樁基動測技術 的英文怎麼說

中文拼音 [zhuāngdòngshù]
樁基動測技術 英文
dynamic pile testing
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 名詞(技能; 本領) skill; ability; trick; technique
  • : 術名詞1. (技藝; 技術; 學術) art; skill; technique 2. (方法; 策略) method; tactics 3. (姓氏) a surname
  1. Dynamic measurement technology of foundation pile with reflect wave method and frequency - initial velocity method and its application

    初速度法及其應用
  2. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心、預制預應力混凝土空心的成工藝、填石壓漿混凝土的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心礎的質量檢方法及標準;並在此礎上,深入分析了側、端承載能力,提出了填石壓漿混凝土空心的設計計算理論和方法。最後,論證了空心新工藝的可行性、適應性、經濟性,為大力推廣應用空心提供了可靠的資料。
  3. Basic black - box testing and white - box testing are successfully carried out. in white - box testing, the statement coverage and branch coverage are achieved ; static analysis and dynamic analysis are also implemented. the static analysis mainly used to generate flow graph while the dynamic analysis serves program instrument, technique realization object, subprogram and the detailed coverage and the calculation of operation time of the documents

    原型系統實現了本的黑盒和白盒試,其中白盒試實現了語句和分支覆蓋;實現了匯編試的靜態分析和態分析,靜態分析主要是生成程序的流程圖,態分析主要是利用程序插實現語句和分支覆蓋率及在多個試用例驅下的綜合覆蓋率的計算和運行時間及內存使用情況的統計。
  4. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程的實驗室承載力監方法與設備、如何使土方開挖機械現代化及對周圍建築的臨方法上,本文提出了現場利用聲波層析成像鋼砼內部質量的方法與程序,並得出了聲波層析成像是砼態質量檢的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、坑空間和時間效應影響理論來分析逆作法施工過程中坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的挖掘的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理;分析了逆作法施工期間的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振對土體邊坡穩定產生影響的觀點,並分析了在環境振影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監墻體的最大應力、應變位置。
  5. From the point of view of testing equipment, the data acquisition system with more precision and larger dynamic range is fundamental for pile foundation testing

    從檢設備的角度看,量精度高、態范圍大的數據採集系統是礎檢礎。
  6. Dynamic pile testing

    樁基動測技術
  7. Research and developmetn of pile foundaton dynarmic testign technology it can test completeness of a pile foudation and quality defects in it, it can be also used to evaluate load bearign fo a signle pile, it can reduce cost of a project and improve economic efficency

    樁基動測技術應用研究,可快速檢身的完整性及質量缺陷,評估單承載力,可降低工程成本,提高經濟效益。
  8. Technical specification of dynamic pile tests for highway engineering

    公路工程規程
分享友人