桁梁橋 的英文怎麼說

中文拼音 [héngliángqiáo]
桁梁橋 英文
girder bridge
  • : 桁名詞[建築] (檁) purlin
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  1. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨度懸臂澆築施工的各種形式掛籃施工工藝進行了比較和總結,對連續剛構懸臂澆築掛籃施工中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂澆築施工的新型架斜拉式組合掛籃,並進行了可行性分析計算和設計。
  2. One of the most noticeable structrual differences between the cable-stayed bridge and the truss and girder types lies in the field of flexibility.

    斜拉架和式類型之間,在結構上的一個最顯著不同之處,在於柔度方面。
  3. Damage identification and diagnosis of existing steel truss bridge

    既有鋼桁梁橋損傷識別與診斷方法研究
  4. Modal identification of steel truss bridge based on ambient excitation

    基於環境激勵下鋼桁梁橋的模態識別
  5. Research on reinforcement technique to enhance lateral stiffness of steel truss bridge on existing railway

    既有線鋼桁梁橋橫向剛度加固技術
  6. Spatial analysis on continuous plate - truss compositesteel truss bridge across the wuhu changjiang river

    蕪湖長江大連續板結合的空間結構分析
  7. The static analysis of the long span plate - truss composite cable - stayed bridges. first, the cr formation on the geometric non - linear structural analysis is introduced. next, the structural discretization of cable - stayed bridge, the stiffness matrix the formation of nodal force and the simulated construction system are introduced

    首先介紹了本文採用的桿系結構幾何非線性問題的分析方法? cr列式法,其次介紹了板結合斜拉的結構離散及桿單元、單元的剛度矩陣以及節點力的形成方法,然後介紹了斜拉施工模擬體系的形成。
  8. A horizontal beam, as of steel or wood, used as a main support for a building or bridge

    大樑一水平的鐵制或木製的條,用來作為建築物或的主要支撐物
  9. Corrosion protection of steel truss girders of caiyuanba changjiang river bridge in chongqing

    重慶菜園壩長江大防腐
  10. Erecting technique of movable steel truss beam for the transferbridge at north bank of yangtze river on xinyi - changxin railway

    新長鐵路長江輪渡棧活動鋼架設技術
  11. This paper presents the corrosion protection system and part of the coating workmanship for steel truss girders of the caiyuanba changjiang river bridge in chongqing

    摘要介紹重慶菜園壩長江大的防腐體系及部分塗裝工藝。
  12. The authors describe the modelling of a railway steel truss bridge with long - span in order to analyse the detailed distribution of stress for members and nodal plates in main truss, the detailed deformation and stress distribution due to frame effect on transversal bracing plane in truss bridge, and the detailed distribution of stress in important parts of the steel plate girder bridge with initially transversal deformation by using sseb in this article

    本文建立大跨鐵路鋼桁梁橋和鋼板結構模擬分析數學模型,說明了鋼桁梁橋桿件和節點板詳細應力分佈、平面框架詳細變形與應力分佈和有變形缺陷鋼板重要部位應力的模擬分析結果等問題。
  13. The transverse stiffness limitation index ? the permissible ultimate width / span ratio b / l of the continuous steel truss girder of railway bridge is analyzed in accordance with the analytic theories of random vibration of train ? bridge time - variation system and the required derailment coefficients and comfort of drivers and passengers in train running through the bridge. the limitation index in question may be referred to in the design of the continuous steel truss girders of railway bridges

    基於列車-時變系統隨機振動分析理論,按照上列車脫軌安全系數和司機、旅客舒適度的要求,對鐵路連續鋼桁梁橋橫向剛度限值-容許極限寬跨比b / l進行了分析,對鐵路連續鋼桁梁橋的設計具有一定的參考作用。
  14. All the researched results prove the era method is steady and suitable for those structures : spacecraft 、 beam - plane structure 、 truss structure 、 frame 、 bridge, etc. on the basis of the consideration of the above, the major job of the article is to discuss how to identify the parameters of the long - span structure with the method of era under the action of the wind loads

    但是,國內外已有的相關文獻,對于下面的結構均進行了相關的研究,如航天器、板結構、架、框架、等。基於以上考慮,本文主要工作,就是探討在風激勵荷載作用下,如何用era演算法識別大跨空間網格屋蓋結構的模態參數。
  15. It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel

    梅溪河大為一凈跨達288米的上承式鋼管混凝土拱,是目前亞洲同類型中跨度最大的,其主拱肋採用8根920mm的鋼管,通過腹桿及平聯形成鋼管混凝土空間架,拱上立柱亦採用鋼管混凝土排架,造型新穎美觀。
  16. The results of the research indicate that the assembled highway bridge steel truss is an effective means to resolve the common problems of falsework over river for construction of cast - in - situ prestressed concrete continuous girders

    研究表明,採用裝配式公路鋼架解決跨河預應力混凝土連續現澆混凝土施工支架問題是有效的。
  17. This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field

    摘要主要研究了採用裝配式公路鋼架(通常稱為貝雷架)做為支架進行連續現澆箱混凝土的施工方法;研究了跨河施工支架的技術方案,特別是施工支架在墩上的剛性斜撐,同時結合現場試驗研究了施工支架的分析計算方法及變形。
  18. A plate - beam composite element suited to calculate through steel - truss composite bridges

    一種適用於下承式鋼結合計算的板組合單元
  19. Based on a series of testing, examination, research and analysis conducted how to lift the speed on nanking section, jinhu road, we explore the possibilities of solving the obstacles of nanking segment of bridges for realizing railroad speed - lift soon due to its subframes and steel plate beams. we produced authentic and convincing data. 3

    通過對京滬線南京段部分為實現鐵路提速而進行的一系列實驗、檢測、研究和分析,探討了成為制約干線提速瓶頸的下承鋼板及半穿式鋼進一步提高運行車速的可能性,為此類結構的提速提供了可信的依據。
  20. Three factors of carrying capacity, shippmg, traffic flux are considered among alteration and upgrade. carrying capacity upgrade aims at simply - supported girder bridge and arc bridge ( truss bridge and double arch bridge ) of sea - route nets. to navigation, headroom chiefly is required, secondlythe jacking - up technique and economical analysis are given attention to two or morethings. the simply - supported grider bridge and mono - arch bridge are touched upon in navigation upgrade

    在升級改造中主要探討了承載力升級、通航升級、交通流量升級三個因素。其中承載力升級主要針對航道網上的簡支和拱架拱和雙曲拱) 。
分享友人