施工調度 的英文怎麼說
中文拼音 [shīgōngdiàodù]
施工調度
英文
construction dispatching- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
- 度 : 度動詞[書面語] (推測; 估計) surmise; estimate
- 施工 : be in the process of construction; be under construction; build; construction
- 調度 : 1 (調遣) dispatch (trains buses etc ) 2 (調度員) dispatcher 3 (安排) manage; control 4 (...
-
During the period of asphaltum - concrete road construction, construction group is huge, whether the construction machines can be attempered reasonably and efficiently, then dispose kinds of unexpected changes, is the key of construction process
在瀝青混凝土路面施工過程中,施工群體龐大,能否對各施工機械進行合理的、高效的調度,快速準確地處理施工過程中出現的各種突發變化,是整個施工過程的關鍵。In conclusion, it is primarily described that the expectable social and economical benefits of this mis are great, and the design can be fulfilled smoothly. the difficulty of this thesis is : not only think about the coordination each other synthetically on workers, equipments, technologies, data and user ' s priorities, different project and different continuation day, but also must ensure that it is agility, controllable and safe when the data be transmitted on internet or intranet
本管理信息系統強調是針對無形的數據信息產品( gis等海量數據)的生產管理信息系統,不是單純的統計計算,還要實施嚴密的控制,除需要綜合考慮人員、設備、技能技術、權限、工程、工期在計劃調度統計方面的協調性外,還需要強調海量數據信息產品的原始數據、半成品、成品在網路上流動的靈活性、可控制性和安全性。Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance
通過試驗研究認為:玻璃纖維瀝青碎石的技術性能不如瀝青碎石好,但路用彈性性能較好,如能解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其路用性能仍值得探討,瀝青橡膠碎石結構層具有變形性能和抗裂性能良好,空隙率小,防水性能好,熱穩定性較好,施工工藝簡單的特點,因此,瀝青橡膠碎石是二級及二級以下公路因疲勞而開裂的瀝青路面的良好罩面材料,也是防止半剛性基層收縮裂縫反射的良好結構措施,在瀝青類路面面層和半剛性基層之間夾鋪瀝青橡膠碎石薄層,雖然造價比夾鋪土工布高,但其施工工藝,抗裂性能和防水性能均優于土工布,不僅可以大大減少半剛性基層材料的反射裂縫,延長路面使用壽命,而且可能適當減薄瀝青混合料面層的厚度,雖然初期造價有所增加,從長遠來看,具有十分重要的技術和經濟意義。Thus this thesis makes a detailed analysis on the above problems in order to solve them. through questionnaires and interviews, the paper analyses the recognition degree of the company ’ s stimulation measures and the degree of the employees ’ satisfaction as well as their incentive factors. we reach the conclusion that the staffs ’ urgent incentive factors are high income, the equability of performance assessment and allocation, and the opportunity of study as well
本文通過問卷調查、訪談等方式,對中國人壽技術與研發人員的激勵措施認知度、工作滿意度以及激勵因素等進行了調查與分析,並得出:收入高、績效考核和收入分配的公平性和更多的學習提高的機會是公司技術與研發人員需要迫切的激勵要素。Based on consider hereinbefore, this dissertation discusses several aspects on the problem of the sustainable and optimum exploitation of groundwater resources as follows : ( 1 ) reviewed entirely the origin and evolvement of the concept " sustainable development ", stated and commented the study status in queue on " sustainable development " around national and international range, thorough discussed the science connotation about the concept " sustainable development " ; ( 2 ) looked back and commented across - the aboard some furthest basic concept and proposition related to groundwater resources, put forward self opinions on a few existent mistake points of view and chaos understandings ; ( 3 ) expatiated entirely on the content and meaning of the theory of changeable groundwater resources system, contrast with the traditional methods of groundwater resources calculation and evaluation, combined example to show the application of this theory ; ( 4 ) thorough analyzed the difficult and complexity to forecast the groundwater resources, fully stated the traditional methods of groundwater resources forecasting, pointed out the characteristic and applying condition of these forecasting method, introduced the main ideas and methods of wavelet analysis developed recently, and the matlab software be known as the fifths era computer language, and its accessory wavelet analysis toolbox, applied these methods and tools to analyze the groundwater dynamic curve, adopted the b - j method and morte - carlo method, combined with the theory of changeable groundwater resources system, discussed the new view on the forecast of groundwater resources ; ( 5 ) synthetically analyzed the characteristics and limitations of the present all kind of groundwater manage model, combined mathematical programming mathematical statistics random process and the theory of variation system of groundwater resources on the unite optimum attempter of surface water and groundwater, emphasized how to make the model more nicety, more simple, more practicality ; ( 6 ) analyzed the inside condition and outside condition to assure the sustainable and optimum exploi tation of groundwater resources, the inside conditions are the follows : correct resources idea, scientific methods of resources calculation and evaluation, credible forecast methods of resources, exercisable measures of resources management, the outside conditions are the follows : the development idea of high layer, the transform of manage system, the matched policy and rule of law, the adjusted of economy lever, the improve of cultural diathesis, the boosting up of water - saving consciousness and detail measures, the control of population rising, the prevention and cure of water pollute, the renew and rebuild of ecology ; ( 7 ) scan the sustainable and optimum exploitation of groundwater resources from the high level of metagalaxy, earth system science, and philosophy ; lint out the more directions on groundwater resources
基於以上考慮,論文主要從以下幾方面對地下水資源可持續開發問題進行了比較深入的探討:全面回顧了「可持續發展」概念的由來與演變,對國內外「可持續發展」的研究現狀進行了述評,並對「可持續發展」概念的科學內涵進行了深入探討;對涉及地下水資源的一些最基本的概念和命題進行了全面的回顧和評述,對目前仍然存在的一些錯誤觀點和混亂認識提出了自己的見解;全面闡述了地下水資源變值系統理論的內容和意義,並與傳統的地下水資源計算評價方法進行了對比分析,結合實例具體說明了方法的應用;深入分析了地下水資源預測預報工作的極端重要性和復雜性,對傳統的地下水資源動態預測方法進行了全面的評述,指出了各類預測預報方法的特點及適用條件,對最近二十多年剛發展起來的小波分析技術的主要思想和方法及其應用范圍,以及號稱第五代計算機語言的matlab軟體和附帶的小波分析工具箱進行了介紹,並應用於地下水動態過程線的分析,採用時間序列中的b ? j法,蒙特卡羅方法,與地下水資源變值系統理論相結合,探討了地下水動態資料分析和地下水資源預測預報的新思路;綜合分析了現今各類地下水管理模型的特點及缺陷,將數學規劃、數理統計、隨機過程等與地下水變值系統理論相結合進行地表水地下水或多水源的聯合優化調度,使模型更準確、更實用;對保證地下水資源可持續開發的內部條件和外部條件進行了分析,內部河海人學博卜學位論文前言、摘要、目錄條件主要是正確的資源觀,科學的資源計算與評價方法,可靠的資源預測預報技術,可操作的資源管理措施,外部條件主要是高層發展思路、管理體制的變革、配套的政策法規、經濟杠桿的調節、人文素質的提高、節水意識的增強及具體節水措施、人口增長的控制、水體污染的防治、生態的恢復和重建等;從宇宙科學、地球系統科學及哲學的高度審視地下水資源的可持續開發;指出了地下水資源可持續開發的進一步研究方向。The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc
分析表明,採用將放淤閘布設在彎道上段的凹岸、彎道設置溢流堰、淤沙條渠的合理分區和科學調度等措施,可以實現試驗工程淤粗排細的目標。On the other side, the “ industry nurturing agriculture ” theory in western economics is intensively implied in lewis ’ dual economy theory and other relevant theory on agriculture, the dual economy theory dwells on the relationships between the two industries and the structure transforming entailed. later j. c. h. fei and g. ranis made further modifications on the dual theory
文章從宏觀制度及二元經濟結構等角度分析我國實施工業反哺農業所面臨的障礙,並據此有針對性的對我國工業反哺農業提出相關的政策建議,強調綜合運用制度反哺、產業反哺及技術反哺等手段促進我國反哺農業的開展及農業生產力水平的提高。At the part vault and arch foot in the tunnel secondary lining thickness, the standard difference and variance parameter is large than others, so insure the part thickness achieve design require by adjust construction craftwork
隧道二次襯砌厚度在拱頂和拱腳的部位的標準差和變異系數較大,在施工中應該考慮調整施工工藝,確保這兩個部位的厚度。Designning well tube and drill - hole diameter in order to increase thickness of both annular packing gravel and water - resisting clay, nylon net packing around well tube filters, designing filter layer on the boundary between packing gravel and water - resisting clay and ramming the gravel by working the piston into the well after gravel packing completion and the filling clay for salt - water resisting etc. we succeeded in constructing 3 drinking - water wells in minqin county, proved the affectivity and feasibility of using it and giving a certain technical demonstration of construction of drinking - water well in the same similar to this area
通過孔徑與管徑的調配設計,增大環狀粒料層和止水粘土層的厚度;濾水管外包尼龍紗網;粒料與止水粘土接觸界面上設計反濾層;填粒后先行拉活塞利用水力夯實粒料層,再投粘土球止掉上部鹹水等措施,在民勤縣三口人飲水井施工中取得顯著效果,證明了該套成井工藝的有效性和可行性,有望為同類地區人飲水井施工提供技術示範作用。The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed
摘要針對某水閘工程在施工過程中擋墻及邊墩產生的裂縫,進行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對建築物的危害程度,提出了相應的控制措施,較好地保證水閘正常運行的功能。Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force
結合丹山橋的結構特點,通過對斜拉橋施工控制及結構計算方法的探討,提出了有效的施工控制系統,實現了對實橋施工數據和技術信息的採集;通過分析理論計算與實際施工狀態的差異,確定了以卡爾曼濾波法作為施工參數識別與調整的自適應施工控制方法;通過正裝迭代法確定其合理施工狀態,並考慮混凝土的徐變效應,提出了合理的預留拱度和索力調整方案。Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed
本文緊密結合溪洛渡水電工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下洞室群圍巖穩定性的影響。In design flow modeling, a new design flow model definition method based on object oriented colorful petri net is put forward. in sub _ task dispatching, the task database, the task dispatch algorithm, the task dispatching time and its amending algorithm, the task dispatching execution plan etc. are designed. in version management, the version model of design object is built and the relationship between the linkers in dfms model and the version model about design objects is studied
在相關的關鍵技術研究中,提出了一套包括通信模型的建立、通信原語的設計、通信服務器的設計等內容在內的被動式協同設計通信方案;設計了一種基於面向對象有色petri網技術的設計流程模型定義方法;提出了一種基於調度時間和資源狀況的子任務調度方案,並完成了任務數據庫的設計、子任務調度演算法的設計、子任務調度時間及其修正演算法的設計和子任務調度實施方案的設計等工作;建立了設計對象的版本模型,研究了設計流程模型的各種連接器與設計對象各種版本間的對應關系。It is based on the above reasons, the leading system of flood, windstorm, drought control and the construction of water conservancy information engineering and the principle of theory and practicality are combined. based on the continuous development the following contents are researched in this paper : 1. the flood occurred law on major rivers and flood problems and flood control measure
正是基於這種考慮,本論文結合廣州市三防指揮系統工程和廣州市水利信息化工程的建設,本著理論性與實用性相結合的原則,從可持續發展的角度,重點研究以下內容: 1 、廣州市主要河流洪水發生的規律及存在問題與防洪措施; 2 、廣州市現有防洪措施的防洪標準與可靠性; 3 、洪水預報與調度系統的方法與技術路線; 4 、現代防洪管理。Simulation and optimization of large hpp construction : to pursue best construction proposal by optimizing theory and method and applying information technology, including layout of access, providing and allocation of construction equipment, coordination of construction progress, arrangement of resources, selection and arrangement of construciton materials to develop three - dimensional modelling and optimize the system
大型水電工程施工模擬與優化? ?根據當前水電工程施工組織與管理的現狀,通過優化理論與方法、信息技術等的應用,尋求最優化的施工組織方案,包括施工道路的布置、施工機械的配備與調度、施工進度的協調、施工資源配置、施工材料的優選、料物的優化調配等,開發工程施工三維模擬與優化系統。This thesis systemically researched construction project management with theory and way of system engineering. this thesis was based on the basic concept, basic character, main content of construction project management and mainly analyzed main question and reason of construction management. according to the total process of construction project management, it systemically researched and discussed the biding, setting up project office, project planning, object controlling ( including schedule, quality, safety and cost of controlling ), and it researched how to strengthen element management, contract management, information management, site management, organization coordinating, construction final accounts for realizing object of project management
根據施工項目管理必須經歷的過程,分別對項目管理過程中的承攬任務、組建項目經理部、項目管理規劃、項目目標控制(施工進度、質量、安全、成本的控制) ,以及為實現項目管理目標必須加強的要素管理、合同管理、信息管理、現場管理、組織協調和運行機制等作了系統的分析和研究,並通過案例進行論證。The construction processes of large - scale underground structure group are very complicated. in order to quicken the construction processes, reduce price and assure success, it is necessary that adopting scientific system simulation method to simulate the whole construction processes, to make all tunnels, all activities and all machine equipment harmonious and make construction sequence schedule reasonable
大型地下洞室群施工過程是極其復雜的,採用科學的系統模擬方法對地下洞室群施工全過程進行模擬,使各洞室、工序及施工機械設備相互協調配合,使洞室群施工順序和施工進度計劃更加合理,對于加快洞室群施工進度,降低工程造價,保證工程順利進行非常必要。4 when keeping the cement quantity and water ratio changeless, it will increase the slump constant for at least 10cm to mix into fnj l, and the concrete strength after hardening is equal to the reference concrete
2用於夏秋季節施工和大面積滑模施工。調節摻量,可有效地控制砼的凝結時間,摻量可調范圍大,塌落度損失小。After calculating and analyzing, the important index of three alternatives are obtained, such as supply water storage, losses in energy, etc. the fuzzy optimal model is utilized to evaluate and select the alternatives. according the fuzzy sets theories, the second alternative is optimal and recommended
分析工程的投入、產出,分別考慮了三個方案的引水量、引水后國內的電能損失、引水后國際的電能損失、工程的環境保護、工程投資、行業間的協調、工程施工難度等重要指標,採用模糊優選模型進行方案評價。But the stability of the side slope is very important to the construction schedule of project and the safety running of junction
而尾水渠高邊坡的穩定性直接關繫到整個工程的施工進度及日後樞紐的調度和運行安全。分享友人