樓板構造 的英文怎麼說

中文拼音 [lóubǎngòuzào]
樓板構造 英文
floor framing
  • : 1 (樓房) a storied building 2 (樓房的一層) floor; storey 3 (房屋或其他建築物上加蓋的一層房子...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 樓板 : [建築] floor; floorslab
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  1. The main components of the latter are multi - rib sandwich panels, including floor slabs and wall slabs. reinforced concrete conformation columns are set where the longitudinal walls and latitudinal walls intersect and copulative beams are set where floor slabs and wall slabs intersect. they play a role of linking and transferring loads, bearing a small part of loads at the same time

    無骨架體系的主要承重件是密肋夾芯(包括和墻) ,縱、橫墻相交處設鋼筋混凝土(連接)柱,墻相交處設連系(圈)梁,連系梁和柱主要起連接和傳遞荷載作用,也承擔少部分荷載。
  2. Reduce the use of timber by using alternative structural solutions ( e. g. metal hoarding, system form - work, metal form - work, semi - pre - cast flooring system, pre - cast roofing, dry walls and other structural means such as steel structural section, left - in formwork, etc. )

    改用其他結方案(例如金屬圍、標準化模、金屬模、半預制系統、預制天面、干墻及其他結措施,如鋼架和內留的模等) ,藉此減少使用木材
  3. The key studied areas are the paishanlou, daban, dayintaogou, wujiazi gold deposits. in terms of the study of regional structures, geophysics, and geochemistry, and necessary tectono - physical and numerical modeling, as well as studies of ore - forming and ore - controlling structures, the author holds that the detached - ductile sheari ng zone of the metamorphic core complex is the main ore - controlling structural system, and the regional mineralization is related with the regional ore - forming structural systems which are controlled by compounding of regional structural systems with different time and grade

    重點以排山、大、大櫻桃溝、五家子等金礦礦田調查為基礎,以區域地質、地球物理、地球化學研究為背景,輔以成礦物理模型、數學模型,通過成礦、控礦研究,將本區金礦的成礦確認為變質核雜巖拆離滑脫剪切帶,並且是與區域成礦系統相聯系,在不同時期、不同級序、不同力學性質體系成分復合條件下成礦。
  4. Somehow the shape is associate with a praying gesture, or a ships bottom turning upward. the components of a building, pillars, beams, and the roof are totally replaced by four shells. though it is the result of advanced architecture idea and technological entrepreneur, the surface bricks are traditional

    教堂兼具傳統與創新,簡潔的型,卻給人許多聯想,像雙掌閉合默禱,又像船底倒置,薄殼結型取代了建築的柱子、橫梁、和墻面,是理念的突破,技術上的挑戰,而外貼的燒釉面磚,卻具有傳統中國風味。
  5. Through flat experiment and circle experiment, we research the causes of cracks before hardening of concrete and after. through ingredient experiment, we research the influence of shrinkage from some ingredient ( coal ash, crushed stones and fiber ). in addition, we test some methods of construction to strengthen the anti - crack capacity of r. c. slab in building sites

    通過平試驗和圓環試驗,研究了混凝土在終凝前和終凝后裂縫的各種影響因素;通過摻合料試驗,研究混凝土的一些摻合料(粉煤灰、碎石和纖維)對其收縮變形的影響;另外,還在施工工地進行一些增強抗裂能力的措施試驗。
  6. The laws of internal force distributing of this floor is summarized, such are : ( 1 ) structure as “ orthotropic slabs ” ; ( 2 ) abnormity of internal force distribution ; ( 3 ) greatly changing grads of negative bending values

    總結了該蓋結的內力分佈規律,即: ( 1 )上為「正交異性」 ; ( 2 )的內力分佈不均勻; ( 3 )的負彎矩值變化梯度大。
  7. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結安全性測試分析咨詢" ; "南京地鐵三山街站中及底樑柱節點技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  8. It has been found out that using a prestressed concrete flat slab floor can decrease the thickness of the floor slab, improve forced property and service functions of the structure, and so as to save materials, reduce cost and prevent the cracks of shrinkage and temperature

    採用預應力混凝土無梁蓋可以降低厚度,改善結的受力性能和使用功能,而且能節約材料,降低價,防止收縮和溫度裂縫的產生。
  9. A material nonlinear finite element analysis for the cast - in - place reinforced concrete hollow slab that occurs from initial loading, cracking, yielding to failing is carried on. the cracking load, ultimate load, the displacement rules and the principal stress distribution rules of the hollow slab under the vertical loads are obtained. a material nonlinear finite element analysis for the single span hollow flat - plate floor is also carried on

    其次對空心進行了從加荷、開裂、屈服直至破壞的全過程材料非線性有限元計算,得到了空心在豎向荷載作用下的開裂荷載、極限荷載及位移和應力分佈規律;還對單跨無梁蓋進行了材料非線性有限元計算,通過分析主應力場明確了柱上暗扁梁的作用;有限元計算的結果驗證了以上的理論分析並得到了一些重要的結論,對改進現澆空心無梁蓋的措施有重要的參考價值。
  10. 3 - wire strands with tensile strength of 1570 mpa were collocated in the lower precast concrete slabs of superposed floor. the manner of reinforcement lap and other detailing were brought forward. plane dimensions of the tested floor are 9m and 12m, and height is 180mm

    本論文通過對前期試驗的分析總結,選用1570mpa的三股鋼絞線作預制底的預應力鋼筋,提出了合理的側橫向鋼筋搭接方式和其它措施,並按照現行規范設計並製作了試驗結蓋平面尺寸9 12m ,厚度180mm 。
  11. The detail procedures of the loading test on the ultimate bearing capacity under different load cases and the author ' s first - hand experience during the tests are documented in the paper. based on the experimental performance, it has been verified that the superposed floor assembled by the precast - prestressed sandwich slab working under the design and the reliability of the lateral connecting character of the slab

    側縫內施加后張法無粘結預應力,在上利用側伸出的鋼筋相互搭接實現橫向傳力,變單向受力為雙向受力形成裝配整體式蓋結,可明顯改善蓋結的受力性能。
分享友人