方鏟 的英文怎麼說

中文拼音 [fāngchǎn]
方鏟 英文
square shaft
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : Ⅰ名詞(撮取或清除東西的鐵制用具) shovel; spade Ⅱ動詞(用鍬或鏟撮取或清除) lift [move] with a shovel; shovel
  1. If you live in region where it snows, do keep the snow shovels to be kept in cars, along with a torch ( preferably with a blinker built in ), a blanket, spare gloves, etc

    如果你住的地經常下雪,務必在行駛時帶上雪、手電(最好裝有警戒燈) 、毛毯、備用手套等東西以應急。
  2. This paper introduced a new method for determining the bearing capacity of foundation soil using the flat dilatometer test ( dmt )

    摘要簡單介紹扁側脹試驗,首次提出用扁側脹試驗計算地基承載力的法。
  3. Methods the improvements of the operation included ; a supertemporal conjunctival flap 180 with its base at the fornix, the puncture points were located at 8 and 2 o ' clock ( right eye ) or 10 and 4 o ' clock ( left eye ), the straight needle and shovel needle with prolene suture were conducted into the eye via two different side of corneal incision and out of the eye under the scleral flap at 8 and 2 o ' clock ( right eye )

    法術式改進包括:顳上180 、以穹隆為基底的大結膜瓣;穿刺點選擇8點及2點位(右眼)或10及4點位(左眼) ;用聚丙烯縫線所帶直針及針,從角膜切口兩端進入眼內,由8點及2點位鞏膜瓣下穿刺出針。
  4. Earth - moving machinery - safety - requirements for scrapers

    機械.安全.運機要求
  5. The high - lead bronze maintaining parts for the american imported facilities ( simons breaker and 23 stere excavator ) in the three gorges project all reached the life time of american high - lead bronze parts after being installed and run

    為三峽工程的美國進口設備(西蒙斯破碎機、 23立米電等)的高鉛青銅維修件,生產后已裝機運轉,均達到美國高鉛青銅件的使用壽命。
  6. In china, there is only a few scholars have been involved in this field and no systematic taxonomy on this group, this study is to clarify the exact number of the species in china, to describe them, and to revise the current taxonomic system of the subfamily. this study is major in taxonomy of the subfamily hecalinae from china, including its taxonomic resume, zoogeography and taxonomic status. as a result, a revised taxonomic system of hecalinae is proposed, 2 new genera, 10 new species and 2 new subspecies are described, and 3 cinese new records are reported

    文中簡要闡述了頭葉蟬的寄主范圍和為害,本研究的目的和意義,詳細闡述了該亞科的國內外分類概況,簡單介紹了該亞科的研究法,重點進行了頭葉蟬亞科的分類,提出中國頭葉蟬族的屬級分類系統,共記錄和描述中國頭葉蟬亞科2族7屬26種,其中新屬2個,新種10個,新亞種2個,中國新記錄種3個,首次描述了黃綠六室葉蟬thomsoniellanitobei的雄蟲特徵。
  7. Coal mine equipment. troughed belt conveyors for loose bulk materials. cleaning scrapers and lateral bibs used for underground and for above ground. specifications. characteristics. test methods. acceptance testing

    採煤設備.鬆散集料用傳輸槽帶.地面和地下清除運機和側閥栓.規范.特性.試驗法.驗收試驗
  8. Earth - moving machinery. crawler and wheel tractor dozer blades. volumetric ratings

    機械.履帶式和輪胎式拖拉機推土機推土.額定容量
  9. Wood preservatives. determination of the eradicant action against hylotrupes bajulus linnaeus larvae. laboratory method

    木材防腐劑.家天牛幼蟲除劑作用的測定.實驗室
  10. Method for volumetric rating of loader and front loading excavator buckets used for earth - moving

    運土裝載機和前裝載挖土機斗容積測定
  11. Earth - moving machinery. loader and front loading excavator buckets. volumetric ratings

    機械.裝載機和前端裝載的挖掘機斗.裝載體積額定值
  12. Earth - moving machinery ; loader and front loading excavator buckets ; volumetric ratings ; identical with iso 7554, edition 1983

    機械.裝載機和前裝式挖掘機斗.容量額定值
  13. Testing earth - moving machinery - method for the determination of volumetric ratings for hydraulic excavator buckets and backhoe loader buckets

    運土機械試驗.液壓挖掘機斗和反向裝載斗容量額定值測定
  14. Correct measures are essential to carry out the peoples equality and development policy and pertinent religion policy in the multi - nation - state ; to form a correct concept of people and to publicize correct ethos by combining nationalism with patriotism ; to prevent and expose the western countries " factionalism on the peoples issues to the multi - nation - state ; to set down the active and effective measures aimed at the terrorist character of the peoples separatist forces. due to the pervading existence of the peoples separatist forces in the world, different countries need to reach the common conclusion to strike the peoples separatist forces ; to cut the capital resources of the peoples separatist forces and terrorist activities, to root out the basement of them, with the lead of un, strike the international support to them ; besides, different countries should strengthen nation security protection, form a new concept of national security, get international and organizing cooperation and get rid of every form of hegemony and power politics

    在民族國家內部應正確實施民族平等團結、各民族共同發展的民族政策及相關的宗教政策;樹立正確的民族觀,把民族主義與愛國主義相結合,進行正確的民族主義思想理論宣傳;防止和揭露西國家對其他多民族國家實行的民族分裂政策;針對民族分離主義恐怖主義活動的特點,制定出積極、有效的防範措施。由於民族分離主義勢力在世界范圍內具有普遍性,因此,各國應求同存異,尋求打擊民族分離主義及恐怖主義活動的國際共識;切斷民族分離主義分子進行民族分離活動和恐怖活動的資金來源,除國際民族分離主義活動的基地,並充分發揮聯合國主導作用,打擊國際不法組織和個別國家對恐怖活動的支持;此外,各國還應共同加強國家安全工作,樹立新的國家安全觀,進行有組織的國際安全合作,戒除一切形式的霸權主義、強權政治。
  15. And mrs. smith discover a new source of excitement in their marriage, when they re hired to assassinate each other. and that s when the real fun starts. the result is the ultimate action spectacle, as mr. and mrs. smith put their formidable skills to work and their marriage to the ultimate test

    天意弄人,某天當珍及尊各自為受雇的組織執行任務的時候,發覺為敵對集團效力的頭號殺手竟是枕邊人,更諷刺的是兩人這趟的任務是除對
  16. Earth - moving machinery - retarders for dumpers and tractor - scrapers - performance tests

    機械.翻斗車和牽引式運機用減速器.性能試驗
  17. According to the actural experience and comparison with two repair plan to electric bucket tooth, a reasonable one is provided

    根據現場工作實踐,分析了修復電斗齒的二個案,並進行對比論證,提出了有效的斗齒修復案。
  18. Abstract : according to the actural experience and comparison with two repair plan to electric bucket tooth, a reasonable one is provided

    文摘:根據現場工作實踐,分析了修復電斗齒的二個案,並進行對比論證,提出了有效的斗齒修復案。
  19. Hand - held portable power tools - measurement of vibrations at the handle part - 2 : chipping hammers and riveting hammers

    手持便攜式動力工具手柄振動測量法第2部分:和鉚釘機
  20. To save the resources and shorten the development cycle, these research methods were adopted, such as, using ug software to build the model, analyzing the removed snow ’ s track directly on the model, using adams to simulate the structure of avoiding obstacles, and using relative experience data to calculate the whole

    ( 5 )對原避障機構進行模擬分析,改進不合理之處,使刃避障軌跡為上凸曲線。 ( 6 )通過除雪車作業計算,分析前雪作業時整車的側向穩定性、牽引特性及功率匹配特性,提出改進案。
分享友人