模擬程序構造 的英文怎麼說

中文拼音 [chénggòuzào]
模擬程序構造 英文
construction of simulator
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : 動詞1. (設計; 起草) draw up; draft 2. (打算; 想要) intend; plan 3. (模仿) imitate
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 模擬 : imitate; simulate; analog; analogy; imitation; simulation模擬艙 boilerplate; 模擬電路 [電學] circ...
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  1. On the basis of the others, according to the constructional feature of the constitution of the composed soil nails, the computation mode of the he strut frame made of composed soil nails was set up to analyze the distortion of the he strut frame made of composed soil nails when it is stressed. with the engineering data, the strut frame made of composed soil nails is analyzed with the program ababqus, and the effects of the distortion characters, the property of the deposition of the ground, the mechanical property of the soil nails, the variation of the length and the separation of the soil nails, and the diametric of the mixing piles on the strut frame made of composed soil nails, and the distortion property of the strut frame made of composed soil nails under different ground conditions

    在總結前人的研究成果下,針對復合土釘墻的特點,建立了復合土釘墻受力變形的計算型,並結合工實測資料,運用大型通用有限元ababqus對復合土釘墻進行了有限元分析,詳細討論了復合土釘支護結開挖過中的變形特性、地面沉降性狀、土釘受力性狀;土釘長度變化、土釘間距變化、攪拌樁樁徑變化對復合土釘支護結的影響;復合土釘支護結在不同地基條件下的變形特性。
  2. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密肋復合墻板運用ansys ~ ( ( ? ) )進行數值、分析驗證的基礎上,對典型組合墻體在不同連接和不同荷載效應組合作用下的受力形態和破壞式進行研究;計算分析了復合墻體剪跨比、邊框柱截面尺寸、邊框柱配筋大小以及墻板內肋梁肋柱配筋等諸多因素對密肋復合墻體承載力及剛度的影響,得出其變化規律。
  3. On the basis of this, we selected rms as feedback variable and constructed the controller g : add this controller to the right of ion radial self - edlctric force equation like equation ( 1 ). we simulated the motion of ion beam by using muti - paticle code ( partice - in - cell ( pic ) code ). the results demonstrated that the beam halo of five different initial distribution is eliminated well under the same controller. the halo intensity of k - v distribution, water - bag distribution and parabolic distribution and be reduced to zero. in the case of 3 - sigma distribution and full gauss distribution, the result is agree with minimum limitation ( 10 " ) of halo intensity of factual high intensity accelerator

    在此基礎上,選擇a為控制變量,延遲反饋控制器g : g ( s glrrms ( s )一rms ( s ) ( 2 )同( l )式一致,將此控制器函數加在粒子徑向所受束自生場力方的右邊。利用多粒子數值( pic )進行了控制試驗。結果表明,用同一個控制器和同一個控制參數即可實現五種不同初始分佈情況下的束運一混飩的有效控制。
  4. Abstract : digital basinis made from digital elevation model considering spatial variability within a catchment. on the basis of digital basin, the digital approach to describing hydrological processes within a catchment is investigated. digital hydrological model is regarded as a modern physically - based modeling technique that includes a large amount of information. the case study on the shiguanhe catchment in the huaihe river basin, intensified observation field of gewex asian monsoon experiment project, has shown that the digital mode lperforms very well not only in simulating runoff processes at any specific site, but also in simulating spatial distribution and temporal variation of hydrological elements and state variable ( especially soil moisture ), if compared with traditional hydrological models. that provides solid foundation for full use of now available observation in formation and in - depth mining of hydrological data

    文摘:考慮流域下墊面空間變異性,基於數字高建了數字流域,並在此基礎上對描述流域水文物理過的數字方法進行了探討.文章認為,數字水文型是一種有物理基礎的包含大容量信息的現代技術.史灌河流域實例研究表明,數字水文型可以十分方便地輸出水文要素和狀態變量的空間分佈與時間列,這對充分利用現有觀測信息進行水文信息的深層挖掘創了條件
  5. Under the background of the research work - " expert system of hydraulic brake system design for saloon car, small and medium passenger car " for nanjing yuejin automobile group, in this paper, a set of special cad software for vihicle brake was developed in which the researchful object was brake, . the cad supporting software was pro / engineer and the developing language was vb. the project of discreted brake was raised and 3d graphic parametric library of typical parts and assemblies was established. 3d solid modeling and parameter - driven between dimensions and relations were accomplished using pro / engineer

    本文以南京躍進汽車集團的橫向課題「轎車、中小型客車液壓制動系設計專家系統」為背景,以制動器為研究對象,以pro engineer為cad支撐軟體,採用vb語言,開發了一套汽車制動器專用cad系統;提出了制動器離散化方案,建了參數化的制動器典型零部件三維圖形庫,使用pro engineer實現三維實體型以及尺寸與關系的參數化驅動;圖形庫系統採用參數化圖庫引用、管理機制並擁有一個開放的擴充介面;研究了pro engineer二次開發塊pro toolkit ,解決了同步式下定製界面的問題,並實現與pro engineer的通信;建立了制動過數學型,推導了制動方式並給出相關解法,編制了制動器數值分析建了制動器設計資料庫。
  6. Beginning form relation of basin - mountain, the tectonic evolution and the petroleum system and pool - forming process have been studied with the integration of structural physics modeling, balance profile reversion and other new testing technology. the main innovative achievements of the dissertation can be summarized as following : 1. on the basis of comprehensive analysis of yanqi basin relationship to tianshan orogenic belts, it was suggested that kuluketage faulted - upheaval was an aulacogen in early paleozoic, which undergone multiple opening - closing along with tianshan orogenic belts, and suffered extensively compressing in late hercyhian cycle and formed a " v - type " thrust - fold belt

    論文總的指導思想是以現代石油地質理論為基礎,以整體、動態、系統、綜合分析為原則,以成盆?成烴?成藏研究為主線,運用正、反演相結合的殘留盆地油氣成藏系統評價思路,採用物理、平衡剖面復原和多種測試新技術,從盆山耦合關系切入,研究含油氣系統成藏要素及其相互作用過,探討油氣成藏主控因素和油氣分佈的有性,取得如下創新性成果和認識: 1 、系統分析了焉耆盆地形成演化與天山帶的關系,提出盆地南側的庫魯克塔斷隆在早古生代為一大型裂陷槽,之後隨著天山帶的演化,經歷了多次開合運動。
  7. Based on analysis of the characteristics of the composite soil nailed wall, simulating the soil nail, concrete layer, deep mixing pile and step excavation, a model is established to calculate the deformation of the wall, compiled simple and applied program of one dimension fem ; according to the field test data and the calculated data by the fem software this paper has developed, the design method and deformation of the wall in xi ' an area is discussed. the shape of destructive sliding surface of the wall in loess strata in xi ' an area with deep groundwater is gotten. finally the lateral deformation distribution and the experiential formula to predict maximal horizontal displacement of the composite soil nailed wall are given

    針對復合土釘墻的特點,建立了復合土釘墻受力變形的一種計算型,該計算型可對土釘、面層、深層攪拌樁以及分層開挖等進行簡化;編寫了簡單實用的桿系有限元;結合工實測資料及有限元法分析的結果,探討了西安地區的土釘設計以及復合土釘墻的變形規律,得出了西安地區一般黃土在無地下水時的破壞滑動面形狀,復合土釘墻的側向變形曲線以及計算復合土釘墻最大水平位移的經驗公式。
  8. Results : the construction process included 4 stops : ( 1 ) to confirm the simulation object ; ( 2 ) to construct the micro data file ; ( 3 ) to design the system and to program ; ( 4 ) to run the program and forecast the result

    結果:昆明市城鎮職工醫療保險微觀分析建分為4個步驟: ( 1 )明確目標; ( 2 )微觀數據文件; ( 3 )型系統設計與編; ( 4 )運行與結果預測。
  9. In order to realize the function of this system, a virtual parts library was established with solidworks and three - dimensional parameterized modeling was realized at the same time based on the practical part prototypes, which have been used in mechanism kinematics scheme design experiments in the physical laboratory

    首先,以機運動方案設計實驗用到的實物零件為原型,用solidworks軟體對各類零件進行了三維參數化型,建立了一個虛零件庫。然後,根據實現系統功能的需要編制了相應的塊。
  10. In accordance with fact, the systematic structure is elaborated in the intelligent manufacturing system ; the model is established in the machining centers ; the automatic calculation of the dimensions chain is prevented ; the cell technique resources are selected in the system. for example : first, with the developing of manufacturing industry, a new mode of intelligent manufacturing has appeared. the paper elaborate the natural feature of intelligent manufacturing, proposes multiagents " architecture, and elaborates the means of the model building based on the available manufacture technique ( cnc : computer numerical control ; fms : flexible manufacturing system ; cim : computer integrated manufacturing ) 。 second, the paper introduces the fundamental theory of petri ' s net

    本文著重就以下幾個方面的內容進行深入闡述和探討: 1 .從現有製技術( cnc : computernumericalcontrol ; fms : flexiblemanufacturingsystem ; cim : computerintegratedmanufacturing )闡述智能製的特點,敘述了multiagent系統結,進一步闡述了系統分析、設計中建方法; 2 .介紹petri網的基本理論,利用它對某車間加工中心系統生產過建立型,反映整個系統的加工動態特性,用arena7 . 0語言進行研究,分析系統資源配置的合理性、高效性,為復雜的製自動化系統的建打下基礎; 3 .論述了cad / capp / cam ( computeraideddesign / computeraidedprocessplanning / computeraidedmanufacturing )智能化集成的網路結、數據通信等技術,對智能化工藝設計中的尺寸鏈的自動計算進行了探討,提出了lu分析演算法的原理及實現方法,編寫了計算機,為capp ( computeraidedprocessplanning )中的智能化設計提供了一個子塊。
  11. This paper discusses the design ideas hardware configurations and software programming of analog signals output and input circuit boards which used in the nether i / o interface system of marine simulator

    本文論述的是應用於船舶輪機系統的i o介面系統下位功能板卡中量輸入輸出卡的設計思想、硬體和匯編的編制。
分享友人