板樁組 的英文怎麼說

中文拼音 [bǎnzhuāng]
板樁組 英文
sheetpiling
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工織進行綜合闡述,並就人工挖孔、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔施工採用鋼筋砼護壁確保挖孔的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. 3. in applications, the structure of stabilizing piles with pre - stressed anchor cables can be associated with retaining wall, combined bolting and shotcrete, precast concrete lagging ( plain, troughlike, archlike shapes ), and so on, which enlarge the application areas of this structure

    3 、在實際應用中,預應力錨索抗滑可與砌石擋墻、噴錨支護、預制擋(平、槽形、拱形等)聯合作用,形成多種形式的合結構,從而可擴大這種結構型式的應用范圍。
  3. According to elasto - plasticity theory, with the help of finite - method program ansys, the paper undertakes the computer analogue tests about the bearing capacity of pile tip arranged by orthogonal principle, and attains the relations of pile - tip bearing capacity to embedment depth, pile diameter, cohesion, internal friction angle and modulus of deformation. by the means of mathematical statistic, regression equation of the ultimate bearing capacity calculated by finite element method is gained through the regression analysis of 81 group data from the computer analogue tests. by comparison and analysis of the values calculated by finite - element regression equation and the values of in situ loading test, the regression equation is gained which calculates the size effect for base resistance of large diameter pile

    根據彈塑性理論,運用大型有限元軟體ansys按正交設計理論對端承載力進行模擬計算,獲得端承載力與長(埋置深度) 、徑、粘聚力、內摩擦角及變形模量等主要影響因素的關系,並採用數理統計方法,對81ansys模擬試驗結果數據進行回歸分析,得到有限元法確定端極限承載力的回歸公式,並將有限元法回歸公式計算值與現場小壓載荷試驗值進行比較分析,得到大直徑端阻的尺寸效應系數計算公式。
  4. Set the bop stack on the stump and close the hydraulic connector, and then secure it

    將防噴器吊坐到甲試驗上、關液壓爪形連接器,並固定。
  5. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用合有限元方法計算大型施工結構問題具有現實意義。
  6. At the same time, the corresponding programs on the above two methods can be compiled in frotran90 respectively, which are used to analyze the influence of several factors on behaviour of barrette pile group and barrette pile group - soil - cap interaction, including collocation of pile, ratio of length to width, pile spacing, ratio of depth to equivalent diameter, ratio of modulus of pile to soil, possion ' s ratio, the finite layer, the number of piles etc. lastly a series of model tests on vertically - loaded bahaviour of single pile are made, tests results are analyzed, and the causes of tests failure are preliminarily discussed in this paper

    分析了群布置形式、長寬比、之間的相對距離,徑比、土剛度比、泊松比、有限壓縮層深度以及群根數等因素對壁和壁?土?承臺的相互共同作用問題的影響。論文最後做了一和圓形模型試驗,對試驗數據進行了分析,並對試驗中存在的問題進行了初步探討。
  7. Hammer not only the single pile hammer with hard combinations precast concrete plant pipe pile, steel sheet pile, the pile

    該錘不僅可單錘與合打植混凝土預制管、方、鋼、灌注
  8. After years of development, interaction characters of piles, rafts and foundations are widely applied in engineering practice. literatures on actual settlement and development process of pile - raft foundations show that substance of pile - raft foundations " settlement consists of many parts and then produces whole compressing distortion. it will take many years or even more years to finish distortion

    高層建築的、承臺(或筏) 、地基共同作用特性,經過多年的研究發展,已逐步開始應用於工程實踐中,縱觀許多描述?筏基礎的實際沉降和沉降發展過程的文獻可知:?筏基礎沉降實質是由多個主要分量成,進而產生的整體壓縮變形,並且需要歷經數年甚至更長時間才能完成的過程。
分享友人