最大庫容 的英文怎麼說

中文拼音 [zuìróng]
最大庫容 英文
gross storage capacity
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  1. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多、多水閘)的龍口水力計算,並進行量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  2. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,閘高31m ,297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五覆蓋層,總體屬于多層復雜地基。
  3. Aim at ubiquitous parallel multi - reservoir structure in our country ' s basin, the universal objective function including coefficient bi embodying a spatial significance difference at different flood control points and variable ai denoting a selection of scheduling mode is established, which provide a valid intervenor interface for flood control consultation decision. according to the real - time requirement, a model of reservoir storage allocation is proposed, which embody basic idea of phasic compensation. passing the dynamic correction to cut down the disadvantageous influence that indetermination result in on the certain degree, joining together the step alternation solving method, this model can maximally consider bias of decision makers, ensure the rationality and practicability of the solutions

    針對我國流域中普遍存在的並聯群結構,論文提出包含不同防洪點重要性的系數_ i和選擇調度模式的變量_ i的通用目標函數,為防洪會商決策,提供了有效的人工干預介面,根據實時性要求提出動態分配防洪分配方法,體現了相機補償的基本思想,通過動態修正在一定程度上可以削減不確定性造成的不利影響,結合分步迭代求解技術,能限度體現決策者的偏好,保障解的合理性和可操作性。
  4. The shelter, a huge converted warehouse, is the largest of its kind in the city and is equipped with a kitchen, separate mens and womens sleeping quarters, shower rooms, several tvs, a barber shop and booths where staff members assist residents in finding jobs

    該收所系由一間型倉改建而成,收了來自洛杉磯市區的好萊塢及著名的貧民區等地共約四百位民眾,是洛城此類收所中規模的一家。所內設有廚房男女睡鋪理發廳淋浴室等,甚至還裝有幾架電視,小辦事處里並有工作人員協助遊民就業。
  5. Cave began to hammer in the former qin dynasty jianyuan 2002 ( year 1366 ), amended after the generation of this 492 caves exist. 45, 000 square meters of colorful murals, sculptures 2415 president, is now the largest treasure trove of grotto art. one of the most abundant elements. 1987 was listed by unesco as world cultural heritage

    洞窟始鑿於前秦建元二年(公元366年) ,后經歷代增修,今存洞窟492個,壁畫45000平方米彩塑雕像2415尊,是我國現存石窟藝術寶中規模、內豐富的一座。
  6. The subject recommends the sending and receiving sms through smg network and ismg network, explains the main content of cmpp, sgip and the network game ( games developed on the basis of brew and j2me ) on the whole, mostly, the subject introduces the main content of message paradise, including overall design, structure design, database design and all respects, it can make us clear about the framework and development of the cell phone message game, it has offered the overall solution for the thing that the cell - phone receives and dispatches messages and plays games, which makes us able to realize the sending and receiving of message, the game reminding, public information sending, statistics of the web page report, message charge ( including according to piece charge, real - time monthly payment, non - real - time monthly payment ), customer service support, game ' s control and a series of functions of the game

    本課題介紹了通過聯通網關或者移動網關發送簡訊的過程,闡述了cmpp協議和sgip協議的主要內以及網路游戲(主要是基於brew和j2me開發的游戲)的體內主要的是,本課題介紹了簡訊樂園的主要內,包括總體設計、結構設計、數據設計等各個方面,可以讓我們清楚的了解手機簡訊游戲的架構和開發過程,本課題為手機收發簡訊、玩游戲提供了全面的解決方案,使我們可以實現簡訊游戲的發送和接收、游戲下發提醒、公共信息的群發、網頁報表的統計、簡訊游戲的收費(包括按條收費、實時包月記費、非實時包月記費) 、客服支持、系統監控等一系列功能。
  7. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水電站的下游一級水電站,電站總裝機量252mw ,總4 . 3億m ~ 3 ,壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
  8. ( 3 ) for the contents are so complicated, and system is very magnificent, we emphasised expound the system analysis and design of mgis extensively and deeply from data - type, content, structure and characteristic that involving almost all geoscience ; analyse all treatment course of datum in mgis with dataflow chat ; carry on data - library design. collectivity structure design, interface design, software and hardware design ; organize scheme of source and process ; flow, and overall make geophysics - data - analysis - subsystem for example to display system framework of mgis

    ( 3 )由於mgis內復雜、系統龐,本文只進行了mgis的系統分析和設計,從數據類型、內、結構和特點對多源地學數據做了廣泛和深入的論述,內涉及所有地學學科;用結構化分析方法分析了各學科數據在mgis中的處理過程;進行了系統的數據設計、總體結構設計、界面設計和軟硬體設計;提出了mgis的數據組織方案、綜合處理流程和系統構架圖;以地球物理數據分析子系統為例來說明mgis各個子系統的致面貌。
  9. The research of reservoir design flood is one of basic works in this subject. it is based on the reasons, and the actual conditions of baipenzhu reservoir are combined, the following contents are researched in this paper : 1. according to the actual conditions of baipenzhu reservoir and through the compare of parameters estimation methods, a objective and having fine statistic characteristics p - iii frequency curve distribution parameters estimation method of proximate baipenzhu reservoir is putted

    正是基於這種考慮,本論文結合白盆珠水的實際情況,本著理論性與實用性相結合的原則,重點研究以下內: 1 、根據白盆珠水的實際情況,對各種參數估計方法進行比較,提出一種客觀、有良好統計特性、適用於白盆珠水的p ?型分佈參數估計方法; 2 、利用實測流量資料推求設計洪水過程; 3 、分析計算可能洪水( pmf ) ; 4 、對兩種方法計算的設計洪水過程進行調洪演算,推求水特徵水位。
  10. The create index operation can be minimally logged if the database recovery model is set to either bulk - logged or simple

    如果數據恢復模型被設置為量日誌模型或簡單模型,則可以記錄少的創建索引操作。
  11. This paper includes four chapters. atc, which is anxious to be solved, is studied from three aspects, which are optimal power flow calculation in power systems, calculation of ttc and atc in power pool model and atc calculation in bilateral exchange model

    本論文共分四章,分別從區域電力市場優潮流計算、電力( pool )模式下傳輸量( ttc )和atc計算、雙邊交易模式下atc計算等三個方面,研究和解決了當前電力市場運營中急待解決的atc課題。
  12. In the last part of the article, the author combed the developing track of the newspaper narrative, and pointed out that with the development of internet, the original forms and content of newspaper narrative had changed, the appearance of electronic newspaper narrative and the establishment of electronic newspaper database were inevitable developing tendency

    本文後部分對報紙新聞敘事的發展軌跡進行了梳理,指出隨著網路媒體的興起,報紙原有的敘事方式和內已然發生了很的變化,電子報紙新聞敘事的出現和構建電子報紙數據,是一種必然發展趨勢。
  13. Research results show that the existing population in the reservoir area has exceeded the population capacity of land, and its is very difficult that rural relocates all resettled in the reservoir area. the land - based agricultural resettlement is still a reliable resettlement approach for rural relocates, despite of the limited bearing capacity of land in the reservoir area. thus, extending the resettlement environment capacity by fully and reasonably utilizing the land resources and developing the hill ecology agriculture has realistic significance for tgp resettlement

    盡管三峽區土地人口量有限,但以土為本的農業安置仍然是農村移民穩妥的安置途徑,因此,充分合理地開發利用區國土資源,建立山地生態農業發展模式,對于擴區安置量,保護和改善區生態環境,促進區移民的可持續安置具有重要的現實意義。
  14. A design of the web - based tax audit system is provided. the main contents of the thesis include, the system structure combin the merit of the b / s structure and the c / s structure was desiged, which accommodated the characteristic of the tax audit system. the structure not only realized the thin browser, but also avoided the complexity of the system maintenance

    本文分析了web數據技術的結構、原理,詳細論述了web數據介面技術的新進展,給出了基於web的稅務稽查系統的設計與實現,具體內包括:設計了以b / s結構為主,與c / s結構相結合的稅務稽查系統網路結構,適應了稽查系統數據量而廣的特點,既實現了瘦客戶端要求,又避免了系統維護管理的復雜性。
  15. Some connection pool settings include initial capacity and maximum capacity : initial capacity is the initial number of connections in the connection pool ; maxcapacity is the maximum number of connections in the database

    某些連接池設置包含了初始量和量: initial capacity是連接池中的初始連接數目; maxcapacity是數據中的連接數目。
  16. Two main contents of designing the database are proposed, one is to retrieve zipped data according to some rules, which is fulfilled by a few procedures together and can be controlled by input parameters. anther is to clear up the real - time data stored in database timely, which is fulfilled by using dts function in sql server 2000, and the data out of time can be deleted or saved as a access file

    數據的設計中重要的是兩個內,一個是要將壓縮的離散的數據按照一定的規律返回,這個任務是由幾個存儲過程協同完成的,可以輸入參數控制返回;另一個是,實時數據量積累在數據倉中,要定時清理過期數據,因此使用microsoftsqlserver2000的數據導入導出工具dts完成了過期數據的刪除或者選擇保存為access文件。
  17. To decide upon the optimal recovery model for a particular database, you should consider both the recovery goals and requirements for the database and whether you can manage log backups

    無論數據小或文件組結構如何,您都可以選擇簡單或完整(量日誌)恢復模式。從根本上講,佳的選擇或數據取決于該數據的恢復目標和要求。
分享友人