施工經理 的英文怎麼說

中文拼音 [shīgōngjīng]
施工經理 英文
construction manager
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 經動詞[紡織] (把紡好的紗或線梳整成經紗或經線) warp
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 經理 : 1. (經營管理) handle; manage2. (企業負責人) manager; director
  1. Hangzhou hing kwok - ting electronic intelligence engineering limited, established in 1995, the company has more acoustic experts, rich experience in the construction works, long in the field of architectural acoustics and audio video systems design optimization

    杭州興鼎電子智能化程有限公司,創建於1995年,公司擁有多名聲學專家,有著豐富的驗,尤其擅長于建築聲學的設計及音視頻系統的優化處
  2. 3. combining with field constuction, the factors influencing the construction quality of cement power - sprayed piles are analyzed, and the often - occured quality defects are discussed. then the author puts forward the constructive measure for coping with the quality defects

    結合現場實際,對影響粉噴樁質量的因素作了分析,並對常出現的質量問題作了探討並提出了
  3. The contractor ' s workforce will not be allowed to commence work on site until all certification has been presented to the construction manager or his nominee

    在承包商未向施工經理或其指定人提供所有資質證件前,承包商隊伍不得開展任何現場作。
  4. All mobile equipment when first arriving at the site must be inspected by the construction manager or his nominee and carry current state certification if required

    所有移動設備首次抵達現場時,必須由現場施工經理或其指定人進行檢查。並且,在需要的時候,應攜帶所需檢查設備的現行申明證書。
  5. All contractors ' equipment when first arriving at the site must be inspected by the construction manager or his nominee and carry current state certification if required

    所有承包商設備首次抵達現場時,必須通過施工經理或其指定人的檢查。並且,如果需要還需要檢查承包商所有的現行作業證書。
  6. It shall be the responsibility of all contractors, sub - contractors and their employees to observe statutory regulations and safe working practices as well as any further instructions issued by the construction manager or his nominee

    「承包商」 、 「分包商」及其雇員有責任遵守法規和安全作技術規程,以及「施工經理或其指定人」發出的進一步指令。
  7. Before doing any work where there is a danger of coming into contact with electric wires or collector rails arrangements must be made for access with the construction manager or his nominee

    在存在接觸電線或電器軌道危險的地區進行作之前,必須和《施工經理》安排設置通道。
  8. Minimum 2 international industry project experience on pm or cm ' s role in epcm contractor or construction contractor ' s team

    作為施工經理或者項目程公司或者承包商的團隊中,參與過2個以上的國際程項目。
  9. No excavation shall be started nor any peg or spike driven into the ground until an excavation permit has been granted by the construction manager or his nominee in accordance with the excavation permit procedures

    在取得「施工經理」根據《開挖許可》程序,給予許可以前,不可進行開挖,也不得向地下打入短樁或大釘。
  10. Combining with the project example, this paper made some studies on the foundation underpinning and structure stabilization technology, covering the theoretically discussion, and design innovation, and advanced technique ' s application and dissemination and the summary of construction experiences, etc., in order to provide reference for similar project in the future

    本文結合程實例,擬就獨立柱基礎托換及結構加固技術進行論上的探討、設計方面的創新、先進技術的推廣和應用、驗的總結等各方面的研究,為同類程提供一些可借鑒的驗。
  11. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象論為基礎,根據高層建築超厚底板大體積混凝土承受的溫差主要是均勻溫差和均勻收縮的特點,闡述了大體積混凝土溫度應力論計算的簡化方法和最大整澆長度的計算方法,同時根據大體積混凝土溫度收縮應力基本公式和大體積混凝土結構驗,提出了防止大體積混凝土溫度裂縫的五項技術措。最後本文以廈門郵電大廈3 . 5m超厚底板為實例,從大體積混凝土溫度應力計算、混凝土保溫材料厚度計算、混凝土配合比的確定,鋼筋程、模板程、混凝土的泵送和澆築以及大體積混凝土內部溫度的監測和後期養護等方面進行了論應用。
  12. On the basis of the project practice, in light of the basic methanical principles of tunnel, it is profoundly analyzed that dynamic state of strata, construction design, methods, technology and administration ( including measurement ) related to buiding subway station in this dissertation, which provedes grounds of argument and evidences in therory, technology and economy

    在實踐的基礎上,本文結合隧道力學基本原程實績,對「暗挖逆築法」的地層動態、結構設計、方法、技術及(包括量測)等進行了較為詳細地分析和研究。為建立該方法從論、技術和濟上提供了依據和論證。
  13. Construction supervision experiences of complicated underground projects

    復雜地下
  14. Inspecting on - site progress and reporting to pe or cm on a daily basis, making progress photos on a weekly basis

    每天檢查現場進度,並匯報給項目程師或施工經理,每周拍下進度照片。
  15. Before stacking any material the contractor must consult the construction manager or his nominee for allocation of a stacking area

    《承包商》堆放材料前,必須事先詢問負責材料堆放場地分配的《施工經理》 。
  16. Advise ipmt construction director and contractors ' construction managers on best practice and hse program developments

    為烯烴項目一體化管組的主任和承包商的施工經理就如何制訂最佳的慣例和hse計劃出謀劃策。
  17. Advise ncpp ipmt construction director and contractors ' construction managers on best practice and hsse program developments

    為寧煤烯烴項目一體化管組的主任和承包商的施工經理就如何制訂最佳的慣例和hsse計劃出謀劃策。
  18. Technology of slope protection was also researched. proper construction steps of geogrid reinforced embankment and geogrid overlapped are given

    通過對試驗路驗的總結和分析,提出了土格柵加筋路堤的合流程和反包藝。
  19. Participating in trade specific risk assessment review for trades or systems under your responsibility, development of a swms for all work activities, and trade kick off meetings for trades under your responsibility, attending contractors ' daily “ toolbox talk ” safety meetings and other eh & s training as directed by the construction manager, partly reviewing subcontractor ' s eh & s plan and follow safety documentation process

    施工經理的指導下,參加在你負責的包段或系統包段具體的危險評估審查,編制安全作方法陳述,以及出席所負責包段的開會議,出席承包商每天的「具箱安全會議」和其他環境、健康和安全培訓,部分審閱分包商的環境、健康和安全計劃並遵從安全文件上的程序。
  20. 3 days prior before any heavy ( 75 % of the max. allowed working load ), duel, or long radius lift or a lift in close proximity to power lines a detailed job safety analysis ( jsa ) must be submitted to the construction manager or his nominee

    在進行重物(最大提升負荷的75 % ) 、採用2臺起重機同時進行起重提升,或在起重機距離貨物較遠,或距離動力線較近的地方進行提升時,必須提前3天向現場施工經理或其指定人遞交一份詳細作業安全分析報告。
分享友人