梯級電站 的英文怎麼說

中文拼音 [diànzhàn]
梯級電站 英文
cascade
  • : Ⅰ名詞1 (梯子; 樓梯) ladder; stairs; steps; staircase 2 (姓氏) a surname Ⅱ形容詞(形狀像樓梯的...
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 電站 : power station電站船 generating ship
  1. Along with the implementation of experiment of straight power supply to big consumer step by step, as the largest rundle hydropower station in our country, we must consider straight power supply to big consumer ( a new electric power marketing ) with the electric power of gezhouba - three gorges as an important composed part of electric power marketing, let it become to one of the important means of gaining the more benefits to our company

    直供作為一種新的營銷模式,隨著大用戶直供試點工作的逐步展開,作為我國最大的梯級電站,必須把三峽?葛洲壩的力直供作為力營銷的有機組成部分,作為實現公司效益最大化的重要手段之一。論文在分析了三峽區域潛在的直供對象后,提出了三峽力過網直供和專線直供的思路。
  2. Short - term optimal dispatch of cascaded hydropower stations based on improved ant algorithm

    基於改進螞蟻演算法的短期優化調度
  3. ( 3 ) according to compensation benefit formation cause and scientific, rational, impartial, equitable distribution principle, put forward distribution project of water supply and generation electricity compensation benefit in the main stream of the yellow river

    ( 3 )根據補償效益成因分析及科學、合理、公平、公正的分配原則,提出黃河幹流補償效益中的供水和發效益的初步分配方案。
  4. Aiming at the compensation benefits calculation combined with development layout of the yellow river mainstream cascades is now taken into account the dynamic characteristic of different level years, the compensation benefit simulation model of the yellow river mainstream cascade reservoirs is adopted to calculate the power generation compensation benefits of the yellow river upstream run - of - river power stations in three level years of 2000, 2010 and 2020

    摘要針對以往補償效益的研究都是靜態計算而言,本文結合不同水平年黃河幹流的滾動開發規劃,考慮不同年代補償效益的動態特性,採用黃河幹流水庫補償效益的模擬模型,計算了2000 、 2010以及2020三個水平年黃河上游徑流式梯級電站的發補償效益。
  5. In order to promote the integrated efficiency of electric power generation of both stations, this thesis demonstrates the study on cooperating operation of the two - hydropower stations of cascade

    為了提高兩座的發效益,論文對石泉、喜河兩個梯級電站進行聯合優化調度研究。
  6. This paper describes a series of preliminary results in combination with actual situations of hydropower development in dadu river by means of establishing river basin water rainfall regime monitoring network, carrying out multi - link large system comprehensive dispatching study of water, electricity and network in group reservoirs, conducting the control mode study of cascade hydropower stations, power supply range and development lime sequence, planning environmental impact assessment in a river basin, as well as the dispatching patching of gongzui, tongjiezi cascade hydropower stations

    大渡河流域水開發有限公司結合流域水開發實際,通過建立流域水雨情監測網,開展群庫水、、網多環節的大系統綜合調度研究,流域梯級電站控制模式研究、流域供范圍及開發時序研究,流域規劃環境影響評價研究,以及龔嘴、銅街子調度實踐,在流域梯級電站統一調度研究方面已取得了初步的成果。
  7. It can be used as reference for the protection of storage areas and the construction of the other cascade hydropower stations in the lancang river

    從區域尺度計算漫灣水生態供給足跡和生態需求足跡,以為漫灣水庫區生態環境保護和后續幹流水梯級電站建設提供參考。
  8. Design of computer monitor system in kuerbin cascade hydropower station

    庫爾濱梯級電站計算機監控系統設計
  9. Influence of construction of the supahe river cascade hydropower projects on the river basin ecological environment

    蘇帕河梯級電站建設對流域生態環境的影響
  10. Comprehensive evaluation on water quality for cascade hydropower stations in supa river basin based on improved bp neural networks model

    神經網路模型的蘇帕河流域梯級電站水質綜合評價
  11. Implementing unified dispatching of cascade hydropower stations in a river basin is essential for hydropower development in river basin to carry out the scientific concept of development

    摘要實行流域梯級電站統一調度,是流域水開發落實科學發展觀的必然要求。
  12. This paper also puts forward some countermeasures for the relevant policies and regulations related with unified dispatching in river basin as well as the issues linking with power grid

    對流域梯級電站統一調度的相關政策法規以及與網調度銜接等問題,提出了若干對策。
  13. By studying factor of short - term optimization dispatching of cascaded hydropower, summarized regularity of short - term optimization dispatching of cascaded hydropower and inner - plant economical operation

    實現了在廠經濟運行的基礎上來實現整個梯級電站的優化運行,達到增加發效益的目的。
  14. The jinping hydroelectric power station, located between from kala to the outlet of the yalong river, is designed as the first huge project of the river, which is rich in hydro logical energy

    錦屏一是位於我國水能資源「富礦」之一的雅礱江卡拉?江口河段的「龍頭」水庫梯級電站,具有良好的補償調節作用。
  15. However, presently, the problems of data exchanging between dispatching center and substations have not been coped with adequately, which has hampered making unmanned substations a reality

    但目前一些流域梯級電站調度中心與各現場之間的信息交互問題仍然沒有得到很好的解決,這在一定程度上阻礙了「無人值班(少人職守) 」目標的實現。
  16. Based on the previous studies, the 2 - d laterally averaged temperature model for the temperature prediction of the huge and deep reservoir is developed in this paper. in the mean while, the movement mechanism of the turbulent buoyant flow in reservoir and the rule of the thermal stratification forming, developing and varying are probed. the model is then applied to the huge reservoir of xiluodu on jinshajiang river and the cascade power stations on yalongjiang river

    本文在總結前人研究成果的基礎上,探討了水庫湍浮力流的運動機理,以及溫度分層的形成、發展和變化規律,建立了適用於大型深水庫水溫預測的立面二維水溫模型,並應用於超大型水庫? ?金沙江溪洛渡和雅礱江梯級電站各水庫的水溫預測,取得了一系列創新性研究成果。
  17. In this article, the author study the short - term optimization dispatching of cascaded hydropower in order to get a practicable mathematical model and arithmetic. basing on deep analysis and generalization of yilihe cascaded reservoir, the author set up a short - term dispatching mathematical model and an inner - plant economical operation model to simulate the real operation process. dynamic programming method ( dp ) is effective to solve the several problem and discrete differential dp ( dddp ) is a reduce dimension tool

    本文緊密結合雲南省境內的以禮河水庫的工程實際,在對其進行深入分析和概化的基礎上,建立了反映實際問題特點的梯級電站短期調度模型和廠內經濟運行模型,動態規劃方法以其擅長求解多階段決策過程問題而被本文選為優化工具,由於dddp的降維效果顯著,從而使動態規劃在本研究模型中得以運用。
  18. On the basis of the trends of technique development of the computer supervision system, according to the practical project ? donglei chouhuang irrigation district computer supervision system and the used modern network techniques, this paper presents computer supervision system model based on web techniques, which is suitable to for the project such as the step pumping station group, substation group and other similarities

    本文根據計算機監控系統的技術發展趨勢,結合了現代網路技術,以東雷抽黃灌區計算機監控系統為工程背景,提出了一種適合於群、變群等類似工程構建大系統的解決方? ?即基於web技術的計算機監控系統。
  19. This paper introduces the electricity market status in and out of the country and the power industry in fujian province. it investigates how to set up fujian province electricity market. it provides a layered network model about the mainstream and branch cascaded hydro plants and the generation plan in one day considering the assistant serving. it also provides some software to resolve the problem about the hydro - thermal coordination. and provides some solutions in a certain exetent

    針對福建省水豐富、較多的具體情況,採用網路流法構建了一個完整的解決閩江各支流、幹流復雜梯級電站經濟調度的模型,建立了計及輔助服務的發市場日交易計劃的模型,開發了解決水火聯合經濟調度及相關的報價體系的初軟體,並進行了初步試算和分析。
  20. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)水是黃河幹流上的一個梯級電站,為了減少征地移民損失,經對炳靈水(塔坪壩址)尾水斷面在劉家峽水庫不同運行方式下的水位與流量關系進行分析研究,在總裝機和年發量基本不變的情況下,充分利用劉家峽水庫汛限水位,將樞紐選址在其庫尾內。
分享友人