梁桿 的英文怎麼說

中文拼音 [liánggǎn]
梁桿 英文
beam column
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : 桿名詞(桿子) pole; staff
  1. Destabilization laws of an arcuated built - up system bridge are provided, nonconservative force of hanger rods and members " bearing force are integrated in order to consider influence of hanger rods towards arch stability

    提出了拱式組合體系橋的失穩規律,將吊非保向力和構件受力結合起來考慮吊對拱穩定性的影響。
  2. To solve these problems they concocted hypotheses on how beams, rods and plates behaved under stresses, pressures, or loads.

    為了解決這些問題,他們關于和板在應力、壓力或負載下是怎樣變動的提出了假設。
  3. High - pressure vane motor with crossbeam puch rod for ship

    船用高壓橫式葉片馬達
  4. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄連、游式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以連沖擊為主,遇到特殊情況,用連沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因連沖擊機構連續工作,所以實現了自動沖擊鉆進,可提高鉆進效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地層、堅硬地層等特殊地層鉆進的困難,又很好地解決了沖擊鉆機效率低下的問題;採用直齒圓柱齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆塔採用液壓起立,減少了輔助作業時間。
  5. The shell is divided into orthogonal or oblique crossing girder systems, which make up a space rigid frame structure, then an analysis is made of the endogen force of the shell structure based on the curved lever space rigid frame structure

    該方法通過將殼體結構離散成相互垂直或斜交的曲系組成的空間剛架結構,進而分析曲空間剛架結構的內力,達到殼體內力分析的目的。
  6. Analysis the twist of pole change, beam of flection and spring coil of the form change and elaborated the decision its form to change of main factor, analysis and the discussion conclude theory in actually of application, change to the form of comprehension have importance of function and meaning

    摘要分析了的扭變、的彎曲和彈簧的形變,闡述了決定其形變的要素,分析和討論了結論在實際中的應用,對形變的理解有重要的作用和意義。
  7. Strengthening ill geologic section road chasm side slope with prestressed achor pile grid beam

    預應力錨加固不良地質地段路塹邊坡
  8. The longitudinal girder forms part of the parapets.

    成為欄的一部分。
  9. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到段以外附近區域的作用,在其兩端面上施加了由平面系結構分析所得的端面內力,另外,索力和預加力(縱向、橫隔橫向、斜腹板豎向)也施加在相應的位置,分析了箱形主在自重、索力和預應力作用下的空間應力效應。
  10. In the paper, the study of analysis method of internal force for curved - beam bridge structure analyzed by spacial method of curved - bar grillage finite element method is introduced

    本文對彎橋採用曲格有限元法進行空間結構分析時的內力計算方法進行了研究。
  11. Compared with the static method and kinematic method computing deformation directly, the method presented here bring high efficiency when calculating the influence surface of the internal force for curved - bar grillage

    與靜力法及直接求解位移的機動法相比,使曲格內力影響面計算效率得到了很大提高。
  12. We mainly produce shifting fork and release fork of large - scale and heavy - duty truck ; shifting fork, release fork, shifting block, choosing - gear shaft, reverse - gear shifting fork shaft, right - and - lfet steering joint arm, upper cross arm shaft, wheel hub, link rod of all kinds of cars right - and - left supports, nipbutton of train auto - girder parts ; centeral wedge, fixed lean - board of absorber ; shifting fork, erankshaft, link rod, under - link board, startup pole of motocycle ; mould forging of mine, construction machinery, textile machinery, non - ferrous metal industry, etc

    主要生產產品:大、重型卡車變速箱的撥叉、分離叉等;各種轎車變速箱的撥叉、分離叉、撥塊、選檔軸、倒檔撥叉軸、左右轉向節臂、上橫臂軸、輪轂、聯,火車自動部件的左右支柱、夾扣,減震器的中心楔塊、固定斜板等鍛件;摩托車的撥叉、曲軸、連、下聯板、啟動蹬總成;礦山機械、建築機械、紡織機械、有色金屬等精模鍛件。
  13. When we design the purlin of the metal roof, we made used of the continuous beam mechanic characteristic to find internal force

    工程設計時利用連續的分析方法獲得構件的內力,為此構建了一個用單元和二力單元構成的力學模型。
  14. With the actual locale incestigating, the actual locale testing and the theories analyzing of the reason of the diseases producing of the exceed limit of horizontal swing and steel pole ' s break, and summaried the reinforcing measure of the top bear armor plate beam

    通過對京廣線鄭州黃河大橋40米上承式鋼板橫向擺動嚴重超限及鋼梁桿件斷裂等情況的現場調查、現場測試和理論分析及病害原因產生的機理,總結提出了上承式鋼板的加固措施。
  15. Consideration of dimensional effect of pile structure using modified stiffness matrix of beam - rod element

    用修正的梁桿單元剛度陣考慮樁的尺寸效應
  16. The foundation engineering is typical in both excavation depth and scale, on the basis of in - situ investigation, the design optimistic of retaining wall was discussioned in this paper, the mian reseaches including : the using of fem optimazition methods of rods system ; the delvopment of programs for optimazition of imbedding depth of structure based on matlab and for whole design optimaziton of the retaining structures based on ansys, under the two controlling factors of the saft coefficient and the reliability probability about the whole damage of retaining atructure ; the analysis on the m index of soil, the depth of retaining structures imbedded in the rock and the overall optimistic design of retaining structures

    該基礎工程不論在開挖深度還是規模上都很具有代表性。作者在現場調研的基礎上,探討了基坑支護結構設計優化問題。主要研究內容可以歸納為:應用基於m法的彈性地基梁桿系有限元方法;在圍護結構整體穩定性安全系數與可靠性破壞概率兩種控制因素下,編寫了嵌巖深度優化的matlab程序與圍護結構整體設計優化的ansys批處理程序;進行了地層抗力比例系數反算、地下連續墻嵌巖深度優化與地下連續墻結構體系整體設計優化。
  17. A port tyre crane has various parts and complex structure, which is made up plenty of beam - bar and shell elements, manual calculation can not guarantee the precision while finite element method needs onerous structure modeling and a great deal of date input. the finite element analysis and modeling of the port tyre crane are difficult because of complex structure and various loads. in order to fit further more design and exploitation of the same type as well as the upgrade of the production i study a kind of parametric software for structure analysis of the port tyre crane, it can reduce the difficulty of modeling and structure analysis as well as improve efficiency

    港口輪胎式起重機部件繁多、結構復雜,由數目眾多的梁桿與板殼組成,其結構設計和力學分析使用傳統的手工計算方法難以保證精度,有限元方法則需要繁重的結構建模和大量的數據輸入,並且要求分析人員具有相當的力學知識和有限元基本理論。港口輪胎起重機結構的復雜性、載荷工況的多變性導致港口輪胎起重機結構有限元建模和分析工作效率低、難度大。針對這種情況本課題研發了一套港口輪胎式起重機結構的有限元參數化分析軟體,以適應同類機型的進一步設計開發和產品升級換代,降低建模和分析的工作難度,提高工作效率。
  18. Considering the state - of - the - art of such kind of structural system, the author gives a simulative analysis of the system with the feiyunjiang bridge in wenzhou zhejiang province as an engineering example using three methods : 3 - d beam or bar fem, classical plate / shell fem and virtual laminated element method. the virtual laminated element method may deals with many key issues in simply - supported - continuous system easily such as the matter of actual material or virtual material, mesh replacement

    針對國內外對先簡支后連續結構體系的研究普遍缺乏深度這一現狀,我們以浙江溫州瑞安市飛雲江大橋引橋為工程背景,運用空間梁桿系有限元、經典的板殼單元法以及虛擬層合單元法對該體系進行了施工模擬分析。
  19. In view of the construction peculiarity of non - bracket construction trait of y - shape pier upper plate beam in goughexin road viaduct project, the author uses the beam - rod finite element to calculate the whole construction period by steps, compares the result with engineering practice, and finally proves, the calculation can offer reference for the construction and design of non - bracket upper plate beam

    摘要針對共和新路高架橋y型墩上蓋無支架的施工特點,採用梁桿單元,對上蓋施工過程的各工況進行了分步計算,並與現場測試結果進行比較, ?上蓋無支架施工設計提供依據。
  20. Based on the virtual work increment equation of updated lagrangian formulation, tangent stiffness matrix of spatial beam / truss element is obtained. according to base assumptions and catenary equation of cable, the iterative formulations of tangent stiffness matrix and nodal force of the spatial two - node catenary cable element are put forward. therefore the entire geometrical non - linear finite element theory for the analysis of suspension bridges is established

    本文的研究工作和取得的主要成果有: 1 .將大旋轉小應變空間)單元與兩節點空間懸鏈線索單元結合起來,形成了一套完整的適合於懸索橋結構分析的幾何非線性有限元計算方法。
分享友人