施主電荷 的英文怎麼說

中文拼音 [shīzhǔdiàn]
施主電荷 英文
donor charge
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 荷名詞(蓮) lotus
  1. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的工方法,目前,砼防滲墻的設計還是以傳統的設計方法為,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  2. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究機組間的水力干擾,本文採用matlab下的simulink作為模擬工具,建立共用有壓引水管道、調壓井、壓力管的兩臺高水頭引水式水輪機調節系統大波動時的模擬模型,引入實際站的參數,對甩負過渡過程進行了模擬計算,分析水力干擾對站安全、穩定運行所造成的影響,並提出了一系列減輕水力干擾的措
  3. With fast development of our country " s gas industry and air ' s increasingly serious contamination in city, using gas instead of coal and supplying energy in high efficiency and cleanliness has become necessary way in city. there are different problems in the current heating ( air conditioning ) systems. in the cogeneration system, heat and power affect each other, heating - pump heating ( aie conditioning ) system can not satisfy the peak load very well, the cost of gas fuel in boilor heating sestem is so high. the high generating efficiency of the diesel - engine two - sourse heating ( air conditioning ) systems is limited in range of 100kw - 1000kw, the heating scope is so limited. combined cycle of two sourse heating ( air conditioning ) system is most suitable selection to buesness community with big scope my paper aim at this syetem ' s primary question when it is applied in our country - - - - bringing project into execution and technology economy feasibility and off - design performence, combined with a certain demonstrating project in beijing buesness community, going along with calculating and analyzing, drawing out some efficient datas and conclusions, based on this, bringing out primary alements affecting combined cycle of two sourse heating ( air conditioning ) system " economics

    聯產系統熱相互牽連,熱泵供暖(空調)系統不容易很好地滿足尖峰負,鍋爐供暖系統供熱中天然氣燃料構成的成本過高,內燃機雙源供暖(空調)系統的高發效率僅限於100kw - 1000kw負范圍,供熱面積有限。對于大面積的商業園區、居民小區,燃燒天然氣的燃氣-蒸汽聯合循環雙源供暖(空調)系統是最佳選擇之一。本論文針對該系統在我國應用時的要問題- - -方案的技術實與技術經濟可行性,結合北京某一商業園區示範工程,進行了系統的計算與分析,得到了有效的數據與結論,在此基礎上,提出影響聯合循環雙源供暖(空調)系統經濟性的要因素,並進行敏感性分析,得出有益的結論;最後通過各種供暖方案的比較分析回答了某些人對該系統的疑慮和不解,並指出系統的優化方向。
  4. Fujian power is the first one to implement wireless public network load management terminal access attestation in the whole country

    摘要福建力在全國率先實全省范圍內無線公網負管理終端接入的自鑒權。
  5. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外水壓力問題,進一步分析和研究了襯砌水載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水站深埋長引水隧洞作為本文的要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和灌漿封堵方案不同情況下的滲流場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措
  6. Moreover presents a step - to - optimization contract mode that can effectively estimate the cost of customer ' s participation in order to take a customer - specific incentive payment and maximize the benefit of utility by using the customer behaviors. meanwhile also discusses a model about the dynamic flow model with the consideration with interruptible load. on the other hand, this paper discusses the influence from the demand side generation for the electric power system and presents an advanced design model for distribution networks, especially for demand side generations

    本文首先總結了需求側管理的基本概念和要內容,然後根據以前的研究成果,提出一種基於用戶行為的分步優化合約方案,能有效的估算用戶實該措的成本,從而達到力公司收益最優,同時討論了考慮可中斷負的動態潮流模型;另一方面,本文還基於分佈發技術,探討了用戶發資源對力系統的影響,並提出考慮該資源的配網規劃模型改進方案。
  7. Flexible load control, an important program of dsm, comprises the interruptible load and demand side generation. this paper shows how the application of dsm can be a very efficient technique for energy conservation

    在需求側管理中,柔性負是一項重要內容,要包括可中斷負和用戶側發等內容。
分享友人