有鐵路的 的英文怎麼說

中文拼音 [yǒutiěde]
有鐵路的 英文
railwayed
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : 4次方是 The fourth power of 2 is direction
  • 鐵路 : railway; railroad; rail
  1. Possessing special feeder lines and a fleet of container trucks, we can receive export and import cargoes transported by reailway, and provide services as discharging, dispatching, distribution and transiting etc. in shanghai or to all places of china

    專用線、集裝箱運輸車隊,可承辦進出口貨物進站、交接、裝車發運、分撥轉運等業務及進出口貨物市內運輸和跨省市貨物轉運。
  2. Father s a railroad president and many times millionnaire, but the son s starving in frisco, editing an anarchist sheet for twenty - five a month.

    他爸爸是一條總裁,好幾百萬家產,可兒子卻在舊金山挨餓,編著一份無政府主義報紙,每月二十五塊。 」
  3. The most of tsr is the freight lines. it was built by the sugar mill factory from a sugarcane plantation

    當初準備不夠,即使到了嘉義,都還不知道這條存在。
  4. Subjection of nature ' s forces to man, machinery, application of chemistry to industry and agriculture, steam - navigation, railways, electric telegraphs, clearing of whole continents for cultivation, canalisation of rivers, whole populations conjured out of the ground - - what earlier century had even a presentiment that such productive forces slumbered in the lap of social labour

    自然力征服,機器採用,化學在工業和農業中應用,輪船行駛,通行,電報使用,整個整個大陸開墾,河川通航,彷彿用法術從地下呼喚出來大量人口, - - - -過去哪一個世紀料想到在社會勞動里蘊藏這樣生產力呢?
  5. All depredations on lands being opened up by the railroad

    留下土地破壞痕跡
  6. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具結構新、工藝復雜、體積大、運輸困難,將常規橋梁廠製造橋梁、經過運梁到工地、邊鋪邊架進行橋梁製造與架設傳統施工模式應用到該線是行不通,必須在現場預制橋梁、並採用專門運架梁設備進行橋梁架設,因此箱梁製造、架設施工成為該線施工技術攻關重點和難點。
  7. Article 35 the planning of any railway track, station, junction area and other related facilities within a planned urban area of a city shall be brought in line with the overall plan of this city

    第三十五條在城市規劃區范圍內,、車站、樞紐以及其他關設施規劃,應當納入所在城市總體規劃。
  8. Condition of fundamental facility that the capital can provide : convenient transportation on land and water, complete water and electricity supply, appropriative railway, the dragon gate crane for packing to unload the goods, work place, wharf, workshop over 20, 000 kilometers and smooth land

    項目引資地可提供基礎設施情況:水陸交通便利,廠區供水、供電設施齊備:廠內專用線,裝卸貨物龍門吊和作業場所俱備,水運碼頭,2萬多平方米廠房建築,土地平整。
  9. We have a railway for mineral oil, a canal harbor and a truck team. the mineral oil delivery has a special tank, railway and car. the mineral oil can not be polluted in transportation

    白油專用線一條,運河碼頭一座,專用汽車隊,使白油做到專罐、專線、專車運輸,保證白油質量在運輸途中不受
  10. The essay analyzes the differences of calculation methods of passing capacity between existing lines and passenger dedicated lines, explores the relationship between length of passenger flow section of passenger dedicated line and passing capacity, redefines the standard train for discount coefficient, and analyzes the change tendency on average discount coefficients of medium speed train and the high - speed stop trains versus high - speed non - stop trains, and the change tendency on train proportion of different high - speed stop trains and the passing capacity of high - speed train in passenger flow section is also provided

    摘要分析了客運專線通過能力計算與既有鐵路的不同之處,探討了客運專線客流區段長度與通過能力之間關系;重新選定了扣除標準列車,分析計算了中速列車和高速停站列車相對于高速直達列車平均扣除系數變化趨勢,以及不同高速停站列車比例變化時,客流區段高速列車通過能力變化趨勢。
  11. Existing high - speed ' s temporary criterion in china aim at high - speed wheel - rail railway simply, but plane and vertical section ' s design criteria for maglev railway which run at over 350km. p. h still have no criterion to comply with

    我國現京滬高速暫行規范,只是針對時速在200 350公里高速輪軌,而時速在350公里以上高速磁懸浮平縱斷面設計標準還沒可以依據規范。
  12. The kap shui mun bridge is the world s longest cable - stayed span carrying both road and railway

    汲水門大橋是世界上最長一條兼和行車鈄拉橋。
  13. The demise of the third avenue el in the mid - fifties and changes in new york zoning laws in 1960 caused blocks of that avenue to be transformed from a street sprinkled with antique shops, bars, and restaurants to yet another anonymous boulevard

    50年代中期高架停駛和1960年紐約分區法修改,使得該街區由散落古董店、酒吧和飯店轉變成了沒個性林蔭大道。
  14. As one of the most important necessary part of high speed locomotive, the bogie frame ' s property has significant impact on running quality and safety of locomotive. on the basis of making detailed finite element analysis and accessment of it ' s mechanic property, the design theory of frame has been probed. such work is of momentous significance in pushing forward the development of high speed train in china

    轉向架構架是高速機車最關鍵部件之一,其性能對機車走行品質和安全性具重要影響,對構架結構進行詳細限元分析並對其力學性能進行評定,在此基礎上對構架設計計算理論進行探索,對推動我國高速發展具重要意義。
  15. Cowperwood had implicit faith in the future of the street railway.

    柯帕烏對於市內前途抱絕對信心。
  16. According to the situation request, we combine with the fact on the railway for the time being, raised the whole views and suggestions to the railway improvement, the first : to realise railway shareholding entreprises is the basic way of railway improvement winder the public ownership circumstance, the second : it is gotton the whole locatim to the function of ministery of rail ways, railway bureau. the branch of railway bureau and the units of railway department, it is designed the whole developing frame that the funtion of ministry of railways is macro - controler, the railway bureau or its branch is management substance which ouur legal qualifaction the unit of railway department is the basic product unit, the third : it describes kinds of faults on the present four level management, and tolal the data auording to the fact

    根據形勢要求,結合目前實際情況,對當今改革提出了整體看法和建議:第一、實現企業股份制是公制條件下改革根本出;第二、對道部、局、分局、基層站段功能給予了整體定位;設計了道部功能是宏觀調控者,局或分局為法人代表經營實體,基礎站段為生產基本單位整體改革框架;第三、對目前四級管理體制種種缺陷作了描述,並根據實際情況進行了數據統計。
  17. In our country, many railway lines which were built in mountainous area have heavy gradient and curves with small radius. so it is difficult to improve them and a great amount of cost is needed in the modification of them

    由於我國幅員遼闊,相當多處于山區,線坡度大、曲線半徑小、建設標準低,如果按照三大幹線標準改造線使之適應提速要求,改建很困難,所需人力物力不亞于修建新,不適合我國目前國情。
  18. The journey, which started off last friday from vancouver, the starting point of the pacific railway, is an intentional symbolic act reminding people of the painful connections between early chinese immigrants and the railway

    旅程在上星期五從太平洋起始點溫哥華開始,這是一個意圖象徵性行為,它讓人想起早期中國移民與這條之間讓人感到痛苦聯系。
  19. About yunnan narrow gauge railway the gauges of most of the china railways are 1435 mm. there is the railway of the metre gauge of yunnan

    中國大部分軌距是1435mm標準軌,可在雲南省軌距較窄,叫雲南窄軌
  20. Based on the study of the existing calculating methods, three new methods, namely the probability method, worst - situation method and simulation method, are proposed and the suggested values of their parameters are given

    在對既客運站旅客最高聚集人數計算方法研究基礎上,提出3種新計算方法,即概率法、最壞情景法、模擬法,同時提出了各種方法參數建議值。
分享友人