樁架 的英文怎麼說

中文拼音 [zhuāngjià]
樁架 英文
pile frame
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  1. Anna : a silver stake ? a crucifix

    ?十字
  2. B 160m of dual 2 - lane approach ramp of piled in - situ deck construction for connecting to existing roads in the lok ma chau control point ; 120m of two - lane overbridge for passenger vehicles

    興建一條160米長,現場基橋面施工的雙程雙線分隔接駁斜道,以連接高引道至落馬洲控制站的現有路面
  3. The trend over the world is toward fulldwarf trees, staked or trellised.

    全世界的趨勢是發展完全矮化果樹,立木或搭棚
  4. Finically, the dynamic property of portal water injection sheet piles is analyzed in this paper, and the influence on dynamic property of pile length and distance between piles is discussed in detail

    此外,還探討了門式水力插板的動力特性,以及長和間距對結構動力特性的影響。為進一步指導工程實踐提供了理論依據。
  5. In order to evaluate the stability of the upper structure of the cross and the pillar - soil compound foundation, and provide more theoretical bases for design and construction of this type of jacking frame - overhead cross in future, the 2d fem analyses for bearing - deformation of the frame structure of the cross and the pillar - soil compound foundation are carried out, and some relevant conclusions are obtained

    為了評判該立交橋上部結構與-土復合地基的穩定狀態,同時為今後此類型頂進框立交橋的設計與施工提供更多的理論依據,對該立交橋的框結構與-土復合地基的承載變形進行了平面有限元分析,取得了相應的認識。
  6. This machine is available to driver different kinds of piles, such as prefabricated concrete piles, steel pipe piles, steelplate piles, etc. it is a convenient machine for construction of building, bridge, port

    樁架適用於打植混凝土預制、鋼管、鋼板,是建築、橋梁、港口施工中機動靈活的工施工機械。
  7. Some suggestions about the pile raft foundation designed on the spatial truss theory are proposed, and the tentative design of an eighteen story frame - tube building and the field observation for the pile raft foundation in all the processes of construction are also presented

    摘要提出了按空間桁理論設計筏基礎的建議,並對18層框筒結構進行了試設計和施工全過程的現場實測。
  8. To counter the main reasons of piles ' displacement and inclination, i. e., 1 ) greater lodging after removal of pile cap ; 2 ) inclination of pile frame ; 3 ) driving into ballast course ; 4 ) obvious rolling of excavated mud surface, a set of effective measures dealing with deviation of marine driving are offered

    針對其中影響跑位和傾斜的主要原因,即: 1 )起帽后倒伏大; 2 )樁架不垂直; 3 )碎石層上沉; 4 )挖泥泥面起伏大,總結出一套控制水上沉偏位行之有效的方法。
  9. Land piling, space frame system, landscaping, air - conditioning, audio electronics, burglar alarm and security, electrical, uninterruptible power supply, fire services, fountain, lift, escalator and passenger conveyor, mechanical plant and equipment, repair and restoration of historic buildings, etc

    土地打、空間構系統、綠化工程、空調裝置、音響裝置、防盜及保安裝置、電力裝置、無間斷供電裝置、消防裝置、噴水池裝置、升降機、自動梯及乘客輸送帶裝置、機械裝置、維修及修復有歷史性樓宇工程等
  10. Fixed railway equipment. material for telecommunication and signalling overhead lines. caps for posts and small pillars

    鐵路固定設備.通信和信號裝置空線路器材.立柱和標用罩
  11. The domestic and abroad research about retaining structure with double - row piles is summarized, and its disadvantages are shown in this paper. two - dimensional nonlinear plane - strain fern analysis, which emphasizes the pile - soil interaction, is developed for portal water injection sheet piles with the software ansys

    本文在總結國內外對雙排支護結構的研究現狀的基礎之上,結合通用有限元軟體ansys ,對門式水力插板進行了二維非線性平面應變有限元分析,就其中的關鍵問題? ?與土的共同作用進行了研究。
  12. Conversion design of pile driving boat

    淺談打樁架的改裝設計
  13. Hammer not only the single pile hammer with hard combinations precast concrete plant pipe pile, steel sheet pile, the pile

    該錘不僅可單錘與樁架組合打植混凝土預制管、方、鋼板、灌注
  14. Can not pile frames, dual vibratory hammer or hammer in high tonnage joint use of large diameter pile

    還可以不用樁架組合,雙錘或多錘在高噸位大直徑管上聯合使用。
  15. Multi - function technical improvement for no. 5 pile barge

    新穎的輕型樁架結構
  16. Finite element analysis of pile holder reconstruction of

    樁架改造方案的有限元分析
  17. It is highly reliable in pile driving : the perpendicularity of the driven pile can be ensured due to the excellent rigidity of pile frame, secure connection, low gravity centre of main machine, big grounding area and very strong stability of anti - overturning in the course of movement and pile driving

    可靠性高:打樁架鋼性好、聯接牢靠、主機重心低、接地面積大、機在行走移位及打過程中具有較強的抗傾覆穩定性,並能保證打入垂直度。
  18. The hydraulic pressure control system of piling atteration of extent and holding pile

    樁架變幅和抱液壓控制系統
  19. Pile frame - test method for performance

    樁架性能試驗方法
  20. Classification of pile frame

    樁架分類
分享友人