最高蓄水位 的英文怎麼說

中文拼音 [zuìgāoshuǐwèi]
最高蓄水位 英文
top water-level
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水位 : stage; water level
  1. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂電站於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引式開發。正常1268 . 0m ,大閘31m ,庫容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  2. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸階段以及同時考慮本區強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍處于穩定狀態;驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮驟降及本區大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破壞;建壩后平推力對右岸古滑坡體穩定性的影響分析可以看出,在危險的工況條件下,壩體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致壩體失穩破壞。
  3. ( 2 ) calculation of landslide stability indicates that landslide stability is worse and worse if reservoir is sluiced and water level is going up, and the worst condition will happen when the water level drops from 175m to 145m and six degree earthquake overlaps

    滑坡穩定性有限元分析表明,當時,隨著的上升,滑坡穩定性越來越差,為不利的工況是程175m降至145m同時加度地震的情況。
  4. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地利樞紐工程,由於該工程河床覆蓋層深度深達147 . 95m ,是壩體度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力移及壩體在竣工期、期等各個階段可能產生的破壞進行了認真研究。
  5. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基敏感的部,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基平鋪蓋防滲方案,分別按竣工期和運行期的不同工作情況進行了有限元非線性計算分析;對左岸陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  6. On the other hand for four main vegetation typies, which are picea crassifolia, forests sabina przewalskii forests, bushes and pastureland, whose soil permeability function was analyzed from angle of its physics, capacity of water, storing water in it. the results show as follow : permeability function of soil is controlled by quality of soil hole. the quality and quantity of soil hole under picea crassifolia forests are the best, and the permeability also is the best

    另外,從土壤物理性質、量、貯量等角度對祁連山苔蘚雲杉林、祁連圓柏林、亞山灌叢林、牧坡草地4種主要植被類型的土壤滲透功能進行分析,結果表明:土壤的滲透功能主要由土壤非毛管孔隙度的質和量決定的,苔蘚雲杉林土壤非毛管孔隙度的質和量好,它的滲透也好;雖然亞山灌叢林的滲透功能次之,但由於它所處的置和面積大,現實貯量在祁連山四種主要植被類型中大。
  7. However, the correlated property gradually disappear and seismic activity decrease when water levels come to the highest levels of the fist stage project and correspondingly trigger earthquake with 4. 7 magnitude

    但是,研究表明,當達到一期工程,並誘發了4 . 7級地震后,和地震的相關性逐漸消失,地震的活動性明顯降低。
  8. China is enjoying buoyant growth rates, low inflation, one of the highest savings rates in the world, and manageable levels of public debt, the wef ' s global competitiveness report 2006 - 07 said. however, a number of structural weaknesses need to be addressed, including those in the largely state - controlled banking sector, the report warned

    世界經濟論壇發布的2006 - 2007全球競爭力報告中提到,由於中國實行謹慎的宏觀經濟調控政策,經濟發展一直保持著增長低通脹的勢頭同時,中國是全球儲的國家之一,國債可管理平也居世界前列。
分享友人