施工延期 的英文怎麼說
中文拼音 [shīgōngyánqī]
施工延期
英文
postponement of period for construction- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 期 : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
- 施工 : be in the process of construction; be under construction; build; construction
-
It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months
樂灘電站從2001年10月底開始施工準備到2004年12月20日首臺機組投產發電,僅用38個月的時間,比合理工期提前了7個月,並在此期間,搶回因廠壩部份地基巖溶地質問題延誤的5個月工期。Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance
通過試驗研究認為:玻璃纖維瀝青碎石的技術性能不如瀝青碎石好,但路用彈性性能較好,如能解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其路用性能仍值得探討,瀝青橡膠碎石結構層具有變形性能和抗裂性能良好,空隙率小,防水性能好,熱穩定性較好,施工工藝簡單的特點,因此,瀝青橡膠碎石是二級及二級以下公路因疲勞而開裂的瀝青路面的良好罩面材料,也是防止半剛性基層收縮裂縫反射的良好結構措施,在瀝青類路面面層和半剛性基層之間夾鋪瀝青橡膠碎石薄層,雖然造價比夾鋪土工布高,但其施工工藝,抗裂性能和防水性能均優于土工布,不僅可以大大減少半剛性基層材料的反射裂縫,延長路面使用壽命,而且可能適當減薄瀝青混合料面層的厚度,雖然初期造價有所增加,從長遠來看,具有十分重要的技術和經濟意義。This paper unite surveys works in dong gua shan mines construction under 1 km place researching four key technology in mine s survey, they are construction survey technology in km deep mine, km deep mine s connected survey technology, km deep level survey technology of longer distances link up in many heads opening and basic control survey technology, km mine s extension when the production must go on accurate fixed position survey technology, and all obtained success
本文結合在千米以下冬瓜山銅礦建設時期的測量工作,研究了深部礦山測量四個方面的關鍵技術,即千米深井施工測量技術、千米深井聯系測量技術、千米深井中段多頭開拓長距離貫通和基本控制測量技術、千米深井不停產延深精密定位測量技術,並取得了成功的效果。1 the pipe locating of shenzhen metro first phase
13深圳地鐵一期延長線施工圖階段巖土工程勘察Project construction, as the owners did not agree to pay for the contract, or other owners of the obligations assumed by the reasons caused the increase in construction costs, extended construction period, project contractor compensation to the owners of losses ( cost or time limit ) of a written request, known as the engineering claims
工程建設中,由於業主未按合同約定支付工程費用,或其他應由業主承擔的義務等原因而造成的增加工程施工費用、延長施工期限等,工程承包單位向業主提出賠償損失(費用或工期)的書面請求,稱為工程索賠。Furthermore tunnel structure commonly is designed by analogy method. on design, often, normally in view of safe consideration, adopt the method that reduction surrounds rock classification and uses fussy construction technology. so as soon as coming, engineering investment is certainly increased and construction project time is prolonged
且隧道結構一般按類比法設計,出於安全考慮,設計上一般採用降低圍巖類別,使用復雜的施工工藝來提高施工的安全性,這樣無形中增加了工程投資費用且延長了施工工期。In view of a suburb major trunk road pavement failure, mainly from surface depression, cracking and slipping, water destruction, design failure, this paper analyzes the cause of destruction, proposed the preventive measure, to avoid the early destruction of the pavement, thus enhancing the quality of the road surface and lengthening the service life of the road
摘要針對市城郊某主幹道的路面破壞現象,主要從路面沉陷、裂縫和滑移、水破壞、設計不合理等幾個方面分析瀝青路面產生破壞的原因,同時對應地提出了瀝青路面破壞的預防措施,以此引起廣大道路設計人員與施工人員的重視,避免瀝青路面的早期破壞,從而提高路面的使用質量和延長道路的使用壽命。As one of new composite structures in the field of civil engineering, concrete - filled rectangular steel tubular ( cfrt ) structure has high capacity, large energy absorption capacity, and high ductility, also it has regular shape which is easy to connect between columns and beams, convenient fire - control measure, and short construction time
方鋼管混凝土結構作為一種新型組合結構,具有承載力高、耗能能力強、延性好等特點,且外形規則便於樑柱連接,防火措施簡單,施工周期短,因此,在中高層住宅建築中有較廣泛的應用前景。Based on the studies, it is proved that lime fly - ash mixture is provided with more time to compact during construction compared with other base materials in forming even higher structure strength but not in reducing strength within 1 ~ 3 days period of time. meanwhile, structure strength of the mixture which has been destroyed by some reasons can be recovered in a great extent if original structure is regained. on the other hand, during the high temperature summer season or under other conditions promoting the mixture to form strength, continuous construction process between lime fly - ash base course and bituminous pavement can be carried out to complete the building process in short time
確認二灰基層材料與其它類型的基層材料相比,在施工時具有較長的施工碾壓成型時間,在一定時間里延遲成型的二灰基層強度不僅不降低,反而還有一定程度的提高;與此同時早期受到破壞的二灰材料在恢復整體性的條件下,結構強度能夠在很大程度上得到再恢復;另一方面,在夏季高溫季節以及在強化基層強度形成的前提下,二灰類基層和瀝青面層可以採用連續施工的方式在較短的時間里完成路面鋪築工作。In addition, influence to density and strength of cement - stabilized soil because of molding delay and reasonable curing period from completion of subbase to the compaction of road - base are also researched. finally, experiment section of cement - stabilized silty soil subbase is constructed according to lab research results, and construction methods are summarized
此外,研究了延遲成型時間對水泥穩定土的密度和強度的影響及底基層成型后至基層壓實前的合理養生齡期,最後,根據大量的室內研究成果進行了大劑量水泥穩定粉質土底基層試驗路的鋪築,並對施工工藝進行了總結。The improper excavating will bear capacity, water permeability, natural structure and geological structure worsenning the base rock of foundation., this ca n ' t be allowed to the water conservancy project building, especially to block water building. lt will not only increase the expenses happened of the remedy measure, but also lengthen building straight line time limit for a project of construction
開挖不當將降低基巖的承載能力、增大基礎的透水性、惡化基巖的天然結構和地質構造,這對於水工建築物,特別是擋水建築物是不能允許的,同時將會增加採取補救處理措施所發生的費用,延長建築物施工直線工期。Periodic maintenance and rehabilitation can prolong the road ' s service life. an asphaltic overlay is applied to the old pavement surface in good time, which not only enhances the strength of the pavement, but also improves the using performance of the old pavement instead of doing lots of rebuilding works. therefore, the thickness of asphalt concrete overlays is less than the thickness of the reconstructed pavement
定期的養護與維修可以延長瀝青路面的使用壽命,及時地在瀝青路面上加鋪罩面,不僅可以增強路面強度,還可改善路面的使用性能,而不必做大量的重建工作,其厚度也小於重建施工的厚度,因此對于已破損的路面,採用瀝青混凝土罩面常可以提供最經濟的修復形式。At last, aimed at the fact that eso is difficult to carry out in china, after the experiential analyze of the system of administrators or future shares in china now, this paper puts forward the countermeasures as that the long - term incentive tools we should focus on are performance unit, internal price phantom stock
最後,針對中國難以實施eso的事實,並對目前國內實行的管理者持股(或期股)制度,進行了經驗分析后,根據中國的國情,提出了目前應加大業績單位、延期現金收入等長期激勵工具,在將來再形成各種長期激勵工具並存的對策。Enterprises can delay payment and designs the job ladder not only to stabilize the work team, but also to encourage employee to invest in human capi tal. the payment which employee obtains depends on not the short - term contribution, but the long - term contribution. this paper, based on the facture existence of internal labor market in a firm, reveals the characteristics of internal labor market, considers that internal labor market is the inevitable product under the fact that physical capital employs human capital
為了穩定員工隊伍,鼓勵員工的人力資本投資,確保雇傭雙方人力資本投資的回報,企業向員工提供延期報酬和內部晉升的工作階梯等激勵措施,企業並不注重員工的某一時期的績效水平,也不會逐一計量員工的業績水平,而是注重員工的較長職業生涯階段的貢獻,企業所支付的報酬不是某一時期勞動生產率的反映。However, there are many troubles in constructing in gravel, such as drilling difficult, hole collapsing and drill losing, which will lead to enlarge or shrink pile ' s diameter, form fault pile, delay the time, increase the use of material and higher the investment
但灌注樁在卵石層中施工或穿越卵石層會遇到鉆進困難、孔壁易塌、掉鉆卡鉆等諸多問題,造成擴徑、縮徑、斷樁等病害,使工期延長,材料用量增加,費用增高。This paper investigates time and fee claimed at the condition of construction delay from contractor angle
本文立足於承包商的角度,對施工延誤情況下工期和費用索賠進行了研究。Combinating engineering examples, the paper analyzes the engineer how to handle the delay for a project, accelerating construction, and unforeseen events
結合工程案例,分析了工程師如何處理工期延誤、加速施工、不可預見等難以處理的索賠事件。The action mechanism, construction technology of deep cement mixing pile and inspection for the project as well as the advantage of using deep cement mixing method to consolidate soft soil foundation were expounded in the paper by the actural example of the coal yard expended southward of no. 1 and no. 2 berths of the phase two project, beilun
通過北侖港區二期1 、 2泊位煤炭堆場南延工程實例,闡述了深層水泥攪拌樁的作用機理、施工工藝、工程檢驗以及應用深層水泥攪拌樁加固軟土地基的優點。Based on internal rate of return as dynamic index of financial evaluation, the authors quantitatively analyse the critical point of investment inflation for a project, which can be explained as follows. assuming that the project is in a definite time limit during which the internal rate of retum should not be less than minimun attractive rate of return ( marr ), an analysis is made on the critical value of allowable maximum inflation of investment cost. similarly, assuming that the project is in a definite investment, an analysis is made on the critical point of allowable maximum delay of time limit for the project. by critical analysis of inflation of investment and delay of time limit for a project, an investigation can be made on the capacity for a project to bear the risk of investment inflation and time limit delay ; and then a scientific basis can be offered for arranging invesetment and drawing up schedule of construetion
根據建設項目財務評價的動態評價指標? ?內部收益率,定量地分析建設項目的投資膨脹臨界點.假設在工期一定情況下,研究分析項目的內部收益率應該至少等於國家規定的行業基準收益率時,其允許投資費用的最大膨脹臨界值.類似於投資膨脹臨界分析,假設在項目投資一定情況下,得到允許建設工期的最大膨脹臨界點.通過投資與工期膨脹臨界分析,可以考察投資項目承受投資增加和工期拖延的風險能力,為合理安排投資和編制施工進度提供科學依據The rolled products project experienced some initial delay owing to adverse weather conditions and prolonged negotiations over some design and engineering contracts
鋁軋制產品項目開展初期,由於天氣狀況欠佳,加上在設計及工程合約上的洽商出現了延誤,故施工期早段有所延誤。分享友人