施工區域 的英文怎麼說
中文拼音 [shīgōngqūyù]
施工區域
英文
execution area- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 區 : 區名詞(姓氏) a surname
- 域 : 名詞(在一定疆界內的地方; 疆域) land within certain boundaries; territory; region
- 施工 : be in the process of construction; be under construction; build; construction
-
To avoid the retardation of flood water, improve the discharging conditions and reduce flooding frequency and flowage damage on flood retarding basins, huai river commission made a decision to adjust and regulate the middle courses of huai river. the authorial thesis is based on the main part of huai river flood - protection planning, i. e., the flood - protection planning of huai rivers middle courses. author of thesis participated in the drawing up and the administrating of the plan
為了擺脫中、小洪水行洪不暢,減少行、蓄洪區在中、小洪水條件下的行洪機遇,淮河水利委員會在淮河流域總體防洪規劃中,決定重點解決淮干中遊河道防洪問題,論文作者親自參與制定了淮河中、上遊河道防洪規劃制定工作,並組織、領導規劃中各項骨幹工程的施工建設,前後數年之久。Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation
本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。We worked hard to prevent and control water pollution in key river valleys and regions, such as the three gorges reservoir area, the songhua river, the sources and routes of the south - to - north water diversion project, and the bohai sea. we carried out key environmental protection projects to desulphurize emissions from coal - fired power plants, treat urban sewage and dispose of waste safely
積極推進重點行業重點企業和重點工程的節能工作,開展循環經濟試點,加強三峽庫區松花江南水北調水源及沿線渤海等重點流域和區域水污染防治工作,實施燃煤電廠脫硫城市污水處理垃圾無害化處理等環保重點工程。Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now
特別是對在高地應力、高地下水位區域的隧洞建設,其施工難度更大,在國內的水利水電工程建設中並不多見。This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme
此程序可以模擬單井抽水時計算區域各點水位降深隨時間的變化,研究水流運動規律;求解任意邊界條件下的井定流量抽水問題,預測潛水位,指導施工開挖進度,評價降水方案的合理性。As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people
隨著國內高層建築的發展,深基坑支護工程越來越多,綜合青島市區的地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑施工時需要爆破施工,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑支護工程越來越引起了各方面的重視。It is necessary to know its proportion of the two kinds of pollution in the region for more pertinency for pollution prevention measures during the practical environmental protection
在現實環境保護工作中,為了使污染防治措施更有針對性,有必要了解區域內兩類污染各自所佔的份額。Some particular measures to be taken are as the followings : ( 1 ) to establish a uniform harmony mechanism in the river basin in order to have a general plan for wetland protection and utilization ; ( 2 ) to combine the existing protection districts according to lake drainage area and species distribution, and to construct new wetland protection region in order to solve problems in management districts ; ( 3 ) to develop wetland restoration and reconstruction ; ( 4 ) to carry out reforesting in formerly cultivated land and to construct shelter forest of the yangtze river in order to control soil erosion and to preserve the water resource ; ( 5 ) to protect and utilize reasonably the wetland resources in the middle and lower reaches of the yangtze river ; ( 6 ) to strengthen the research of wetland science
具體可採取以下措施:在流域內建立統一協調機制,對流域濕地進行保護與合理利用,合理布局,統一規劃;按湖泊流域和物種分佈整合現有保護區,建立新的濕地保護區,解決目前管理上的制約問題;大力開展濕地修復重建;推進退耕還林、長江防護林等工程建設,發揮森林治理水土流失、涵養水源的作用;在保護的前提下科學合理地利用長江中下游濕地資源,開拓新的生產力;同時加強濕地科學研究。On the reginal machinery management in large construction enterprises
大型施工企業機械區域性管理初探Technical thorny problems met during construction of cast - in - situ piles at riprap backfilling area and corresponding countermeasures are expounded to serve as a reference for similar engineering
摘要介紹爆破拋石回填區域鉆孔灌注樁施工中遇到的技術難題,並提出相應的處理措施。對類似工程部位施工有一定的借鑒作用。Experience on pile footing construction technique control in thalassic area
海灣區域樁基施工技術控制的幾點體會In view of existing situation of eco - environment in the west, this thesis divides it into five different zones, according to the principle of suit measures to local conditions, designs different administering modules of forestry ecology ; hi view of existing situation of industrial structure in the west, this thesis discusses specific forestry s contribution on restructuring of agriculture, industry and the third estate
針對目前西部生態環境現狀,合理劃分區域,按因地制宜,分區治理原則,設計適合各區特點的林業生態治理模式:針對日前西部產業結構現狀,提出產業結構調整的基本思路,具體論述了林業對西部農業、工:業及第三產業結構調整所應發揮的作用。提出了各自相應的對策與措施。The induction of our sale, installation is automatic door series product, breed is all ready, norms diversity, construction is careful, vestibular design program innovates, the price is reasonable, after service system is perfect, get the praise highly of broad user and love, the product applies extensively at each big field : line of business of hotel of system of financial system, wealth tax system, public security organs, real estate, guesthouse, shopping centers, wholesome system, education system, newsletter ; participate in early or late completed numerous and major project : na yuan restaurant, overseas chinese restaurant, baud is graceful center, elegant hospital of dagger er group, ao kesi group, golden field group, green city group, shen zhou group, yin continent people, yin ; be appointed to be door of linkage of exchequer special type to order an unit surely by bank of zhejiang province people
我們銷售、安裝的感應自動門系列產品,品種齊全,規格多樣,施工精細,門廳設計方案創新,價格合理,售後服務體系完善,深受廣大用戶的推崇與喜愛,產品廣泛應用於各大領域:金融系統、財稅系統、公檢法系統、房地產業、賓館酒店、購物中心、衛生系統、教育系統、通訊業等;先後參與完成了眾多重大工程:南苑飯店、華僑飯店、波特曼中心、雅戈爾集團、奧克斯集團、金田集團、綠城集團、申洲集團、鄞洲人民醫院、鄞洲第二人民醫院、歐尚購物中心、麥德龍購物中心、天一廣場、萬達廣場、鄞州體育館、寧波大學、諾丁漢大學、慈溪市政府、北侖區行政中心… …被綠城集團、雅戈爾集團、奧克斯集團、民生銀行、深發銀行、交通銀行、光大銀行等指定為定點服務單位;被浙江省人民銀行指定為金庫特種聯動門定點單位。To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction
混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。On the basis of speeches made by experts in the symposium on main agriculture products supply and demand prospects and structure optimization, 6 points of suggestion have been drawn conclusion, which is as follows : 1. include the optimizing agriculture structure and improving agriculture products quality in the key agenda of agriculture and rural economy working ; 2. enhance macro - conditioner of the government in practice, and effectively bring the economy cooperated organization of peasants into playing a bridge role aiming at market demands ; 3. carry out the working of high quality agriculture products zoning in a whole country, set up and consolidate the high quality agriculture products producing bases, and put into effects of the famous brana strategy of high quality agriculture products ; 4. according to the distribution of agriculture products consumer market, adjust and optimize agriculture products cropping structure, and snatch the chance to adjust export trade policy ; 5. according agro - business managing manner to organizing agriculture production, practically improve the level of agriculture products processing value ; 6. never slacken our efforts to produce grains
在「主要農產品供需前景與結構優化研討會」專家發言的基礎上,整理了六點建議:把優化農業結構和提高農產品質量列入農業和農村經濟工作的重要議事日程;以市場需求為導向,切實加強政府宏觀調控,有效發揮農民合作經濟組織的中介作用;開展全國范圍內的優質農產品區劃工作,建立和鞏固優質農產品生產基地,實施農產品優質品牌戰略;根據農產品消費市場的分佈,調整和優化農產品區域種植結構,不失時機地調整出口貿易策略;按產業化經營方式組織農業生產,切實提高我國農產品的加工值水平;絕不放鬆糧食生產。Environmentally friendly measures to be implemented include public transport by a railway and a smoke - free shuttle system ; implementation of an automated refuse collection system and a district cooling scheme for air - conditioning ; and use of tunnel and depressed roads to promote pedestrianisation
區內擬設置多項環保設施,包括以鐵路及無煙環保穿梭運輸系統作為公共交通工具;採用自動垃圾收集系統及區域水冷空調系統;使用隧道及路塹式道路,並廣設行人專用區等等。Based on construction practice of explosive compaction of deep water rubble - mound foundation for a breakwater, this paper mainly analyses the impact on rubble - mound foundation, neighborhood area and security when explosive compact, and studies the measures of how to control the bad impacts and impose the good ones
摘要結合某防波堤工程的深水基床爆夯施工實踐,對深水基床爆夯施工過程中對基床、相鄰區域及安個影響進行分析,探討了如何有效控制各種影響、趨利避害。Carry out regularly safety checks and safety audits on all construction areas in nanjing site
負責對瓦克南京現場所有施工區域進行安全檢查和稽核。There are many sorts of the modern dredgers, to adapt the various working regions, and soil conditions etc. it is inevitable to select to build the large self - propelled trailing suction hopper dredgers for shanghai channel bureau, because of the developments of the big - scale ports and channels at home and abroad, and the bad working conditions offshore, and the business direction
現代挖泥船有各種類型,它們適用於不同的施工區域與土質等工況條件。世界與國內港口航道的發展愈來愈體現出規模大,向外海推進和施工條件惡劣的特徵,從上海航道局的企業經營定位出發,建造大型自航耙吸挖泥船是首選方案。When used as an emergency tripod, it is very easy to set up by applying same method as using an umbrella
它可以在夜間施工區被用作告警燈,或在汽車事故區域進行警示。分享友人