施工進度計劃 的英文怎麼說
中文拼音 [shīgōngjìndùjìhuà]
施工進度計劃
英文
detailed construction schedule; construction schedule- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 進 : 進構詞成分。
- 度 : 度動詞[書面語] (推測; 估計) surmise; estimate
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 劃 : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
- 施工 : be in the process of construction; be under construction; build; construction
- 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
- 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
-
Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls
論述了三峽大江截流及二期圍堰實施過程中的施工進度計劃、料場規劃與土石方平衡、截流方式與圍堰斷面形式、截流進占程序和時段、防滲形式、防滲墻施工等主要技術問題的優化完善過程Assembly plan should cover : calculation on amount of members and joints, assembling equipments ' choosing, assembly flow sequence, assembly method, progression plan, personnel management, steel members mobilization, quality standards, safety measures and special construction techniques
編制的組織設計的內容應包括:計算構件和連接件的數量,選擇吊裝機械、確定流水程序、確定吊裝方法、制定進度計劃、確定勞動組織、規劃鋼構件進場、確定質量標準、安全措施和特殊施工技術等。The author uses the technique of generalized network plan and the key line methods to divide the boiler installation item and build configuration model, adopts the p3 in the building pingliang power plant project to realize the dynamic management of this installation plan, and give news of the project schedule, plan and material to the power plant by the computer network to help the manager
本文作者應用廣義網路計劃技術和關鍵線路法對鍋爐安裝項目進行作業劃分和建立結構模型,並通過p3軟體在平涼電廠在建工程中的應用,實現了安裝工程計劃的動態管理,並通過計算機網路向電廠發布電建工程的施工進度、計劃、材料等方面的信息,為管理層提供了詳實的管理數據。The main parts of this paper is now be showed in the following : 1 ) the development for the compiling of the schedule had been finished 2 ) the realization of the management function for the schedule system, the base managements can be processed with the management tools. 3 ) the data taken and expressed from the drawing layout system, in the schedule system. 4 ) the data transfer from the schedule system to the drawing layout system
本文的研究工作主要包括以下幾個方面: 1 )適合電廠工程的進度計劃編制功能的開發完成; 2 )實現電廠工程的施工進度計劃管理功能,可以利用施工進度計劃編制系統的管理工具對施工進度計劃進行基本的管理; 3 )實現在施工進度計劃定製系統中對施工平面布置系統中的數據的讀取和表達; 4 )完成施工進度計劃數據向施工平面布置系統的傳送。Basis " urban commodity house opens to booking administrative measure " ( 2004 edit ) regulation, commodity house opens to booking ought to accord with the following condition : 1, already pay is full gold of land access sell one ' s own things, obtain land access letter ; 2, licence of program of hold construction project and construction permit ; 3, by offer the commodity house calculation that open to booking, the capital that devoted development builds achieves the 25 % above that project always invests, had fixed construction schedule and complete due date
根據《城市商品房預售治理辦法》 ( 2004修訂)的規定,商品房預售應當符合以下條件: 1 、已交付全部土地使用權出讓金,並取得土地使用權證書; 2 、持有建設工程規劃許可證和施工許可證; 3 、按提供預售的商品房計算,投入開發建設的資金達到工程建設總投資的25 %以上,並已經確定了施工進度和竣工交付日期。The floodgate dam is completed more than 6 months ahead of time in the original piano it can generate electricity about 500 million kw ahead of time, convert about 100 million yuan. 4
3 .通過溫控研究,簡化了溫控措施,加大了澆築尺寸,加快了施工進度,閘壩竣工比原計劃提前了6個月。The paper discusses accelerating the construction schedule and shortening the time limit for a project
本文對建築施工組織中來用先進施工技術的進度計劃后如何縮短施工工期問題進行了探討。5. the project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit
5 .進行了完工概率分析,較好地描述了施工進度計劃的不確定性,為施工工期論證分析提供了依據。The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure, computer simulation is applied to produce the most possible scheduling network. and by corresponding optimization and adjustment on the network, the cost and scheduling construction network can be obtained ; during the practical construction according to the network, the warp between the actual cost and expected scheduling is tracked dynamically. then the computer simulation system is used to predict the future cost and progress operation, and take corresponding precautionary measures to control beforehand
其主要思想與步驟為:首先運用計算機模擬技術來模擬工序作業時間的隨機特性,產生概率最大的施工網路計劃,並對其進行優化和調整,以獲得滿足工期、質量要求的成本及網路計劃;在施工過程中動態跟蹤施工實際成本與進度與目標計劃所發生的偏差以及質量問題,然後根據已出現的偏差,利用計算機模擬技術對項目未實施部分進行進度、成本的預測和分析,根據現有信息對網路計劃未完成部分進行調整和優化,以盡可能把各項費用控制在預定計劃成本之內或使工程的綜合指標最優。The key to the time control of newly - built projects is to fix project ' s general control task time and stage control task tine, and break them up to the time plan to realize the project ' s early operation and benefit achievement ; the time control should aim at practicing the plan but not affecting the project ' s annual irrigation plan, by working out plan, following up the construction and timely error correcting management to make sure the achievement of project ' s task time
新建項目的施工進度控制的關鍵是要合理地確定項目總控制工期和階段性控制工期,並將其分解落實到進度計劃中,以實現工程及早投運、及早發揮效益的目標;更新改造項目的進度控制則要以進度計劃的落實不影響工程的年度灌溉計劃為目標,採取合理制定計劃、跟蹤施工、及時糾編的管理辦法,確保項目工期目標的實現Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control, the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program, cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method, factor estimation method, wbs estimation method and comparison estimation method, the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation. meanwhile, comprehensive quality management theory is introduced in the project " s schedule program. aiming at subsidiary project bidding, equipment purchase, essential quality inspection, detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep
( 3 )針對川塔項目施工建設具體需要,在充分體現項目事前規劃與全面控制相結合管理思想和所進行的項目wbs結構分解基礎上,基於項目進度? ?費用成本? ?質量三者之間的關系,提出了基於cpm關鍵路線法的川塔項目進度計劃制定方案,實現了進度規劃與控制的緊密結合;在對比分析經驗估演算法、因素估演算法、 wbs估演算法、類比估算等方法和技術基礎上,制定了側重於預算的川塔項目成本基本規劃方法,以及結合市場經濟情況的成本控制策略;同時將全面質量管理思想,引入了項目施工方案中,針對子項目招標、設備采購、重點質量監控點等設立了詳細的質量保障機制和細則,以確保達到工程優質建設的目標。Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated
論文重點闡述了通過縮短測量劃線、鉆眼、裝藥爆破、通風排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用鉆爆法施工充分利用隧道空間,合理配備人力、機械,隧道開挖施工進度得到提高的可行性。Scheduling for construction under fixed risk probability
基於一定風險水平的施工進度計劃研究For the elevation of the scientification and rationality of the construction organization designment and construction management in the modern construction projects, an computer aided design system of integration of construction schedule and layout drawing has been researched and developed in this paper. with this cad system we can realize the layout of the drawings and the compiling of the construction schedules separately, and also this system can used to exchange the data between the two separate systems, and then they can express each other
為了提高現代建築工程項目施工組織設計和施工管理的科學性和合理性,本文以電廠建設工程項目為例研究和開發了集成化的施工進度計劃和施工布置的計算機輔助設計系統,利用該系統不僅可以獨立的實現施工布置和施工進度計劃的編制,而且可以利用開發的自定義文件進行這兩種系統的數據交流和表達。Based on practical engineering experience, a suit of template for project scheduling system including the commonness of different engineerings has been customized. in addition, some special functions have been added to it. they are the updating of the completion of tasks, the relationship with the construction ration, data exchange between the scheduling system and the layout system of the drawings and the picturing of the earned curve, etc. besides, the project database has been designed in accordance with the theory and criterion for database design
本文根據現場工程經驗,總結不同工程中存在的共性,在project2000基礎上定製開發了電力安裝工程施工進度計劃模板,並且在該模板上增加了一些其特有的功能,包括:任務的更新,與施工定額相聯系,與施工平面布置圖中數據的交互以及利用贏得值原理繪制贏得值曲線等。Detailed construction schedule ; construction schedule
施工進度計劃In the end, an evaluation system has been developed according to the cascade analytical method in order to make a scientific evaluation to the construction scheme, the project scheduling and the layout system of the drawings
最後,本文利用層次分析法,開發了施工組織設計評價系統功能模塊,從而對施工方案、施工進度計劃和施工平面布置圖的確定做一個科學的、量化的評價。This database is the core of project management and information management, realizing data exchang among the scheduling system, the layout system of the drawings and the information management system on site
此外,本文還設計了工程項目數據庫,作為工程項目管理和信息管理的核心,實現工程項目管理的各個模塊,施工進度計劃、施工平面布置圖和施工現場信息管理之間數據的交互。The construction processes of large - scale underground structure group are very complicated. in order to quicken the construction processes, reduce price and assure success, it is necessary that adopting scientific system simulation method to simulate the whole construction processes, to make all tunnels, all activities and all machine equipment harmonious and make construction sequence schedule reasonable
大型地下洞室群施工過程是極其復雜的,採用科學的系統模擬方法對地下洞室群施工全過程進行模擬,使各洞室、工序及施工機械設備相互協調配合,使洞室群施工順序和施工進度計劃更加合理,對于加快洞室群施工進度,降低工程造價,保證工程順利進行非常必要。Aim at the character of process implementation of ve, the dissertation combines the project management with workflow management tightly. it uses the project dissolution and task programming method to plan the project implementation schedule, uses workflow management system to allocate the task and watch the schedule of process implementation, and it also executes the task by project control and workflow adjusting
本文針對虛擬企業過程實施的特點,將項目管理同工作流管理有機地結合起來,利用項目管理中的項目分解方法和任務規劃方法制定過程實施的進度計劃,利用工作流管理系統進行任務的分派並監控過程實施的進度。分享友人