方鋼筋 的英文怎麼說

中文拼音 [fānggāngjīn]
方鋼筋 英文
square bar
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 鋼名詞(鐵和碳的合金) steel
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  • 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
  1. Thus the use of steel fiber reinforcement concrete in corbel can avoid complicated calculating in design, and the diminish difficulty of construction, at the same time when corbel ' s dimension can not be increased the reinforcement concrete corbel ' s ultimate load capacity and anti - seismic performance can be improved by the addition steel fiber into concrete. this method has become a kind of applied method and is highly concerned by the domestic and international academe and engineer group

    因此,在配密集的牛腿中使用纖維混凝土可以避免設計時繁雜的配計算、減小施工難度,同時在牛腿截面尺寸不能增大的情況下,可以通過加入纖維來提高混凝土牛腿的承載力和抗震性能,用纖維加入混凝土牛腿已成為一種實用法受到了國內外學術界和工程界的極大關注。
  2. Finally, considering the request of the gfrp bars reinforced furan resin concrete electrobath, we designed the structure of the electrobath and use finite element method to analyse it. in the process, pre - stress also was considered. the result of use in practice indicate the properties of gfrp bars can meet the request of electrobath structure

    最後結合玻璃呋喃樹脂混凝土電解槽的設計與開發,對電解槽的配布置、結構尺寸進行了設計,用有限元法對電解槽的整體結構進行了計算分析,並考慮了玻璃預應力的影響,其設計計算結果已在玻璃呋喃樹脂混凝土電解槽的實際生產中得到了應用,且使用情況良好。
  3. The method of curved lever space rigid frame, a new and practicable numerical method, is based on the utility of reinforced concrete shell structure in practical project and on endogen force analysis of shell structure as this paper extracts

    摘要從混凝土殼體結構的實際應用出發,對殼體結構內力分析提出了一種新型實用的數值分析法曲桿空間剛架法。
  4. In this paper the energy dissipation mechanism and anti - earthquake ductility design of ferroconcrete frame structure are expounded mainly

    文章主要闡述了混凝土框架結構的耗能機理和抗震延性設計的法。
  5. Abstract : by using engineering example this paper briefly introduces the application and constrction method of ferroconcrete filling pile in the transformation of old buildings

    文摘:以工程實例簡要介紹了砼灌注樁在舊樓改造中的應用及具體施工法。
  6. 5. according to the foresaid means of assessment, applying the principle of three - rated precaution and twice designs, i develop the procedure of anti - seism, which strengthens the reinforced concrete bridge with carbon fiber

    5 、根據以上的評估法及加固理論,運用三級設防、兩次設計原則,開發碳纖維加固混凝土橋梁的應用程序。
  7. Grout for prestressing tendons. test methods

    預應力混凝土構件用泥漿.試驗
  8. Abstract : considering the action of soil lateral compression on the single base with short column and the research result of the piles, the calculation to the effect of soil lateral compression on the base is put forward. according to the calculation results, the design method of the single base with short column considering the soil lateral compression is given. it ' s apparent that the design method here can save concrete and reinforcement compaired with the one without considering the lateral action of soil

    文摘:考慮土壤側壓力對帶短柱獨立基礎的作用,基於對樁的研究結果,提出土壤側壓力及對基礎受力影響的計算,根據分析計算結果提出了考慮土壤側壓力作用的帶短柱獨立基礎的設計法,顯然這一計算法較未考慮土壤側壓力作用的計算法合理並能節約砼及
  9. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明隧道混凝土二次襯砌中的底界厚度、空洞、漏水、網變形等質量問題,利用探地雷達技術,通過對檢測法及工程檢測實驗的研究,進行隧道二次襯砌中雷達波形特徵參數及檢測結果評價,總結了隧道襯砌質量問題的雷達波形特徵,驗證檢測法的精度和可靠性。
  10. Meanwhile, by using delaminating combination finite element method and macro finite element analysis methods, the paper present two kinds of analysis programs. based on the aforementioned analysis program, the failure form, distribution of plastic hinge, load - carrying capacity, displacement and ductility characteristics are investigated to reveal the failure mechanism and the failure proceeding under seismic effects. the results are in good agreement with the test results, indicating the precision of the aforementioned two programs is satisfiable to the practical engineering design

    分別採用分層組合式有限元和宏觀有限元分析法,編寫了2種混凝土中高帶邊框柱剪力墻結構的彈塑性有限元分析程序,同時利用上述2種分析程序,研究了模型結構的破壞形態、塑性鉸的分佈、承載力、位移及延性性能等特性,探討了這類結構在地震作用下的破壞全過程與破壞機理,得到其主要受力特性和抗震性能的一般規律,所得結果與試驗值吻合較好,表明上述2種程序分析結果的精度均可滿足實際工程的設計要求,因此可用於這類結構的抗震性能分析與設計。
  11. Hoop - stove chimney in the bao - steel incorporated company steel pipe factory regarded as the specifiable object the paper makes systemic studies including investigation and inspection of the reinforced concrete chimney and reliable assess method. some studies performed and results achieved mainly include : synthetical investigation method of the reinforced concrete chimney usage condition is put forward and real usage condition of the hoop - stove chimney in the bao - steel incorporated company steel pipe factory is handled by means of entirely investigation and inspection ; the mostly reason for impairment and defect of chimney locating in steel pipe factory hoop stove is revealed through result analysis of investigation and inspection ; to meet practical requirements that corporations manage industrial building all alone the paper presents condition appraisal method on reliability of the reinforced concrete chimney and assesses the reliability of hoop - stove chimney in the bao - steel incorporated company steel pipe factory

    論文以寶山鐵股份有限公司管廠環形爐煙囪為具體對象,對混凝土煙囪的調查檢測和可靠性評定法進行了系統研究,主要研究內容和成果包括:提出混凝土煙囪使用狀況的綜合調查法,並對管廠環形爐煙囪進行了全面調查和檢測,掌握了煙囪實際的使用狀況;通過對調查檢測結果的分析,揭示了管廠環形爐煙囪損傷和缺陷的主要原因;針對我國企業內部對工業建築管理的實際需要,提出混凝土煙囪結構可靠性的狀態評估法,並管廠環形爐煙囪的可靠性進行了評定。
  12. Standard for test methods of welded joint of steel bars

    焊接接頭試驗法標準
  13. The sustentation fund from hunan province ’ s building project ( research on the design analytical method of structural system of reinforced concrete special - shaped columns ) is received in the process of the paper ’ s study

    本課題得到湖南省建設科技項目(混凝土異形柱結構體系分析設計法研究)的資助(湘建2002 - 576 - 50 ) 。
  14. Here we obtain the strain compatibility method ande equilibrium of forces and concepts of fracture mechanincs, they can be used to predict the ultimats strength in flexure that can be achieved by such elements, given the cfrp cross - sectional area, or conversely, the required cfrp cross - sectional area to achieve a targeted resisting moment of rehabilitated flexureal elements

    Cfrp加固梁在承受彎曲荷載時的破壞是屈服后碳纖維斷裂和屈服后混凝土壓碎。本文通過應變相容法和對破壞機理的定義,由給定的cfrp橫截面積預測加固梁的極限彎曲強度;或者相反,在已知加固梁的極限彎曲強度時可以求出所需的cfrp橫截面積。
  15. It is determined that with accurate knowledge of the complete stress - strain curve of concrete in compression, steel in tension, and with an iterative computerized non ? linear method, it is possible to predict the entire moment - curvature, moment - flexural rigidity and axial rigidity relation ship of a cross - section of a structure member

    可以確定,只要知道混凝土受壓和受拉的完整的應力應變關系,採用選代的非線性計算法,就有可能預測結構截面彎矩一曲率、彎矩一彎曲剛度和軸向剛度的關系。
  16. The basic theory and step of whole process analysis of reinforced concrete beam section flexural rigidity is stated, the realization program is worked out and the academic example is analyzed. 4. based on the static - state load test result of two practical projects, the application of the reinforced concrete beam system bridge structure disease examination and structure damage evaluation method is stated, and satisfaction result is gained

    1 、綜述了當前混凝土橋梁結構檢測及損傷識別的各種法體系,並簡要評價了各法體系的應用與不足; 2 、論述了基於靜載試驗的梁分段剛度系統識別的基本原理,編制了實現程序,並進行了數值算例分析,提出基於本原理的梁橋結構損傷識別與結構評價法體系; 3 、闡述了混凝土梁截面抗彎剛度全過程分析的基本原理和法步驟,編制了實現程序,並進行了相關算例分析; 4 、結合兩片工程實例梁的靜載試驗,詳述了梁橋結構損傷識別與結構評價法的應用過程,得到了預期的效果。
  17. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;連接改進傳統的電焊連接式,採用大量採用接頭機械連接技術,有效提高了接頭強度和連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  18. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了案設計,對比幾種不同的托換案和節點及構造設計,提出了「通穿柱法」做承臺梁, 「抗彎抗剪錨法」強化柱加固效果, 「板箍法」做地基梁連接點等多項技術;在施工案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工案提出有針對性的施工技術措施,人工挖孔樁施工採用砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行籠吊裝簡化施工工序;承臺梁施工採用梁主橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  19. This paper focuses on the research of the stress mechanism of the ribbed shell structure in statics, dynamics and under the explosive load on the basis of the engineering practice of cave depot of single aircraft. in this paper, according to the classical shell theories, the basic differential equilibrium of the ribbed shell structure and the finite element analysis of 3d rippled plate are established, in which the function of annular ribs reinforcement bars and 3d ripped steel plates are distributed in the range of the steel, and the functions along the longitude direction of tension, bending, and torsion are neglected ; applied with dynamic analytical theory, the dynamic model of ribbed shell structure and the analytical theory model of elastic - plastic are set up ; the triangle series method is used to solve the displacement and stress under the distributed load and the concentrated load of the ribbed shell structure

    本文以軍用機場地面單機掩蔽庫工程建設為工程背景,首次對內襯三維波紋板混凝土拱型復合結構的受力機理進行了靜力、動力和爆炸荷載的分析研究。根據將橫肋、及三維波紋板的作用均勻分佈在殼體范圍內的情況,忽略橫肋、及三維波紋板沿殼體母線向的抗拉、抗彎及其抗扭作用,首次推導出了內襯三維波紋板混凝土殼體的微分平衡程,建立了有限元計算模型,並採用三角函數法,求解了三維波紋板混凝土拱型復合結構在分佈荷載和集中荷載作用下的位移響應和應力響應,並與普通殼體進行了比較。
  20. Because of its resistance to electrochemical erosion, low manpower demand for application and minimal changes in geometrical dimensions of the member, the method has been found to be economical and efficient for application, based on the previous work, we designed and conducted experiments of 10 reinforced concrete ( rc ) slabs strengthened with the common carbon fiber reinforced plastic ( cfrp ) ; and investigated the effect, failure mechanism and theory

    由於具有耐腐蝕、施工簡便快捷、幾乎不改變構件原有尺寸等特點,得到廣泛的應用,具有良好的經濟效益。在前人的工作基礎上,我們設計、試驗了10採用碳纖維布加固的混凝土單向板,探討了加固單向板的加固效果和理論分析法。
分享友人