架橋機 的英文怎麼說

中文拼音 [jiàqiáo]
架橋機 英文
bridge gerder erection equpment
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : machineengine
  1. Hzq40 120 bridge building machine

    120型運一體架橋機的技術使用
  2. Experimental study on overspan safety of counterpoised travelling bridge - erecting machine

    配重行走式架橋機過跨安全性試驗研究
  3. Research into the technical scheme of type - spj900 32 bridge erector

    架橋機拼裝主梁施工工藝
  4. Structural strength research for 64 type military - used beam joggle - type bridge layer

    窄幅整體橫移式架橋機在斜交中的應用
  5. Renovation proposal and application for tracklayer and bridge - erector running system amp; amp; power system

    架橋機走行動力系統改造方案及應用
  6. Assembly type bridge girder erecting equipment used at electrified railway section

    拼裝式架橋機設斜交梁施工技術
  7. When the prefabricated plant is under the viaduct, the monolithic box girder is lifted by the gantry crane and transported by the special rotary traversed platform, and then transported and erected by the bridge girder transporting and erecting machine

    當預制梁場設在高下時,採用提梁提起整孔箱梁,通過特製旋轉式橫移平臺喂梁,運一體式架橋機運梁和梁。
  8. The erection of a 42m precast segmental box girder with dp450 bridge girder erecting equipment

    改裝架橋機設斜的經驗與施工技術探討
  9. Regulations for railway bridge erection by girder - erecting machine

    鐵路架橋機梁規程
  10. Spj 450 32 type fabricated bridge girder erection machine

    32拼裝式架橋機
  11. A whole span box girder erecting technology by girder erecting equipment going through a tunnel and portal

    整孔箱梁架橋機穿越隧道及隧道口梁技術方案
  12. Spj 300 40 modular bridge erecting machine

    40型拼裝式架橋機
  13. This paper also makes brief description of the technical specifications, mechanical structure, major features of the italian beam transporting and erecting machine with type of nicola yj - 550, which was introduced firstly in china and chosen carefully in combination with the site conditions. the future beam erection and relevant design and construction can find the reference from description of this paper in terms of erection process for box beam, working efficiency of the italian beam transporting and erecting machine with type of nicola yj - 550, issues and revelations concerning about box beam erection, special beam erection method to avoid three legs supporting

    採用義大利nicolayj - 550型運梁一體進行箱梁設是結合現場實際開展技術攻關、精心選定的施工方法,該型架橋機為國內首次引進,文中就其技術參數、組成結構、主要特點進行了簡要介紹;文中闡述的箱梁設施工工序、運梁一體的作業效益、梁施工應注意的問題及啟示、梁施工克服「三條腿」的方法等均可作為今後箱梁設及與箱梁設相關的設計、施工工作的參考。
  14. Have bore stage car, grab, fork - lift truck, self - propelled to bridge machine, booth shop machine, roller, bulldozer, land leveler, tong carries car of stage of build by laying bricks or stones of line of pump, hydraulic pressure, crane, complete station the construction such as appearance, ride meter, dynamo and detect professional equipment 850 ( set ), technology of average per capita equips twenty - five thousand eight hundred yuan

    擁有鉆孔臺車、挖掘、裝載、自行式架橋機、攤鋪、壓路、推土、平地、砼輸送泵、液壓襯砌臺車、吊車、全站儀、測震儀、發電等施工及檢測專業設備850臺(套) ,人均技術裝備2 . 58萬元。
  15. The bridge erection has well developed in our country

    國內架橋機已初具規模,形成了競相發展的格局。
  16. Problems in using of bridge - erecting machine cz b - 160 and solutions

    160型架橋機使用中的問題及解決辦法
  17. Norway lg600 - 35 bridge machine

    35型架橋機
  18. Application of self - propelled simple bridge girder erection machine in construction of ganding highway

    拼裝式架橋機在電化區段上梁的施工
  19. Welding workmanship for big type movable model for main beam manufacture of bridge girder erection machine

    75節段拼裝式架橋機液壓系統設計實踐
  20. Based on characteristic value buckle analysin method of finite elements theory, this paper analyzes and calculates the main working condition of bridge erecting machine jq600 with box cross section beam

    摘要本文根據有限元理論中的特徵值屈曲分析方法,對jq600型箱梁架橋機的主要工況進行了穩定性分析計算。