梯度風方程 的英文怎麼說

中文拼音 [fēngfāngchéng]
梯度風方程 英文
gradient wind equation
  • : Ⅰ名詞1 (梯子; 樓梯) ladder; stairs; steps; staircase 2 (姓氏) a surname Ⅱ形容詞(形狀像樓梯的...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : Ⅰ名詞1 (空氣流動) wind 2 (風氣; 風俗) practice; atmosphere; custom 3 (景象) scene; view 4 ...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. 2. dynamic meteorology : equations of motion ; geostrophic, ageostrophic and gradient winds ; thickness and thermal wind ; continuity equation ; stream function ; vorticity equation ; divergence equation ; omega equation ; rossby wave ; ekman layer ; numerical weather prediction

    2 .動力氣象學:運動地轉非地轉及熱成連續流函數渦輻散奧米茄羅斯貝波埃克曼層數值天氣預報。
  2. The improvement on conditioning and aeration of double fluids system by atomizing and controlling the air humidity was fully introduced in this paper, as well as solved the shortcomings of high moisture grades between the mirage soaked wind - pipeline and the surface of the grain, and between the superstratum and substrate after conditioning by a serios of managing measures, such as changing the way of ventilation, adjusting the aeration time by controlling the air - humidity of ventilation

    摘要詳細論述了雙流體調質通系統在水汽霧化、空氣濕控制面的改進,包括改變送式、調整干濕空氣通時間等管理措施,較好地解決了調質過中的水霧浸濕道與糧面、糧堆上下層水分大等的儲糧問題。
  3. Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period

    本論文結合國家重點工項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報案和調法,為公伯峽水電站施工期建設提供技術支撐。
  4. The results of numerical experiments, using the four - dimensional variational data assimilation system of the nonhydrostatic mesoscale model mm5, show that : the tangent linear model and adjoint model conducted by keeping the " on - off " switches the same as the basic state, can provide a good approximation of the first - order information to the nlm perturbation and a good descent direction for the minimization procedure ; switching on and off at every other time step in the kuo cumulus parameterization scheme do n ' t impact the convergence rate of cost function ; the existence of the switches do n ' t impact improvement to the mm5 model rainfall prediction because that not only specific humidity, but also wind, temperature and pressure are assimilated into the model

    非靜力中尺數值模式mm5的四維變分資料同化系統進行的數值試驗結果表明: 「開關」變量保持與基態一致,所構造的切向線性模式能夠提供關于非線性模式擾動的一階近似,伴隨模式所計算的值能夠為最小化過提供較好的下降向;郭氏降水參數化案中對流每隔一個積分步的交替發生並不影響目標函數最小化的收斂速; 「開關」變量的存在也不影響將、溫、氣壓和比濕結合起來同化對mm5降水預報準確性的提高。
  5. In this paper a numerical method for equations of transport and biodegradation in the fractured media is discussed. because the equations consist of terms related to advection, diffusion, biochemical as well as the term of exchange betwen the fracture and the porous media, it is very difficult to find their solution. in order to find more efficient method for solving these equations, several numerical methods for the equations without biochemical terms are discussed first. the numerical results show that the cubic spline method can be used to solve advection flow dominated problem which often occurred in the fractured media. then, the equation with both advection - diffusion term and biochemical term are discussed. the splitting - operator is used to decouple the advection and diffusion terms with biochemical term in the equations. the way to determine the smaller time step for solving fast biochemical terms is introduced through comparing the order of characteristic time of biochemical term with that advection ( diffusion ) term. numerical simulation results show that good agreement between analytical solution and experiment result is attained

    本文討論了含裂隙介質地下水污染物輸運與生物降解非線性組數值求解法.含有對流項、擴散項、生長、死亡、吸附、解吸、趨化和孔隙與裂隙介質界面間的交換項的非線性偶合,使演算法十分困難.本文討論了無生化過時的幾種求解法,數值結果表明:用三次迎插值法對常見的對流項占優勢,且場變量有較大的問題較適用.在討論有生化反應過時,利用對流項與生化反應項的特徵時間量級估算,給出了求生化過作用子步的時間步長估算辦法.用上述法所得到的模擬結果與解析解、無化學反應和有化學反應的實測值對比,吻合很好
  6. The scheme has a novel feature that the extraction location of the tracer is not fixed at the center location of the grid, but first optimized at the location where the gradient is maximum in the grid domain, and then by cumulonimbus and uniformity test, the final tracers can be decided

    該演算法的特色是反演的位置並不固定在反演網格的中心位置,而是通過分析的法使反演的位置得到優化,再經過積雨雲檢測和灰分佈均勻檢驗,剔除不適合用來反演的目標物。
  7. For convenience of grid refinement implementation the nonstaggered grid system based on the structured orthogonal grid scheme is adopted. in order to eliminate the possible pressure wiggles when nonstaggered grid is used, except for the use of the momentum interpolation method ( small wiggles still appear when the method is adopted alone ), a new method is proposed and applied in the same time. in the new method a pressure - gradient difference term is added to the flow velocity in each control volume interface when dealing with the pressure - correction equation

    本文基於結構化正交網格,為便於實施網格加密,採用了變量同位存儲的同位網格體系;為平抑該網格體系下的壓力振蕩問題,除採用動量插值法外(單純採用該法不能完全平抑振蕩) ,首次提出了在壓力校正的界面流速中添加壓力差值項的法,從而完全解決了建築場模擬中同位網格下可能出現的不合理壓力場的問題。
分享友人