未測定損失 的英文怎麼說

中文拼音 [wèidìngsǔnshī]
未測定損失 英文
unmeasured loss
  • : Ⅰ副詞1 (沒) did not; have not 2 (不) not Ⅱ名詞1 (地支的第八位) the eighth of the twelve ear...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ動詞1 (減少) decrease; lose 2 (損害) harm; damage 3 [方言] (用尖刻的話挖苦人) speak sarcas...
  • 測定 : determine; determination; setting-out; admeasurement; assignment; assay; finding
  • 損失 : 1. (失去) lose 2. (失去的東西) loss; wastage
  1. Present methods generally based on the statistics of earthquake damage, expert experiences, theory analysis and experimental researches have obvious advantages, disadvantages and certain scopes of application ; ( 2 ) different prediction methods should be adopted against different building conditions, sites, intensity and experiences etc to predict earthquake damage of buildings for prospective accuracy, dependability and availability ; ( 3 ) earthquake damage matrix, which is the foundation of earthquake damage prediction, of 7 kinds of building in the urban areas of zhangzhou city under intensity 6 to 9 has been set up. the damage conditions of different buildings under different intensity are as followings : all kinds of structures are basically intact under intensity 6 ; the reinforced concrete structures are basically intact under intensity 7, but other kinds of structures are destroyed slightly ; the reinforced concrete structures are still basically intact while other kinds of structures are destroyed intermediately under intensity 8 ; the reinforced concrete structures are destroyed slightly, single - story factories and open houses are destroyed intermediately and other kinds of structures are destroyed seriously under intensity 9 ; ( 4 ) the results of earthquake damage predicting of buildings embody the damage when earthquake happens in the future. thus, further identifications and reinforcements should be considered to buildings that will be destroyed intermediately or more under the earthquake with 10 % exceeding probability in future 50 years ; ( 5 ) the direct economic losses caused by damage of buildings resting with the area, structural type, intensity and damage of all kinds of buildings are the main part of the losses of the city in an earthquake ; ( 6 ) the direct economic losses increased progressively toward high intensity by 2 or 3 times

    基於上述研究,得出的主要結論有:建築物震害預是一個模糊的、系統的、復雜的問題,現有的方法很多一般都是以震害統計規律、專家經驗、理論分析和試驗研究為依據,有其自身的優缺點和一的適用范圍;應針對不同的建築物條件、場地條件、地震強度和已有經驗等,採用不同的預方法進行建築物震害預,以使預結果達到預期的精確性、可靠性和可操作性;建立了漳州市區7類建築物在6度9度地震作用下的震害矩陣,成為指導抗震防災的重要依據,各類結構的震害情況表現為: 6度地震作用下各類建築物基本完好; 7度地震作用下除鋼筋混凝土結構基本完好外其餘以建築輕微破壞為主; 8度地震作用下鋼筋混凝土結構仍以基本完好為主而其餘建築以中等破壞為主; 9度地震作用下鋼筋混凝土結構以輕微破壞為主,單層工業廠房和空曠房屋以中等破壞為主,其餘建築以嚴重破壞為主;建築物的震害預結果體現了來地震來臨時的震害程度,在編制漳州市區抗震防災規劃時,對于遭遇50年超越概率10的地震影響發生中等以上破壞的建築物應考慮進行抗震鑒和加固;由建築物的破壞所造成的直接經濟是城市地震經濟的主要部分,重慶大學碩士學位論文中文摘要其主要與建築物總面積、結構類型、地震烈度和各類建築物的震害程度有關;不同烈度造成的直接經濟按2一3倍向高烈度方向遞增,漳州市區直接經濟由6度至9度的比例關系為1 : 2 . 8 : 8 . 6 : 22 . 8 ;遭遇基本地震設防烈度( 7度)時,漳州市區直接經濟約4 . 5億元,無家可歸人員約40000人,且以磚木結構和多層磚混結構的震害最大;地震造成的人員傷亡主要與建築物倒塌及嚴重破壞的程度和總面積以及震時的建築物室內人數密切相關,地震時無家可歸人員主要與住宅倒塌、嚴重破壞及中等破壞的程度和總面積以及城市人均居住面積密切相關。
  2. Abstract : the causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    文摘:分析了金陵石油化工公司煉油廠二套常減壓裝置加熱爐存在的因蒸汽吹灰器漏水,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度高,煙氣熱量回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、煙氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.結果表明,本次技術改造解決了因蒸汽吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提高到90 %以上
  3. The causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    分析了金陵石油化工公司煉油廠二套常減壓裝置加熱爐存在的因蒸汽吹灰器漏水,蒸汽引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度高,煙氣熱量回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、煙氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.結果表明,本次技術改造解決了因蒸汽吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提高到90 %以上
  4. Aluminium and aluminium alloys - anodizing - assessment of quality of sealed anodic oxidation coatings by measurement of the loss of mass after immersion in phosphoric acid chromic acid solution without prior acid treatment

    鋁和鋁合金.陽極氧化.預先酸處理的浸入磷酸鉻酸溶液后質量以評估密封陽極氧化鍍層質量
  5. Analysis of tea ; determination of loss in mass of unground tea at 103 c

    茶葉的試驗.磨碎茶葉在103下的質量
分享友人