最低編配標準 的英文怎麼說

中文拼音 [zuìbiānpèibiāozhǔn]
最低編配標準 英文
minimum allocation standard
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ動詞1 (編織) weave; plait; braid 2 (組織; 排列) make a list; arrange in a list; organize; gr...
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 標準 : (衡量事物的準則; 榜樣; 規范) standard; criterion; benchmark; pip; rule; ètalon (衡器); merits
  1. Minimum internal floor area allocation standard

    室內樓面面積的最低編配標準
  2. Then we define criterions including a series of software practice process and method and tools, which are also fit most of home software corporation to application software exploration and fit them to improve their software exploration engineering management before passing evaluation of cmm. the criterions we defined using a series normative process and document to engineer software exploration, which include " project management criterion ", " configuration management criterion ", " software test criterion ", " document writing criterion ", " software exploration and maintenance criterion ", ' software life cycle guide ", etc. " project management criterion " defines area and principle of software research management, which is practiced to manage the people, technology, resources, software, process and so on to improve efficiency and to ensure quality and increase income

    《項目管理規程》定義軟體研發管理的范圍、原則,通過實施該規程來對項目中的人員、技術、資源、軟體、過程等進行全方位的管理,一西南石油學院碩卜學位畢業論文以達到提高效率、保證質量、降消耗、增加收益的終目的; 《置管理規程》 ,通過實施該規程對項目開發過程中的所有資源進行控制; 《軟體測試規程》定義對軟體系統測試所用工具、過程和責任: 《文檔制規程》提供滿足國家《計算機軟體文檔制規范gb8567 》的各種文檔模板來建立統一的文檔制規范; 《軟體開發和維護規程》定義了軟體開發過程以及採取的方法和工具; 《軟體生命周期指南》 ,根據軟體項目管理的經驗,將典型軟體過程形成軟體過程模型,用於指導以後軟體周期的選擇; 《年度公司規劃》 ,對需要公司總體安排的資源統一調度的過程。
  3. Minimum allocation standard

    最低編配標準
分享友人