施工荷載 的英文怎麼說

中文拼音 [shīgōngzǎi]
施工荷載 英文
construction loads; working load
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 荷名詞(蓮) lotus
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡擋墻、地表排水、整坡填縫、生物防護等多種程措優化組合而成。治理后,在飽水有地震狀態下滑坡的安全儲備系數為1 . 10 。
  2. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承力確定存在的問題,進行了5根試樁的靜試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承力的影響程度;地下水對樁承力的影響程度;各種外部因素影響下,樁的藝對樁承力的影響程度;通過在樁體周圍土中注漿對樁承力的影響程度。
  3. The dynamic characteristics of wharf piles subjected to lateral load is analyzed, used the dynamics theory. it gives an analysis and research to the functional mode of wharf foundation pile under flood tide torrent

    論文對水平下碼頭基樁的動力特性進行分析,用振動力學理論對碼頭中的基樁進行動力分析。
  4. Based on the close analysis of the influence factors of the vertical bearing capacity, circular aperture extension theory is employed to establish the computing formulas for the pile vertical stress and the foundation vertical bearing capacity, respectively. moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. then, the variation of the pipe deformation with loads, the deformation coordination of pile and soil are studied

    在此基礎上深入探討了旋噴樁的樁土受力特性及其復合地基的加固機理,從影響旋噴樁復合地基豎向承力的因素入手,基於圓孔擴張理論給出了樁體豎向應力及旋噴樁復合地基的豎向承力計算公式;通過對噴射漿液、噴射壓力選取、噴射直徑估算、樁長及樁位設計等各種計算參數的深入分析和研究,提出了一套相應的旋噴樁復合地基設計計算方法;通過計算分析,深入探討了旋噴樁復合地基變形隨變化規律、樁和樁間土變形協調關系、樁土應力比及復合地基壓縮模量的確定,並提出相應的設計方法和修正參數;此外,結合程應用,對旋噴樁復合地基的技術及其現場質量檢測方法進行了較全面的探討。
  5. The characteristics of high pressure gyratory sprayed pumping discusses is presented, which is applicable in wide range of scope and ground layers, convenient for construction, long durability, wide source of materials. mechanism for subgrade strengthening : complex foundation of cement solid and earth between piles was formed by pulsant load of flowing pressure and spraying flow, water wallop, cavitation phenomenon, water wedge effect, extrusion force and air flow agitation etc so as to enhance foundation bearing force and reduce settlement and deformation

    高壓旋噴注漿技術具有適用范圍、適用地層較廣,方便,耐久性好,材料廣闊等特點;其加固地基機理主要是通過流動壓、噴射流的脈動負、水塊的沖擊力、空穴現象、水楔效應、擠壓力、氣流攪動等效應形成水泥固結體與樁間土的復合地基,從而提高地基承力,減少沉降變形。
  6. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁藝的檢測和樁身質量及承力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承實驗表明了與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的傳遞和破壞機理、承力特性,進行了富有成果的現場測試作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  7. This paper studies the reliability of structure during the construction period based existing data and the consideration of structural resistance increasing with time, and analyzed an example, the result of the analysis shows this method is available to the analysis of the structure reliability

    在已有的鋼筋混凝土結構現場統計資料的基礎上,考慮了抗力在期間隨時間增長的特性,研究了結構的可靠度,分析了算例。
  8. Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles

    本文首先對支盤樁的基本原理進行了闡述,對其過程以及成型過程進行了描述;然後對本次抗拔支盤樁現場試驗進行了介紹,包括試驗現場地質水文條件,試驗目的、試驗方案、試驗設備以及試驗過程,並對試驗注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了樁身軸力傳遞規律以及支盤阻力和樁側摩阻力的傳遞規律,並與普通抗拔樁進行了相關對比;最後,本文提出了本次試驗尚未解決的一些問題,並對支盤樁的前景進行了展望。
  9. Abstract : the calculation method of temporary load of the continuous carrier bar with different distance span was discussed. the length calculation in design of the pressure bearing bar with the different distance span which has to be worked out can be done by means of this method , thus making the structure design in construction more accurate and convenient

    文摘:討論了不跨連續壓桿的臨時計算方法,應用該方法可以解決不跨受壓桿件設計中必須解決的長度計算問題,從而使結構設計更為準確簡便
  10. The safety factors computed from both methods were compared it was revealed that, the failure of engineering structures does not only depends on the impose load but also, on the constitute materials behavior

    同時,對大壩材料參數的敏感性也進行了分析,並比較了兩種方法所得的安全系數。結果顯示,程建築物的破壞不僅僅是由於的原因,同時也與組成材料的性質有關。
  11. The most danger place is discovered. the advices to improve the components structure are given on the basis of deform and stress distribution. ( 6 ) the modal analysis of the main frame is carried out. the method of centralized mass is made use of

    ( 5 )利用ansys軟體對主機架進行建模,根據實際情況對各種和約束條件,利用該軟體的后處理程序,分析主機架上各點在各況下的應力與變形,找出最危險點,從而對主機架結構進行改進。
  12. Firstly, for the system of moulding board and support frame in construction the side pressure and screws are analyzed. the material and structure form of support frame are discussed. the design of support frame uses the method of limited state, and also it analyses the integer stability, part stability, and single stability, and then proposes the load analysis of multi - level support frame

    首先,針對轉換層梁模體系及支撐架,重點分析了轉換層結構現澆混凝土對模板側壓力值及模板對拉螺桿的計算;討論了轉換層支撐體系的形式及構造,詳細論述了基於極限狀態設計的支撐架計算方法,包括縱橫向水平桿的強度驗算、立桿的整體穩定性、局部穩定性、單肢桿件穩定性等驗算,並提出了多層支撐架的施工荷載計算方法。
  13. 2. the random nature of load construction is analyzed. according to analyze various factors on change of reliability index, casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling, which influence on construction reliability of rigid frame bridge with high - pier and large - span, are obtained

    2 .研究了各施工荷載的隨機性,通過分析各種影響因素對可靠指標的變化程度,得到已澆梁段、分佈活、混凝土強度、風施工荷載偏差以及掛籃跌落等對高墩大跨剛構橋期可靠度的影響。
  14. Finally, theory analysis was conducted about the characteristics of three common construction loads, which are loads of self - dumping truck, tire roller and vibratory roller, and mechanical calculation models were established for three loads

    最後,通過對自卸式運料車、輪胎壓路機和振動壓路機等三種常見施工荷載特性進行理論分析,建立了三種的力學計算模型。
  15. This thesis mainly researches second - prestressing precast slabs, it is important to study its one - way slab floor ' s ability in use. specific content include : imitate construction load lab, through this method to analyze the precast slabs " properties in the first stage in burden load. one - way precast slabs " lab, analyes one - way precast slabs sandwich s ability in second burden load stage

    具體的研究內容有:模擬施工荷載試驗,即對裝配整式夾層板第一受力階段進行研究;單向裝配整體式結構的第二受力階段的性能進行研究,並分析了二次張拉預應力筋所引起的結構的變形和應變與計算結果進行對比。
  16. Construction loads ; working load

    施工荷載
  17. The emulation analysis of high building by using space structure model possessing conversion layers under constructing loads

    含轉換層高層建築施工荷載模擬分析
  18. So, the actual state of concrete filled steel tube on load is always that there is pre - stress in steel tube. these members are susceptible to the effects of pre - stress in the steel tube due to construction load

    因此,就出現了在鋼管和混凝土共同受前,空鋼管就預先承受縱向壓力(包括自重、施工荷載等) ,在鋼管中產生了初應力。
  19. On basis of this, mechanical responses of pavement structures under construction loads were analyzed, taking different construction phases of an asphalt pavement and different ages of pavment material into account. the ultimate bearing capacity was analyzed according to

    在此基礎上,分析了不同階段、路面材料不同養生齡期時,瀝青路面結構在施工荷載下的力學響應,得出了路面結構在相應條件下的極限承力,據此提出了合理的控制要求和建議。
  20. In staged construction process, study is primarily aimed at the truss load resistance capacity and flexural performance under construction and design load, combination performances of steel trusses in conjunction with concrete beam, the vertical displacement difference of two steel trusses with different span and their lateral stability, the glide displacement of the steel truss end during construction, the load resistance performance of steel trusses and concrete structure at the designed load, and the extreme limit loads and the breaking appearance of the combined steel trusses

    主要研究了在階段過程中,鋼桁架在施工荷載及設計下的受力性能和變形能力;鋼桁架與混凝土梁板的共同作性能;兩榀不等跨鋼桁架在整體受力下的豎向位移差及其對結構的作用和側向穩定性;鋼桁架端部在階段的滑動情況;使用階段鋼桁架及其端部混凝土結構的受力性能;組合鋼桁架結構的極限承力和破壞形態。
分享友人