散軟弱地中進行淺埋大面洞室的是可行的,具有良好的發展前景和推廣價值。
  7. Because of the uncertainty of the geological factor, the complexity of high slope project and the particularity of anchor cable project, after the slope is excavated, according to slope ' s stratum rock, weather degree, broken degree, split surface, slope body structure and moisture state, etc, check, analyse and judge reality synthetically, protect and strengthen and design dynamically the high slope, guarantee the stability of slope body and security structure

    摘要由於地質因素的不確定性,高邊坡工程復雜性和錨固工程的特殊性,待邊坡揭示后,根據邊坡的實際地巖性,風化程度、破碎程度、構造裂面、坡體結構和含水狀態等因素,綜合校核和分析判是否實際,對高邊坡防護加固進行動態設計,確保坡體穩定結構安全。
  8. Applying the technology of smooth blasting, the complete section of the surrounding rock and the half section of the broken and the surrounding rock have been excavated at the obverse step

    利用光面爆破技術,類圍巖全面一次,類圍巖和破碎帶半面正臺階
分享友人