施工依據 的英文怎麼說

中文拼音 [shīgōng]
施工依據 英文
manufacture bases
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ動詞1 (依靠; 依仗) depend on; rely on 2 (依從; 同意) comply with; listen to; yield to Ⅱ介詞...
  • : 據Ⅰ動詞1 (占據) occupy; seize 2 (憑借; 依靠) rely on; depend on Ⅱ介詞(按照; 依據) according...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Facing the new environment of wto, how to participate in the aboil competion market and how to use the scientific theory and technique to bid as a chinese construction enterprise is a very important and exigent research subject

    面對加入wto的新環境,我國企業如何積極參與市場競爭、科學的理論與方法進行程投標,是一項非常迫切和重要的研究課題。
  2. The authors analyze and select landslide parameters by using back analysis method, and consult with the congeneric landslide to determine this landslide parameters, which can offers reference to design and construction department

    用反分析方法對水井坪滑坡參數進行分析選擇,並參照同類滑坡確定該滑坡的參數,為設計和單位提供
  3. The subject is based on the study forward position of water resources management of liaoning province, and use the developed tendency and succeeded experience of world water resources for reference, take theory of sustainable development as guiding ideologue, adopt systematic project, protection of ecosystem and environment and theory of economy forecast engage in composite analyze, dynamic evaluate and forecast analyze, forecast developed tendency of water resources supplement and demand of liaoning province, put forward water resources rational disposition, economize on water, the prevention and control of water pollution and strength water resources protection etc. measures, supply decisional foundation for fight drought, economize on water and water resources optimized disposition, is water resources strategic research forward sustainable development, is a part of water conservancy developed program of liaoning province in the 15 period, and it has important significance to accomplish the sustainable development of economy and environment of liaoning province

    本課題立足於遼寧省水資源管理研究前沿,借鑒了國內外水資源發展趨勢和成功經驗,以可持續發展的理論為指導,運用系統程、生態環境保護理論和經濟預測理論進行綜合分析、動態評價,進而預測遼寧省水資源供需發展態勢,提出了遼寧省水資源合理配置、節約用水、水污染防治和增強水資源保護等措,為遼寧省抗旱、節水和水資源優化配置提供決策。本文是面向可持續發展的遼寧省水資源戰略研究,是「十五」期間遼寧水利發展規劃整體布局的一部分,對實現遼寧省經濟、資源可持續發展具有重要意義。
  4. Secondly, according to some performances of putty specimen such as strength mucosity work function, the effect of cmc and pp fiber was discussed by contrast experimentation. and find the last elements and mix proportion. thirdly, the article researched generally other performances about pp fiber putty by contrast

    其次,以膩子試件的強度、粘結性能及性能等作為考察,通過對比試驗研究分析了甲基纖維素和聚丙烯纖維對試件的影響,確定了新型膩子粉的最終配方。
  5. This paper utilized the deformation characteristics of rock and expatiates on the strain test method of surrounding rock by which to judge the surrounding rock ' s stability, and to choose the suitable opportunity and style of the secondary lining

    摘要利用巖體的變形特性,通過測試隧道圍巖應變出隧道凈空實際收斂量,從而判定過程中隧道圍巖的穩定性,為選取合適的支護時機和方式提供
  6. Where pieces of the fascia had been demolished by earlier additions, new molds based on original shop drawings were designed and new pieces cast

    有些裝飾線腳曾因早期的加建受損,而新的裝飾線腳旅館的原始圖被設計和建造出來。
  7. Because all the stratal configuration in loess ravine region are similar totally, the numerical model in this paper can be modified to suit for other section

    由於黃土溝壑區濕軟地基的地層結構較為類似,文中的數值模型可修改相應參數後用于其他相似斷面,為地基處理方案的設計和提供
  8. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的程設計和提供參考
  9. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根程實踐,提出了用全站儀直接測量平距、高差來代替測斜距、天頂距作四等及四等以下控制網測量的理論和方法,並以張河灣抽水蓄能電站控制網為例進行了比較計算。
  10. This paper researches the basic statistical rule of oil - gas dynamic system from the systematic theory, combining with the common characteristic and structure characteristic of oil - gas dynamic system, taking the design requirement of oil field development programming into consideration, by using of functional simulation principle ( including nn method, differential simulation method ) and historical data of oil field, establishes the in - out conjunctional relationship of dynamic index of oil field development, and researches the two level index prediction of development dynamic with both oil field and oil production plant on the basis of the in - out conjunctional relationship. furthermore, this paper analyzes the " decision - making variable ", " object " and " restriction terms " by the optimization theory and set up several optimal models which compose the oil field development programming, it is following : optimization model of the production composing ( solving the optimal composing of each subentry production and cor responding cost, workload, including the onshore thin oil production, the heavy oil thermal process production, tertiary oil recovery production, and the offshore production ) ; optimization model of measure production structure ( determining the optimal composing of each measure production and measure workload, which is composed of fracture, acidulation, capital repair and so on ) ; optimization model of the production distraction ( optimal distribution of the whole oil field production to each oil production plant ) and the integrated development programming model of oil field

    本文從系統理論出發研究油氣動態系統基本統計規律,結合油氣動態系統的一般特點,結構特點,兼顧油田開發規劃設計的要求,利用功能模擬原理(含神經網路方法、微分模擬方法) ,油田歷史數,建立了油田開發動態指標間的輸入輸出關聯關系,並在此輸入輸出關聯關系的基礎上研究了油田及採油廠兩級的開發動態指標預測,同時利用最優化原理,在分析「決策變量」 、 「目標」及「約束條件」的基礎上建立了多個構成油田開發規劃的「優化模型」 ,這些優化模型包括:產量構成優化模型(解決陸上稀油產量、稠油熱采產量、三次採油產量、海上產量及對應的成本、作量的最優構成問題) ;措產量結構優化模型(解決壓裂、酸化、大修等各項措產量及措作量的最優構成問題) ;產量分配優化模型(將油田的產量最優地分配到各採油廠)以及油田綜合開發規劃模型。
  11. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要進行了富水電廠發電進水口閘門啟閉機平臺安全檢測,現行規?對其建築物進行了設計與復核、結構的強度復核和建築物的裂縫成因分析。
  12. Review is made on the results of two designs for the high pressure pregrouting at the stopes of the main shaft and the auxiliary shaft in an iron mine. one design took the geological characteristics as the basis and was strictly and scientifically made. with proper construction technical measures, it brough both good technical and economical effects to the grouting engineering. the another design was made in no consideration of practice. as a result, it brought avoidable losses to the engineering. its failure cause are analyzed

    評述某鐵礦主副井作面高壓預注漿的兩種設計結果:一是以地質特點為,嚴格按科學設計,技術措得當,給注漿帶來了良好的技術經濟效益;二是未從實際出發進行設計,給程造成不應有的損失,剖析其失敗原因。
  13. In order to get an better control in horizontal displacement of tower top and the internal strength and displacement in beam, the theme take an circulating forth piece together means and get to a good target. the theme carry the theory through bsap program in design of the large highway bridge in anqing and prove the theory of the theme ' s useful and availability

    結合在安慶長江公路大橋的設計作,論文採用了bsap系列程序有針對性的進行了實際應用,實際生產的使用表明了本文所採用理論與方法的有效性,為斜拉橋控制的模擬計算過程提供了一種參考與
  14. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法,現實地解決了樁、土與筏板接觸面的變形協調關系;通過對樁、土受荷過程的實際測試,得出了樁、土分擔荷載比例和變化過程,從而為樁、土的荷載計算提供實際;從設置的大量沉降觀測點中所得到的沉降資料,得出荷載、沉降變化規律,從而指導在實際中,防止加載過快而導致速沉,避免由此帶來的土體破壞的嚴重後果;通過沉降規律分析,得出了適用於軟土地區的樁基沉降計算方法,用於指導實際,以滿足沉降控制的強制性標準。
  15. According to the distribution peculiarity of the two characteristic moments, the accessibility of water quality in taizhou source of yangtze river has been analyzed based on the maximal contamination zone of entire tide and the relationship between the length of contamination zone and the pollutant load. simultaneously, every project has been analyzed and compared by using the model in wuli lake water environmental renovation for getting some theoretic gist and technical supports for the engineering

    在此基礎上進行泰州江段水流水質數值模擬,建立排污混合帶范圍與排污量關系曲線,並對泰州江段供水水源地水質可達性進行了分析;將模型應用於五里湖水環境治理程中,預測各引水方案下湖體水質狀況並進行各方案分析,從而為程實提供一定的理論和技術支持。
  16. Performance evaluation, on which many other functions are based, is the most important part of hr management, and its basic purpose is to make its employees continuingly develop, providing the fundamental force to push the enterprise forward

    績效考評作為企業人力資源管理中關注的重點,為實人力資源的其他職能提供,但它最深層的目的是促進員的發展,因為企業持續發展的根本動力就是員的發展。
  17. Abstract : to account some difficult problems in theoretical calculation of blasting demolition of buildings, the criterion for disintegration of brick - concrete structures, blasting height of frame structure, counteracting force of supports are analyzed. a numerical simulation is demonstrated for structure ' s destabilization and dilapidation in the process of blasting demolition of buildings such as chimney and bridge, which services a guide for theoretical study and practice of blasting demolition of buildings

    文摘:針對建築物爆破拆除理論計算難以把握的幾個問題,如磚混結構解體的判,框架結構建築的爆高、支座反力,以及框架結構失穩和煙囪、橋梁爆破拆除倒塌過程的數值模擬方法,進行了分析和說明,為建築物爆破拆除設計理論研究與提供了參考
  18. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁剖面和壩體中心縱剖面的溫度等值線圖、拱冠梁剖面和壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱壩的設計和中採取相應的溫控措提供了參考
  19. Therefore, the result of integral stability analyses and evaluation can be effectively used in the engineering design and engineering execution

    這將巖質邊坡的穩定性分析評價變成了實實在在的程設計、施工依據
  20. This method not only can identify and locate the cause of fatigue damage, but also can be regarded as the reference of adopting strengthening techniques

    應用結果表明,該方法可以對疲勞事故的原因進行診斷,並且可以作為採用藝強化措
分享友人