施工結束 的英文怎麼說

中文拼音 [shīgōngjiēshù]
施工結束 英文
construction completion
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ動詞1 (捆; 系) bind; tie 2 (控制; 約束)control; restrain Ⅱ量詞(用於捆在一起的東西) bundle;...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 結束 : finish; closure; foreclosure; end; terminate; conclude; wind up; close; come to an end; come to a...
  1. This paper researches the basic statistical rule of oil - gas dynamic system from the systematic theory, combining with the common characteristic and structure characteristic of oil - gas dynamic system, taking the design requirement of oil field development programming into consideration, by using of functional simulation principle ( including nn method, differential simulation method ) and historical data of oil field, establishes the in - out conjunctional relationship of dynamic index of oil field development, and researches the two level index prediction of development dynamic with both oil field and oil production plant on the basis of the in - out conjunctional relationship. furthermore, this paper analyzes the " decision - making variable ", " object " and " restriction terms " by the optimization theory and set up several optimal models which compose the oil field development programming, it is following : optimization model of the production composing ( solving the optimal composing of each subentry production and cor responding cost, workload, including the onshore thin oil production, the heavy oil thermal process production, tertiary oil recovery production, and the offshore production ) ; optimization model of measure production structure ( determining the optimal composing of each measure production and measure workload, which is composed of fracture, acidulation, capital repair and so on ) ; optimization model of the production distraction ( optimal distribution of the whole oil field production to each oil production plant ) and the integrated development programming model of oil field

    本文從系統理論出發研究油氣動態系統基本統計規律,合油氣動態系統的一般特點,構特點,兼顧油田開發規劃設計的要求,利用功能模擬原理(含神經網路方法、微分模擬方法) ,依據油田歷史數據,建立了油田開發動態指標間的輸入輸出關聯關系,並在此輸入輸出關聯關系的基礎上研究了油田及採油廠兩級的開發動態指標預測,同時利用最優化原理,在分析「決策變量」 、 「目標」及「約條件」的基礎上建立了多個構成油田開發規劃的「優化模型」 ,這些優化模型包括:產量構成優化模型(解決陸上稀油產量、稠油熱采產量、三次採油產量、海上產量及對應的成本、作量的最優構成問題) ;措產量構優化模型(解決壓裂、酸化、大修等各項措產量及措作量的最優構成問題) ;產量分配優化模型(將油田的產量最優地分配到各採油廠)以及油田綜合開發規劃模型。
  2. And. the test research on the restrained beams strengthened by epoxy - glued cfrp which is glued in term of different angle is presented. based on the test of shear strengthening by cfrp - bonded, qt. ality control standards of the design and construction is established

    作者對cfrp加固用材料性能、構受力特徵進行了系統的論述,對按不同角度粘貼cfrp加固的約梁進行了試驗研究,得到大量數據,並在試驗的基礎上,得出了有關的構造要求、錨固要求等設計質量控制條件。
  3. This year in march, wu qidi of ministry of education ' s undersecretary teachs master major in the whole nation degree education coachs committee changes a congress to go up announce : degree of educational master major ends smoothly in the pilot job of our country, turn to carry out level formally

    今年3月,教育部吳啟迪副部長在全國教育碩士專業學位教育指導委員會換屆大會上公布:教育碩士專業學位在我國的試點作順利,轉入正式實階段。
  4. The research object in this text is a project of the real estate in the chengdu city from the new vision. the project of the real estate is divided into four stages : concept stage, developing stage, performing stage and last stage. the main content of the project management in the concept stage is how to organize the feasibility test well. the main of the project management in the developing stage is how to organize man, material, finance and how to be ready for all the soft and hardware. the main content of the project management in the performing stage is how to guanatee quality, cost and time planning. the main content of the project management in the last stage is how to evaluate, check and accept, deliver the project and organize the last work well. confronting the present situation in all the stages, i work out some good measures. it is about to think the real estate project management farther in the last chapr. er. i bring out xhe important principle about the project management of the real estate and several question which must be delt with. comprehensively evaluating and perfecting the project management in the whole stages is all contents that the project management has the whole efficacy

    本文以全新的視角,以成都市一個房地產開發項目為研究對象,創新性地把房地產開發項目劃分為四個階段:概念階段;開發階段;實階段;收尾階段。概念階段項目管理的主要內容是組織好可行性論證;開發階段項目管理的主要內容是組織好人、財、物及一切軟硬體準備;實階段項目管理的主要內容是保證質量、進度、成本;收尾階段項目管理的主要內容是評審、驗收及項目交付和組織作。針對不同階段的項目管理的現狀分析,提出完善的對策方案,最後是對房地產開發項目管理的進一步思考,提出房地產開發項目管理的關鍵性原則及應處理好的幾個問題。
  5. July, the evaluation of lucent global science scholars programme implemented by csc is completed. 5 students are granted the awards. they are liu jiaping from shanghai jiaotong university, li ying from fudan university, zha xinyan from nanjing university, li bin from xi an jiaotong university and zhang jingbin from zhejiang university

    7月,由國家留學基金管理委員會負責實的2002年度"朗訊科技全球優秀學生科技獎勵計劃"在中國大陸地區的評選,上海交通大學劉佳平復旦大學李瑩南京大學查欣焱西安交通大學李彬和浙江大學張靜斌5名同學榮獲該獎。
  6. In order to simulate the construction process and the effect of concrete pouring temperature and outside temperature on temperature field and thermal stress field in the dam, temperature field and thermal stress field are calculated layer by layer. the calculation step during construction is 0. 25 day, and during operation the diffusion of hydration heat of concrete is over and elastic modulus is basically stable, changeable step is used

    為了研究進度、混凝土澆築溫度、外界溫度對壩體溫度場和應力場的影響,按碾壓混凝土方法每澆築一層(層厚0 . 3m ,澆築時間6小時)計算一次溫度場和應力場,這樣,期計算步長為0 . 25天,運行期因混凝土水化發熱已,且彈模基本穩定,故採用變步長計算。
  7. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和論如下: 1 、提出了獨塔斜拉橋與兩側剛構相連接的新型協作體系斜拉橋構形式,並對該橋的方案比選、設計思路、橋面系構形式、塔柱截面設計、深水基礎的設計及方法、協作剛構的剛度選取、塔柱的直加固等方面作了詳細地計算分析和比較。
  8. Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible

    合黃河小浪底水利樞紐程在現場進行的採用雙層雙圈環形無粘預應力鋼絞線和單圈有粘預應力鋼絞線對排沙洞襯砌混凝土加預應力的1 : 1模型試驗,對比分析了兩種后張預應力體系的優劣,歸納總了預應力筋張拉過程中預應力混凝土壓力管道構管壁混凝土的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析果的一致性,確定了預應力混凝土壓力管道理論計算方法的可行性。
  9. Then, the continuous beam bridge cad system is taken as a real example, to analyse the system structure including the layout, data requirements, procedure diagram of the sub - systems such as beam calculating and modeling, construction simulating, structure analysis, result output, pre - stressed tightwire layout, general tightwire layout, design graphic plotting

    然後,以「連續梁計算機輔助設計系統」為實例,詳細分析了該系統的整體構,以及梁部計算模型生成子系統、過程模擬子系統、構分析子系統、計算果審核和文本輸齣子系統、預應力鋼布置子系統、普通鋼布置子系統、設計圖表子系統的層次構、數據需求和處理流程。
  10. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特大橋程實踐為背景,以主拱研究為主線,對鋼管混凝土拱橋重難點藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋過程中內力的計算,確定了拱肋最不利荷載況下加載重量、壓重順序和張拉臨時預應力等一系列,並將計算果與現場監測觀測數據進行了比較分析,為今後進一步研究這類構提供了參考。
  11. Whether the control progress of the project is effective, it will decide the final benefit of society and economy on the protection. however, it ' s the key of the success or failure whether we could valid and accurately fix the control goal and effectively command the project according to it during the project implementation. in the light of cybernetics, a works project is a goal system composed of many goals and inherent interaction, among which cost, progress, quality are three essential goals

    本文將程項目管理的理論方法應用於數控銑床的改造項目,此項目在實過程中採用程項目管理的控制論方法進行全面控制,進行了項目成本的概預算以及項目實中的各階段控制,在滿足要求的基礎上不斷完善;採用邀請招標的方法,確定最終技術方案,簽訂技術合同;針對項目的具體情況進行了項目進程式控制制,使項目的周期縮至最短;採用全面質量管理對項目的質量進行控制,使之達到預期的質量目標;對項目的成本控制是此次項目最基本、最關鍵的,也是最難點,從招標到項目,成本控制貫串始終,最終對項目需要驗收的內容進行檢驗。
  12. On the basis of supplying the thought of chain management in construction enterprises, considering material purchase, transportation, stock of management, the stock control and optimized models had set up

    摘要基於供應鏈管理的思想,合建築業企業生產的特點,考慮材料庫存管理過程中受采購、運輸、生產消耗的約,建立了庫存管理優化模型。
  13. 15 " time for completion " means the time for completing the execution of and passing the tests on completion of the works or any section or part thereof as stated in the contract calculated from the commencement date

    15竣時間是指合同規定從程開日期算起到程或其任何部分或區段施工結束並且通過竣檢驗的時間。
  14. While the closure of our private sector portfolio marks the end of one important aspect of our work in china, the legacy of the private sector development programme will live on in deepening collaboration with the international poverty reduction center in china

    私營部門發展項目的意味著我們的作在中國方面的一個重要領域已經畫上了句號。然而,私營部門發展項目的實所帶來的成果將通過與中國國際扶貧中心的深入合作永遠持續下去。
  15. This original presents the universal insulation materials and the general testing and evaluating method for pipelines " insulation of the thermodynamics power generating plant ; performs the insulation testing and evaluating of the high temperature steam pipelines of longfeng heat and power plant ; takes composite structural research on the high temperature steam pipelines, and establishes the relevant optimizing physical and mathematical model of the insulation layer, confirms the constraint and boundary condition, carries on optimizing design for the thickness of insulating layer ; in order to more systematically analyzing the present situation of insulation of the installation and pipelines of longfeng heat and power plant, develops a suit of software namely " the information associated decisive system for the insulation project ", taking advantage of this software can achieve. the design, evaluation and direction to building for the insulation project, examine the criterion of design and building, the perform ance and manufacture data of different insulation material, which is convenient to the selection of insulation material

    在進行保溫構優化的過程中,主要是針對高溫蒸汽管道進行復合構研究,並建立相應的物理及數學模型,找出其約條件和邊界條件。同時為了更加系統地對龍鳳熱電廠設備及管道的保溫現狀進行分析,開發了一套「絕熱程信息決策系統」軟體,利用該軟體可以實現絕熱程的設計、評估及指導,並可以查閱設計及標準、各種絕熱材料性能和生產廠家的資料,便於絕熱材料的選擇。該套軟體的設計填補了國內空白,避免了絕熱程改造、設計及過程中的無序現象,規范了絕熟程市場,從而為我國絕熱程的選材、設計、及管理提供科學依據。
  16. All wholesale fish markets are thoroughly cleaned immediately after close of trade with empty containers and refuse removed. petroleum oil is applied to drains to prevent breeding of mosquitoes

    魚類批發市場作人員在批銷活動后,隨即進行徹底清潔作,清理空置的容器和垃圾,亦在排水道用蚊油,防止蚊蟲滋生。
  17. Simulates the interaction between pile and earth during the processes of the whole construction in the protecting landslide and the slope condition is worsened later

    程序中模擬了邊坡治理的整個過程以及施工結束后邊坡條件惡化過程中的樁-土相互作用。
  18. This paper discussed about the changes of stress state on effect of soil properties. the reason of surface settlement and layer losses is that the stress state is not primeval one in and after tunneling construction. therefore it is necessary to select strength data in actual stress path in making tunnel deformation and stability analysis with continuous media mechanics

    本文討論了隧道過程中,由於應力狀態的變化對土性的影響, ,隧道之所以造成地表沉降和地層損失,是因為隧道過程中以及隧道施工結束後土層的應力狀態已經不是原始應力狀態,因此在選用連續介質力學方法對隧道進行變形和穩定性分析時,必須採用實際應力路徑下強度參數。
  19. It is agreed and understood that the insurers shall only indemnify the insured for loss, damage or liability directly or indirectly caused to construction plant, equipment and machinery by flood and inundation if after the execution of works or in case of any interruption, such construction plant, equipment and machinery are kept in an area not endangered by 20 - year floods

    茲經雙方同意,只有在被保險人將施工結束后,或任何中斷時的用機器放置在最近20年未遭受洪水或水災侵害的地方的情況下,本公司對被保險人因洪水或水災直接或間接造成用機器的損失及由此產生的責任負責賠償。
  20. Using the finite element method ( fem ), the simulation and analysis on this construction process were carried on, and the different stress state of soil at different construction period was rendered. and the influence of different stress paths ( foundation excavation - unloading & excavation filling - reloading ) on the stress and the displacement was also reflected and researched. the law of non - linear constitutes of soil was presented in the simulation and analysis

    模擬分析再現了土體的非線性本構關系,得到了基坑開挖時土體變形和應力變化的一般規律;在基坑及上覆土體回填時,通過分層填築的有限元模擬和地基、涵洞、土體三者相互作用的有限元分析,得到施工結束太原理大學碩士學位論文時的位移場和應力場,同時求得涵洞的構內力。
分享友人