方石築墻 的英文怎麼說
中文拼音 [fāngdàn]
方石築墻
英文
opus quadratum-
And in the rear of one of the most imposing mansions in this rich neighborhood, where the various houses vie with each other for elegance of design and magnificence of construction, extended a large garden, where the wide - spreading chestnut - trees raised their heads high above the walls in a solid rampart, and with the coming of every spring scattered a shower of delicate pink and white blossoms into the large stone vases that stood upon the two square pilasters of a curiously wrought iron gate, that dated from the time of louis xii
聖奧諾路是有錢人的住宅區,各區各樣的巨廈府邸都以其設計高雅和建築華麗而相互爭輝,靠近這條路的中段,在一座最富麗堂皇的大廈的後面,有一座很大的花園,園子里到處是栗子樹,樹冠昂然俯視著那象城堡似的又高又結實的圍墻。每年春天,粉紅的和雪白的栗花紛紛飄落,於是,在那路易十四時代築成的鐵門兩旁方頂上的大石花盆裡,就堆滿了這些嬌柔的花瓣。At present, company is dominant in various types of floor tiles, high - class interior wall tiles, exterior wall tiles, whole body tiles, split tiles, granite and marble products etc. our excellent ceramics with the features of elegant style and varieties of design are greatly favored by numerous consumers who need building materials
永勝進出口貿易有限公司是以建築陶瓷、石材的進出口為主。目前,公司主要出口各式地板磚、高檔內墻磚、外墻磚、通體磚、劈開磚以及各式大理石、花崗巖等。品種繁多、種類齊全,全方位的滿足客戶對于建築裝飾材料的需求。According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not
地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。By virtue of the design features of the mania dam, this paper studies the dynamic characteristics of the dam materials. by comparison with other similar projects, it presents a curve for dynamic characteristics of clay core materials and rockfill materials, makes analysis on the dam ' s plane dynamic response by finite element method, calculates the dam ' s seismic acceleration, the dynamic shear stress of the rockfill, and the dynamic stress of the cutoff wall in the overburden layer
本文針對滿拉土心墻堆石壩的設計特點,進行了築壩材料動力特性試驗研究,通過與相關工程對比給出了心墻料和堆石料的動力特性曲線,採用有限元方法進行了大壩平面動力反應分析,計算了大壩的地震加速度、堆石體動剪應力及覆蓋層防滲墻的動應力。With the project performance this article introduces some - works on pac under the following aspects : - - - advantages of pcrd construction in the cold district, more durability, reliability and crack resistance of the pac core than concrete facing slab ; - - - mix design, criteria of material selection, relationship between aggregate segregation and mix proportion ; - - - test and study on deformation and strength of the pac
本文結合實際工程進行了如下幾方面的工作: 1 )分析了澆築式瀝青混凝土心墻堆石壩在寒冷地區施工的優勢,其防滲結構的耐久性、可靠性、抗裂性等方面性能均優于混凝土面板。 2 )確定澆築式瀝青混凝土施工配合比,確定對原材料的選擇原則,探討骨料離析與配合比的關系。The paper expounds the essentiality of the application of database in the emulation system of water resources and hydropower engineering construction process, introduces the ado ( activex data object ) which is a very convenient database link technique, and narrates the course and detail of the database design by an example on the construction process of some rock fill dam with a core wall
摘要闡述了數據庫技術在水電工程施工過程模擬系統開發中的重要性;介紹了一種極為方便的數據庫鏈接技術ado數據對象;通過心墻堆石壩填築施工過程模擬的實例,闡述了模擬數據庫設計的過程和細節。One of the seven wonders of the world, borobudur is the world ' s largest buddhist relic site, built in ad 9th century ; entirely it has nine floors, as high as 40 meters, with the size of 15, 000 square meters, looks splendid and magnificent ; from the ground floor, the walls were built by laying stones, which engraved with buddhist stone carvings, appears lifelike, and spectacular in their beauty
名列世界七大奇景之一,乃全世界最大的佛教遺址,建於公元九世紀,整座建築高九層,高達40米,面積15000平方米,雄偉壯觀,由地面一層開始,墻面皆由石塊堆砌而成,上面刻有佛教石雕,尊尊栩栩如生,令人嘆為觀止。Since 1970 " s, ten and more poured asphaltic concrete core rockfill dams ( pcrd ) have been built in the northeren region of china
自七十年代以來,我國北方地區已建成澆築式瀝青混凝土心墻堆石壩十余座。分享友人