施工人 的英文怎麼說

中文拼音 [shīgōngrén]
施工人 英文
constractor
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. Factors influencing early physiological acclimatization of the construction workers re - entering plateau after winter vacation

    再入高原施工人群早期生理習服的影響因素
  2. Coach constructors and provide constructive suggestion to enhance performance

    指導施工人員,提供有建設性的信息以提高其作成績
  3. Conduct necessary safety orientation for all field management and workers

    對項目現場管理和施工人員進行必要的安全培訓。
  4. Abstract : because the water - binder ratio of both high strength concrete and high performance concrete are very low, it bring about the following consequences such as : 1, the grade of cement strength would be a negligible symbol 2, the effectiveness of mineral admixture would be considerably improved 3, the high cohesion of the mixture and concrete " s shrinkage and creep would be changed etc. all these consequences should be well deliberated by the construction circles

    文摘:高強混凝土和高性能混凝土因其水膠比都很低,給配製與帶來如下現象:水泥標號的「標志」作用淡化,礦物摻合料的作用顯著改善,拌合物的高粘聚性、混凝土的收縮和徐變性能的變化等,這些現象都值得施工人員注意。
  5. Abstract : the paper has introduced the building technology of the replacement of compensation device and the contact wire in the course of the existing railway - speed - increasing catenary device rebuilding, as a reference to the builder

    文摘:介紹了既有線提速接觸網設備改造中更換補償裝置及接觸導線技術,供從事施工人員參考。
  6. For those who work on the site, bridging is hard in other ways.

    在其它方面,對現場施工人員來說,架橋則是一項很艱苦的作。
  7. Packaging is now receiving more attention by both packaged-device vendors and system builders.

    現在封裝越來越受到成品器件的銷售員以及系統的施工人員兩方面的更多注意。
  8. This lift is only for construction personal

    僅供施工人員使用
  9. Communicates with constructors and maintains good relations

    施工人員進行交流並且維持良好的關系。
  10. Builders hoists for persons and materials with vertically guided cages

    帶立式引導罐籠的施工人員和物料升降機
  11. Provide demonstration of product application to the targeted applicator on jobsite

    地上目標施工人員提供產品的演示。
  12. Initiate and maintain the relationship with targeted applicator via daily on - site follow up

    通過現場跟蹤建立並維持和目標施工人員的聯系。
  13. Aluminium constructions under predominantly static loading - part 3 : execution and qualification of constructors

    靜荷載為主的鋁結構.第3部分:施工人員的職能履行和資
  14. Standard specification for nuclear facility transient worker records

    核設施工人瞬時記錄
  15. For a specific project, the construction cost of the project can be reasonably and scientifically analyzed and estimated by means of the reasonable planning for the resources allocation adaptable to the project made through the economic assessment on the conduction process ; by which the cost control indexes can be determined, the relevant internal checking mechanism and the budget system for construction cost control can be established, and then the avoidable measures for possible economic risk can be made as well, so as to obtain the benefit indexes adaptable to all the specific items to realize the management of the construction cost control for the whole construction process and build up the scientific and reasonable system of economic responsibility for making a basis for completing the project with better quality effectively, economically and reasonably

    摘要通過項目的過程經濟評佑,制定出適應程項目的合理資源配置計劃,對具體程項目的成本進行合理、科學的分析判斷,確定成本控制指標,建立成本控制內部考核機制和成本預算制度,找出具體子項的經濟風險源所在,建立相應的經濟風險規避措,獲取適應每個具體項目的利潤指標,實現程項目全過程的成本控制管理並建立科學合理的經濟責任制,以便調動項目部所有施工人員的創造性和主動性,為最終高效、經濟合理、保質保量地完成任務奠定基礎。
  16. Owing to supply by stated length, in the process of installation, the length of toe plate after fixed maybe inconsistent with length of platform, which require installer cut to use on site

    由於踢腳板是按一定的長度提供的,因此,在踢腳板的安裝過程中,有可能踢腳板連接后的長度與平臺長度不一致,這就要求施工人員在現場截取。
  17. It must pay attention to the marble s thickness when the master worker use the spatula ( it is different for the marble s thickness ). please the master worker use different toothlike

    使用抹刀需注意石材的厚度(不同石材厚度會有差別) ,要使用不同鋸齒的抹刀,才不致泥漿浪費、不足或不均,請施工人員特別注意
  18. By translating autocad files into maplnfo format files and using cis technique for linking information, building technicians visually acquire all kinds of quality control information, easily carried out the control in advance as well as under construction, greatly improve construction project quality, therefore avoid project quality defect as possible as they can

    將目前設計院常用的autocad圖形文件轉換到mapinfor平臺上,利用gis技術使質量控制信息附著在該圖上,施工人員可以方便地獲得各種質量控制信息,從而更好地實行了事前、事中控制,顯著提高項目質量,減少質量事故的發生。
  19. At about 4 yesterday afternoon, construction workers cautiously removd the damaged beam. at 5 : 50, traffic was returned to that section of the street

    昨日下午4時許,施工人員小心翼翼地將撞損橫梁取下。 5時50分,該路段恢復通行。
  20. Where delivery of the project is delayed due to such repair, re - construction or alteration, the constructor shall be liable for breach of contract

    經過修理或者返、改建后,造成逾期交付的,施工人應當承擔違約責任。
分享友人