方螺栓 的英文怎麼說

中文拼音 [fāngluóshuān]
方螺栓 英文
square bolt
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 1. [動物學] (軟體動物) spiral shell; snail; conch 2. (螺旋形的指紋) whorl (in fingerprint)
  • : 名詞1. (可開關的機件) bolt; plug 2. (塞子) stopper; cork
  • 螺栓 : bolt; screw bolt; threaded bolt
  1. . square and hex bolts and screws inch series ; addenda

    頭和六角頭
  2. The meal was passed in commonplace talk of what he had been doing during the morning at the abbey mill, of the methods of bolting and the old - fashioned machinery, which he feared would not enlighten him greatly on modern improved methods, some of it seeming to have been in use ever since the days it ground for the monks in the adjoining conventual buildings - now a heap of ruins

    在吃飯的時候,他談一些普通的話題,如早上他在寺廟的磨坊做些什麼呀,上法和老式的機械等,他還說他擔心在先進的現代法面前,那些機械不會給他太多的啟發,因為有些機械似乎是當年給隔壁寺廟的和尚磨面的時候就開始使用了,而那座寺廟現在已經變成一堆瓦礫。
  3. Metric round head short square neck bolts ; erratum

    米制圓頭短.技術勘誤
  4. Type a medium shelving, robust, hign bearing, easy reassembling, full joggling without bolt, widely applied in emporiums, supermarket, enterprise warehouse and so on

    中量a型貨架,造型敦實堅固,承載力大,拆裝便,完全扦接,不用,可廣泛用於商場、超市、企業倉庫等到。
  5. " countersunk head square neck bolts " ploughshare " type

    商業性通用製造.埋頭
  6. Advanced digital hardometers ( testing the hardness and safe load of bolts ) etc. testing equipments. advanced digital hardometers testing the hardness and safe load of bolts ) etc. testing equipments, the 1, 500 sq. m. vertical goods shelves can hold more than 5, 000 tons goods loading, each bin has fixed codes, and has perfect enterprise digital informationization management system and the support of software, which greatly improves the rationality and simplicity of goods loading and enhances the accuracy of goods and quick delivery and is one - up on others

    先進的數字化硬度測試儀(檢測的硬度及保證載荷)等檢驗設備,以及1500平米的立體貨架可容納5000多噸貨物的存放,每個倉位都固定編碼,並有完善的企業數字信息化管理體系及軟體的支持,大大提高了貨物堆放的合理性和簡潔性,大大提高了貨物的準確性和發貨的快速性,使得更勝人一籌!
  7. For reducing the disadvantageous influence of the the relaxation of strain and the lose of pretension on the structure, the time span of delaying scene torsional moment checx and accurate maintence method are given

    為減少高強預拉應變鬆弛和預拉應力損失對結構的不利影響,給出了延遲現場扭矩檢測的時間區間和正確維護的法。
  8. Tweer loesenbeck gmbh co kg offer to you steel screws, bolts and precision screws in addition also info on cold shaped parts

    公司提供雙頭和精密絲、精密釘以及筒范圍內的可行性案。
  9. Building hardware - door and window bolts - requirements and test methods ; german version en 12051 : 1999

    建築五金.門窗用.要求和試驗
  10. Using the optimum calculating method, some important technical parameters could be determined, that is, optimum supporting force, allowable deformation of rock mass, cross section area of u - shape set, pre - tight force and diameter of the bolt as well as torque to provide optimum supporting force

    用這一計算法能求出巖石恆阻支護的重要技術參數,即最優(小)恆阻支護力、圍巖最大允許變形量、恆阻u型鋼支架的截面積、聯接的預緊力和直徑及最優支護力的擰緊力矩。
  11. High strength bolted connections and dog - bone connection are those of connections that were researched in some countries. there are not correlative clauses about these in steel structures design specification ( gbj17 - 88 )

    高強連接和狗骨式連接是目前國內外研究得較多的連接類型,我國的鋼結構設計規范中還沒有具體涉及到此面的內容。
  12. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    重點介紹了外伸端板高強連接的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加載裝置、測量儀器安放、測點的布置等;給出加載式及測出的m -曲線;計算出試驗節點的初始剛度;推導水平集中力作用下單跨門式剛架考慮節點半剛性的側移計算公式。
  13. Forget about screws, bolts, pegs or fixings. leave your tools in the box. the leg disassemble easily and will flat - pack for transportation and storing

    忘掉母、釘子,忘掉安裝吧。把你的工具留在你的箱子里。桌腿可以輕松地拆下,然後便地打包運輸或儲存。
  14. After analysis and detection, a new method was adopted by the plant with the reinforcement of the foundation screws of the airseparating tower and a good result was achieved

    該廠在檢測、分析后,沒有採取將空分塔體拆除、基礎重澆的慣例,而是採取了將空分塔體地腳加固的案,取得了很好的效果。
  15. Cup head square neck bolts with large head - product grade c

    大半圓頭
  16. Round head square neck bolts with large head metric series

    帶大頭的米制圓頭
  17. Round head square neck bolts with large head metric

    米制大圓頭
  18. Round head square neck bolts " japy " type

    商業性通用製造.圓頭形頸部" japy "型
  19. Cup head square neck bolts with small head and short neck - product grade b

    小半圓頭低
  20. Strengthened cap head square neck bolts

    加強半圓頭
分享友人